Executive Officer (Utility Operation & Maintenance) at Feroze 1888 Mills Ltd (2019-10 – Present)
Utility Plant Engineering-HVAC, Chillers, & Air Compressor System
- Manage operation and optimization of HVAC system including Absorption Chillers, Centrifugal Chillers, Screw Chillers, AHUs and associated utilities such as Pumps, Cooling tower, and Plate Heat Exchangers
- Operate and enhance performance of Compressed Air networks with Atlas Copco ZH-560 HT Oil free Air centrifugal compressor and other air compressor systems
- Manage operation and optimization of Luwa Digi5 Humidification Plant, and Temsan Humidification Plant
- Drive energy efficiency and performance improvement project across HVAC and Compressed Air system
- Conduct technical documentation, data-driven analysis, and system optimization to maximize reliability and operational excellence
- Planning for Preventive Services
- Look After Operation and Maintenance
- Maintenance work of Compressor's, Heat Exchanger & Auxiliaries
- 100% compliance to maintain all ISO related documents on daily basis
- Zero tolerance for production stoppage due to ineffective Preventive Maintenance schedule implementation
- Maintain 90% score in 5s audit
- Respond to emergency situations in order to resolve issues on an immediate basis
- Perform general and preventative maintenance on HVAC system
- Order any supplies or equipment needed for HVAC maintenance or install as needed
- Ensure availability of all items needed for project
- Replace faulty or expired parts in an Utility system
Shift In-charge, Engineering Department (HVAC) at Pearl Continental Hotel
Shift In-charge responsibilities in HVAC Engineering Department