Skip to main content
Rashid Sohail

Rashid Sohail

Planning Engineer

Talent
KarachiMember since October 12, 2026
Primavera-P6MS Project
·

Hire this person

Send a job offer directly to this candidate

Primavera-P6MS Project

About

Results-driven Project Management Professional with a Master's degree in Project Management and over 5 years of experience as a Planning Engineer in the construction and E&I sectors, including oil & gas and solar power projects. Proven expertise in project planning, scheduling, and execution using Primavera P6 and MS Project.

Experience

Planning Engineer (E&I) - Accrescent Engineers Pvt Ltd, Pakistan - Pakistan

(2024-03)

  • Prepare the schedule and finalize the base line with coordination of execution according to project timeline using Primavera-P6.
  • Plan and allocate resources effectively to ensure project milestones are met, including manpower, equipment, and materials.
  • Calculate the productivity rate and assign the budgeted units to each activity.
  • Prepare the cash flow chart and analyze the risk assessment.
  • Prepare the procurement plan and with coordination of supply chain and accounts department.
  • Monitor project progress against the baseline schedule, providing regular updates and reports to project managers and stakeholders.
  • Prepare the mitigation and catchup plan to become the project on track.
  • Calculate Man-hours for the project as per work scope.
  • Prepared the mobilization and logistic plan and shared with client to avoid any kind of delays.
  • Check the availability of material and fallow the planed activates to complete the tasks on time.
  • Facilitate communication and coordination between different departments and teams involved in the project to ensure alignment and smooth execution.
  • Assist in the preparation and management of project budgets, tracking expenditures and ensuring cost efficiency.
  • Attend the progress meeting and planning meeting with execution department on weakly bases and record the minutes of minutes.
  • Dealing in all contractual matters with Subcontractor and client and complete all the arrangements within the scope.
  • Prepare cost analysis sheets of all supply, construction bills and subcontractor bills to track the project cost.

Planning Engineer - MEP Solutions Pvt Ltd, Pakistan - Pakistan

(2023-12 - 2024-03)

Client: ARY Laguna Karachi Pvt Ltd.

  • Prepare/monitor working plan & prepare weekly and monthly look ahead plans.
  • Prepare Detailed Work scope with Equipment list in coordination with client.
  • Update Schedule & Monitor Progress in Primavera P6 on daily basis.
  • Calculate Man-hours for the project as per work scope.
  • Prepare the mitigation and catchup plan to become the project on track.
  • Prepared the mobilization and logistic plan and shared with client to avoid any kind of delays.
  • Check the availibity of material and fallow the planed activates to complete the tasks on time.
  • Fallow up for materials approvals from Client/Consultant and update the procurement log sheet.
  • Prepare Recourse Deployment Plan for the project by estimation & optimization of resources.
  • Update the resources in master plan and tracking for desired results.
  • Provide Daily, Weekly & Monthly Progress Report, Execution status to end user.
  • Attend the progress meeting and planning meeting with client on weakly bases and record the minutes of minutes.
  • Dealing in all contractual matters with Subcontractor and client and complete all the arrangements within the scope.
  • Attend the meetings with client and subcontractor to resolve the issues and prepared the meeting munities.

Electrical Engineer - Expertise Contracting Co, Saudi Arabia - Saudi Arabia

(2022-10 - 2023-07)

Client: Hadeed SABIC Saudi Arabia

  • Complete the WPR tanning for SABIC Plants and get the work permit receiver ID.
  • Monitor the PM & CM activities and coordinate with client and head office team at Shuqaiq Steam Power Plant.
  • Prepare the all-safety related document’s i.e. JSA, Hazard assessment and submitted to SEC safety department.
  • Supervisor the shutdown maintenance activities to install MOV’s and control panels.
  • Verify Additional Work from client and raise Variation Order (VO) to get Work Order (WO) for invoice purpose.
  • Held full accountability for overseeing resources, manpower, and scaffolding erection for all Electrical activities.
  • Submitted the Job completion certificates and as built drawings to client for site clearance.
  • Become thoroughly familiar with scope of work, all relevant contractual documents.
  • Submit the daily attendance sheet to head office and coordinate with supervisory staff to resolve the site issue.
  • Prepare Detailed Work scope with equipment list in coordination with clients for different projects.
  • Assist the Planning Engineer at head office to update schedule & monitor progress in Primavera P6 on daily basis.
  • Check the availibity of material and fallow the planed activates to complete the tasks on time.
  • Prepare Recourse Deployment Plan for the project by estimation & optimization of resources.
  • Provide Daily, Weekly & Monthly Progress Report, Execution status to end user.
  • Dealing in all contractual matters with Subcontractor and client and complete all the arrangements within the scope.
  • Attend the meetings with client and subcontractor to resolve the issues and prepared the meeting munities.

Planning Engineer (E&I) - Flowtronix Pvt Ltd. - Pakistan

(2021-10 - 2022-10)

Project: 135 KTPA Light Soda Ash Expansion, Pakistan. Client: ICI Soda Ash Khewra, Pakistan

  • Become thoroughly familiar with scope of work, all relevant contractual documents, Work Breakdown Structure (WBS) and Organization Breakdown Structure (OBS) etc.
  • Segregate the area wise drawings and complete study of work scope.
  • Prepare/monitor working plan & prepare daily weekly and monthly look ahead plans. Attain approvals for materials from Client/Consultant.
  • Check the availibity of material and fallow the planed activates to complete the tasks on time.
  • Prepare Recourse Deployment Plan for the project by estimation & optimization of resources.
  • Prepare Detailed Work scope with Equipment list in coordination with client.
  • Provide Daily, Weekly & Monthly Progress Report, Execution status, Delay Report
  • Update daily progress from Supervisors and monitor balanced work to control schedules.
  • Provide look-ahead schedule & next day plan to all area supervisors and monitor progress.
  • Conduct Daily meetings with all subcontractors to give work front, next day plan & resolve all site issues.
  • Monitor the cable laying activity (LT, HT, MV) as per standard and specification along with dressing.
  • Monitor daily activity & directly supervise like tray support installation, perforated cable tray, cable laying, glanding and termination.
  • Panels installation (LV, MV) Bus Bar coupling, torqueing, merging and inspection as per standers.
  • Monitor the transformer installation, BTD touring, earthing, complete the job with all aspects.
  • Fire alarm system and smoke detection system installation at MCC and verify the progress by site visit.
  • Prepare and verify all Contractual Invoices from Client.
  • Verify Additional Work from client and raise Variation Order (VO) to get Work Order (WO) for invoicepurpose.
  • Prepare cost analysis sheets of all supply, construction bills and subcontractor bills.
  • Deal in all contractual matters with Subcontractors.
  • Verify all Subcontractors invoice and maintain the record.

Planning Engineer (E&I) - Flowtronix Pvt Ltd., Pakistan - Pakistan

(2020-09 - 2021-09)

  • Thoroughly study the scope of work for project and submit the master plan to clients at initial stage.
  • Extract the quantities from drawings and compare with BOQ qty to calculate the variation at initial stage.
  • Prepare the resource plan for different sites before going to execution.
  • Prepare the Work Breakdown Structure (WBS) and Organization Breakdown Structure (OBS) for differentsites.
  • Ensure that the schedule is updated and maintained valid throughout the duration of the projects and that PM and team are aware of forwarding load and manpower availability.
  • Monitor the progress from all Projects and update the demobilization plan to control the budget.
  • Report Earned value in terms of earned man-hours and Value of Work done (VOWD).
  • Update daily report in P6 and Presenting daily and weekly progress report.
  • Prepared the catch up plan and attend the client meetings to complete the project in given time frame.
  • Review & verify the progress invoices/bills of sub-contractors and vendors.
  • Prepare cost analysis sheets of all supply, construction bills and subcontractor bills.

Area Planner (E&I) - DESCON Engineering Limited - Pakistan

(2020-01 - 2020-04)

Shutdown Maintenance: Pak Arab Refinery Ltd (PARCO), Pakistan. Client: PARCO Mid Country Refinery, Muzaffargarh, Pakistan

  • Complete the pre TA arrangement (P&IDs, Isometric drawing, JSA).
  • Collect the progress from site and update to Planning Engineer on daily bases.
  • Prepare the daily progress report and high light the bottlenecks to create the delay analysis.
  • Supervision and installation of control valves as per P&IDs drawing.
  • Installation of orifice plates, gas kits for control valves as per standard and specifications.
  • Tubing of transmitters and installation to perforated cable tray as per standards and specifications.
  • Monitor and control the cable laying, glanding, termination related jobs on site to complete the scheduled work with safe environment.
  • Installation & Inspection of Thermocouples, LTs, Cable glanding and termination on both ends (field and JBsides).
  • Supervised the calibration, installation of field instruments in DCS system and hot loop test, leak test and stork test.
  • Update Planning Engineer regarding daily progress from the Supervisors and calculate the balanced work.
  • Verify Additional Work from client and keep in record for invoice.

Area Planner (E&I) - DESCON Engineering Limited - Pakistan

(2019-11 - 2020-01)

Shutdown Maintenance: Pakistan Refinery Ltd (PRL), Pakistan. Client: Pakistan Refinery Limited, Karachi, Pakistan

  • Arranged the work permits as per HSE requirement to start the jobs on time.
  • Update daily progress from Supervisors and monitor balanced work to controlled schedules.
  • Monitored project progress and provided regular status reports.
  • Supported the project team in resource planning and allocation.
  • Provide technical expertise for assisting the supervisor with determining work scheduled, job estimates.
  • Experience the knowledge in dismantling, assembling and overhauling of Control Valves.
  • Installation of orifice plates, gas kits for control valves as per standard and specifications.
  • Coordination facilitator between the teams of Execution & QA/QC.
  • Complete all arrangements on site before job execution to keep project on track.
  • Supervised the calibration, installation of field instruments and hot loop test, leak test and stork test.
  • Installation & Inspection of Thermocouples, LTs, Cable glanding and termination on both ends (field and JBsides).
  • Coordinate between Mechanical and Piping departments to installation of control valves as per drawing and standers.
  • Verify additional work from client and keep in record for invoice.

Final Year Student - National Radio Telecommunication Corporation (NRTC), Pakistan - Pakistan

(2018-08 - 2019-05)

Final Year Project “Anti UAV Defense System” was completed with the collaboration of National Radio Telecommunication Corporation (NRTC). The aim of the project was to develop a prototype of anti-UAV Defense system using USRP and Lab view. UAV uses RF signals to communicate with the controller. In order to interrupt the communication between the drone and controller, we transmit a RF signal with same frequency but with greater strength for effective jamming.

  • Performed engineering tasks using computer-assisted methods and design simulation.
  • Created project budget, grand chart and flow chart.
  • Performed detailed experiments to ensure that project completed within specific guidelines.
  • Completed Project Reports and Thesis as per HEC criteria.

Trainee Engineer - Peshawar Electric Supply Company, Pakistan - Pakistan

(2018-06 - 2018-07)

Trouble shooting and maintenance of 132KV grid station under the overall supervision of SuperintendingEngineer Circle PESCO Peshawar.

Internee - Pakistan Telecommunication Company Ltd, Peshawar, Pakistan - Peshawar, Pakistan

(2018-05 - 2018-06)

The Learning experience in this internship was about Switches and Data Networks, SDH, DRS troubleshooting and maintenance. Working structure of ISP and network topology.

Education

BS - Electrical Engineering - FAST-National University of Computer & Emerging Science (2015 - 2019)

Masters - Project Management - SZABIST- Shaheed Zulfikar Ali Bhutto Institute of Science and Technology (2024 - 2025)

Skills

Planning Engineer

Reviews

Related