Skip to main content
Muhammad Yaseen

Muhammad Yaseen

Operator

FaisalabadMember since June 18, 2026
Operator
·

Experience

Operator - Medipak, Pharmaceutical company - Lahore

(2023-11)

Operator - Reshama Textile mill - Lahore

(2023-04 - 2023-08)

Compressor Supervisor - Ibrahim Fiber limited Polyester Plant - Faisalabad

(2008-07 - 2020-03)

Supervised compressor operations at a polyester manufacturing plant with extensive industrial equipment including power plants, boilers, compressors, water treatment plants, and chillers.

  • Power Plant: 04-Gas Turbine capacity of each turbine 15MW. Supplied by turbomach Italy.
  • Boiler: 03- Waste heat recovery boiler By Bono Energia Italy. Fire tube boiler of standard castle by Germany.
  • Compressor: 10-screw type air compressor supplied Atlas Capco Belgium. 03 gas compressor supplied by Enerproject Italy.
  • Water Treatment Plant: RO Plant Consist of 06 RO Units Production capacity soft water= 300 m³/hr. 05- Mixed Bed, Demine water capacity = 100m³/hr
  • Chiller: 04-Electric chiller each having capacity 1000 ton/hr by Trane America. 04 Absorption Chiller by Abroad China.

Education

B.Sc. - Punjab university

F.Sc. - BISE Faisalabad

Matric - BISE Faisalabad

Skills

Operator

Reviews

Related