DAE Civil - Quantity Surveyor, Civil Site Supervisor, Sub Engineer, Surveyor
Send a job offer directly to this candidate
Seeking a position as a DAE (Civil Site Supervisor, Sub Engineer, Surveyor, Quantity Surveyor) within a progressive organization which provides a sound learning environment where I can contribute through my professional skills for the continuous improvement and betterment of the organization.
Quantity Surveyor - Shaheen Foundation (Pakistan Air Force) - E-9 Base Islamabad
(2024-06)
Worked with Shaheen Foundation head office as a Quantity Surveyor / Site Supervisor at Construction of Fazaia Education System School (FESS) Block 'D' E-9 Islamabad having Complete Finished building including flooring, ceiling works, electrical fittings, windows, doors, tiling and paint works excluding Fire Fighting System, Air Conditioner, fans, CCTV, External Work Septic tank, Over head water tank, Fire fighting tank. With 3 Storey Light Gauge Steel structure Building including beams and Columns covering 26,791 Sq.ft total cost 213,411,832 PKR. Also worked at Head office of Shaheen housing society Peshawar, Shaheen Plaza, FESS School Peshawar etc.
Civil Site Supervisor - Maypole (LimeLight Factory) - Lahore
(2023-07 - 2024-06)
Worked with limelight Factory as a Civil Site Supervisor at Construction of limelight factory Gajjumata Lahore. Having Coal shed, boiler shed, garage shed, Electrical room shed, printing mill, Rigid road, RCC Drains, Boundary Wall, Water Supply arrangement. Head office Building Roof Treatment, Residence Building named as 129A Building with 5 Storey frame structure Building including beams and Column covering 1,633,500 Sq.ft.
Sub Engineer - UCET (University of Sargodha) - Sargodha
(2022-10 - 2023-07)
Worked with Govt, University of Sargodha (UOS) as a Sub Engineer at Construction of University College of Engineering and Technology (UCET) Sargodha. Having Civil Block, Mechanical Block, Electrical Block, Admin Block, Library, mosque, Boys Hostel, Girls Hostel, Boundary Wall, Asphalt Road 2 km External or Internal, External Water Supply arrangement. Package Cost is 1095 Million Rupees Phase II with 8 Numbers of Buildings frame structure including beams and Column covering 2,178,000 sq.ft.
Site Supervisor / Surveyor - ZK & Associates - Multiple locations
(2018-09 - 2022-10)
Worked on multiple construction projects including retaining/breast walls at Azad Pattan Road Rawalakot AJ&K, 200 Beds General Hospital Buildings at Rawalakot AJ&K, Sudhan Education Complex Building, and Women Hostel Building at Islamabad.
DAE - Civil - Government College of Technology, Sargodha (2018)
SSC - Science - Comprehensive Model High School, Sargodha (2015)