Skip to main content
Saeed Engineer

Saeed Engineer

Power Plant / Electrical Engineer

Talent
NooriabadMember since August 3, 2026
Power Plant OperationsGenerator SynchronizationTransformers & MCCsPreventive MaintenanceInstallation & CommissioningWAPDA/K-Electric Supplies
·

Hire this person

Send a job offer directly to this candidate

Power Plant OperationsGenerator SynchronizationTransformers & MCCsPreventive MaintenanceInstallation & Commissioning

About

Power generation and electrical engineering professional with extensive hands-on experience in power plant operations, maintenance, troubleshooting, installation, commissioning and synchronization. Experienced with Caterpillar, Jenbacher, MTU, Waukesha and other generator systems, solar, WAPDA/K-Electric supplies, MV/LV panels, transformers, MCCs, VFDs, PLC/control systems, SCADA and DEIF synchronization systems.

Experience

Power House Incharge at Al Rahim Textile – Power House (Present)

  • Managed power-house operations and maintenance; worked with CAT 3520H (2.5 MW), 2 × MTU 16V 4000 (2 MW), JGS-420 (1.5 MW), JGS-320 (1 MW) and 7.5 MW wind turbine technology.
  • Installation/commissioning, preventive maintenance of MV/LV panels, generator synchronization, SCADA, PLC, gearbox, generator and power distribution activities.

Assistant Electrical Engineer at Fazal Group – Ahmed Fine Textile Mills Power House

  • Worked with CAT 3512, CAT 3412, JGS-320, 3 × JGS-420 and 5 × JMS 616 systems; 5 MW solar and 14 MW WAPDA supply.
  • Worked with DEIF AGC-150/AGC-200; MV/LV panels, transformers, step-up/step-down systems and power distribution; total synchronized load stated as 39.5 MW.

Assistant Plant Manager at Al Karam Towel Industries – Spinning #02, Nooriabad (2025-04-30)

  • Worked with CAT 3512H, MWM-CG-170, CAT 3516A and MTU 12V4000 L64; complete electrical/mechanical genset erection.
  • Managed 6 MW generation, 6.9 MW WAPDA, 2.5 MW solar and DEIF AGC-150 synchronization; total synchronized load 13.5 MW. Tenure through 30 Apr 2025.

Plant Incharge at Al Karam Towel Industries – Spinning #01, Nooriabad (2019-02-10 – 2021-10-24)

  • Worked with 2 × Waukesha 5904, JGS-420 and 2 × CAT 3512H; complete electrical/mechanical erection; total load 6.3 MW.

Assistant Plant Engineer – Electrical at Al Karam Towel Industries – D-11, Karachi (2017-07-14 – 2019-02-10)

  • Worked with 2 × JGS-420, JGS-320, 1 MW Cummins diesel engine and K-Electric; total load 6.8 MW.

Shift Engineer at Fazal Rehman Fabrics – Multan (2009-07-01 – 2017-07-12)

  • Worked with JGS-320, 3 × JGS-420, Waukesha, standby CAT 3512/CAT 3412 and JMS 616 (2.5 MW); WAPDA synchronized system; total load 8.4 MW.

Shift Incharge at Standard Textile Mills – Depalpur, Okara (2008-07-06 – 2009-07-01)

  • Operated CAT 3516A and JGS-320 systems.

Trainee Operator at Resham Textile Mills – Chunnian Road, Habib Abad (2007-09-26 – 2008-07-06)

  • Worked with 3 × JGS-420 generator systems.

Education

D.A.E. in Electrical – Punjab Board of Technical Education (PBTE), Lahore (2007)

Matriculation in Science – Board of Intermediate & Secondary Education (BISE), Multan

Skills

Power Plant / Electrical Engineer