
Tariq Jamal
Project & Construction Management Professional | Specializing in Healthcare Construction
Hire this person
Send a job offer directly to this candidate
About
Results-driven Senior Project & Construction Management professional with 35+ years of experience delivering multimillion-dollar civil engineering and healthcare infrastructure projects across Pakistan, Qatar, and the UAE. Holder of PMP®, CHC, CPHQ, and Primavera P6 certifications, with a distinguished track record managing over 1 million sq. ft. of healthcare facilities and large-scale infrastructure developments. Recognized for strategic planning, rigorous cost and risk management, stakeholder engagement, and an unwavering commitment to quality, safety, and on-time, on-budget delivery.
Experience
Associate General Manager – Projects at Shifa International Hospitals Ltd. (SIHL) (2015-11 – Present)
Key Projects (Healthcare Construction)
- Secondary Care 100-bed Hospital (2B+G+6F), Islamabad — 275,000 sq. ft.
- Multi-Specialty Tertiary Care 400-bed Hospital (LG+G+7F), Faisalabad — 459,000 sq. ft.
- Surgical & ENT OPD, ICU, CCU, IPD Areas — 41,900 sq. ft. | IV&F Centre & L&D Area — 16,000 sq. ft.
- OT & Oncology Wards — 8,110 sq. ft. | Emergency Upgradation — 8,500 sq. ft. | Radiology Expansion — 25,000 sq. ft.
- Shifa College of Medicine – Two-floor addition & 5-floor renovation — 52,900 sq. ft.
- Directed end-to-end strategic planning and execution of 1M+ sq. ft. of healthcare facilities, integrating Civil, MEP, and HVAC technologies.
- Championed rigorous project control mechanisms — schedule tracking, cost reporting, and variance analysis — enabling informed executive decision-making.
- Supervised competitive bid processes, evaluating contractor capabilities and ensuring value-for-money selection aligned with quality benchmarks.
- Managed Interim Payment Certificates (IPCs), invoices, and financial controls across full project lifecycles.
- Delivered monthly progress reports and conducted stakeholder reviews with Executive Management, maintaining high transparency and accountability.
- Ensured strict adherence to construction standards, safety regulations, FGI guidelines, and infection-control protocols for healthcare environments.
- Implemented advanced project monitoring tools, reducing completion timelines and optimizing costs without compromising quality.
Manager – Civil Works at Fauji Fresh n Freeze Ltd. (FFF) (2013-12 – 2015-10)
Key Project: Fruits & Vegetables Processing Plant (76 Acres, 3.31M sq. ft.) — Buildings, Infrastructure, Roads, Drainage, Water Supply, STP, Horticulture
- Authored comprehensive project initiation documentation covering scope, objectives, milestones, deliverables, and budget estimates.
- Directed construction of main plant buildings, office, utility, services, residential, and agricultural structures.
- Managed all infrastructure services: roads, drainage, water supply, sewerage (domestic & industrial), and sewage treatment plant.
- Executed detailed cost estimations and resource planning, maximizing efficiency in materials and manpower deployment.
- Successfully delivered the large-scale project on schedule and within budget, achieving high client satisfaction.
Manager – Projects at Al Aqili Furnishings (2012-01 – 2013-10)
Key Projects
- Nikki Beach Resort (QAR 26M)
- Luxury Villas
- Francisco Molan Showroom
- Qatar National Bank Renovation
- Led multidisciplinary project teams, fostering a high-performance culture focused on quality, safety, and deadline adherence.
- Maintained stringent budget controls, allocating resources efficiently without compromising quality or timelines.
- Designed and implemented KPIs to track project improvements and enhance team accountability.
- Navigated complex project challenges through innovative problem-solving, maintaining all projects within planned budgets and timelines.
Project Manager at Bin Ham Group (2010-05 – 2011-12)
Key Projects
- Pumping Station Relocation & Force Main Upgrade — AED 73M
- Rehabilitation of Old Water Networks, Al Ain Region — AED 106M
- Oversaw planning and execution of large-scale water infrastructure projects, ensuring on-time, on-budget delivery.
- Conducted detailed risk assessments and implemented mitigation strategies to proactively address potential delays.
- Coordinated engineers, contractors, and stakeholders, maintaining efficiency and strict compliance with plans and local regulations.
- Implemented continuous improvement practices, enhancing project outcomes and operational efficiencies.
Contracts & Planning Manager at Pearl NLC (2008-02 – 2010-04)
Key Projects (Portfolio Value: QAR 697M+):
- Barwa City Enabling Works (QAR 321M)
- Lusail Development Earthworks (QAR 106M)
- 10 Kindergarten Schools (QAR 167M)
- Qatar Entertainment City (QAR 27M)
- Pumping Station Excavation (QAR 16M)
- Barwa Peripheral Roads (QAR 19M)
- Developed comprehensive project plans and schedules using Primavera P6, aligning all projects with agreed timelines and milestones.
- Performed critical path analyses to identify potential delays and formulated effective mitigation strategies.
- Directed competitive bidding processes, evaluated quotations, and led commercial negotiations with contractors and suppliers.
- Championed high-stakes contract negotiations that markedly improved project profitability and reduced overall costs.
Deputy Director – Monitoring & Evaluation at Earthquake Reconstruction & Rehabilitation Authority (ERRA) (2006-01 – 2007-08)
Key Projects
- M&E of all reconstruction in Mansehra & Muzaffarabad Districts
- 4,000 Transitional Housing Units — Balakot, Muzaffarabad & Bagh | Town Planning of Bagh City
- Directed comprehensive M&E of all reconstruction activities across two districts, ensuring alignment with national standards and international best practices.
- Spearheaded town planning of Bagh City, incorporating disaster-resistant design for long-term community resilience.
- Developed systematic data collection, analysis, and reporting frameworks, enhancing transparency and accountability.
- Successfully delivered 4,000 transitional homes ahead of schedule, providing displaced families with safe and durable shelter.
- Established a benchmark in M&E practices within ERRA, recognized across the organization.
Capt. / Maj - Military Service at Pakistan Army (1984-12 – 2007-12)
- Led planning, execution, and monitoring of diverse civil construction projects — housing, office blocks, community buildings, roads, and infrastructure — across multiple cities in Pakistan.
- Served as Head of Civil Division at MEPCO, directing all construction and infrastructure works within MEPCO jurisdiction.
- Built foundational expertise in project management, engineering execution, and field leadership during 16 years of distinguished military service.
Education
MSc in Engineering Management – University of Engineering & Technology Taxila, Pakistan (2004 – 2007)
BE in Civil Engineering – Military College of Engineering, Risalpur (NUST), Pakistan (1986 – 1989)

