- ZKB (pvt) Ltd
Joined ZKB from Jun’22 onwards as " Planning Manager” for the miscellaneous working on Road, Buildings, Dams, Bid Schedule from RFPs in Head Office etc:
My responsibilities are as follows:
- Prepare the Baseline Schedule for Water Supply Projects
- Prepare the Baseline Schedule for Road and Dam Projects
- Look in Technical/ Contractual Matters
- Follow up the matters discussed during the coordination meetings and take actions accordingly
- Other Misc office works, presentation, Dash board Report using Power Point, Power BI, Excel
- Working on Extension of Time (EOT) based on Baseline Program and Project actual status
- Zeeruk International (pvt) Ltd
A. Worked with Zeeruk International from Mar12~30Jun’22 as
" Resident Engineer\Senior Planning Engineer” for the miscellaneous working on Road, Buildings, Dams, Bid Schedule from RFPs etc:
My responsibilities are as follows:
- Coordination with all stake holders on construction matter/ issues
- Analyze/approve progress, monthly report format
- Tracking VO, contractual issues, CPI, SPI Analysis for Project
- Follow up the matters discussed during the coordination meetings and take actions accordingly
- Other Misc office works, presentation, Dash board Report using Power Point, Power BI, Excel
- Developing/ updating baseline schedule
- Preparation of Extension of Time (EOT) based on Baseline Program and Project actual status
- Equipment Report Scheulde for Rawalpindi Ring Road Project at Design Stage
B. Karachi Lahore Motorway (KLM) 230 KM, 148 Bln Pak Rupees a JV of ZKB and CR20G Chinese Co
Developed Monitored detailed Baseline Schedule (P6 ver 17.7) 3000 activities, 8 portions, a resource base fully loaded schedule.
C. Multi Story Buildings: Worked as R.E from start of the Project at Mixed Used Building, 8 Story Building, EOBI Client at LHR and 5 story bulding at Lahore, LRRA office at Ring Road LHR
Developed Monitored detailed Baseline Schedule, Analyze/approve progress, monthly report format
Generally prepare all type for schedule for Building, Presentation etc
- Guarantee Engineers
Worked GE from Nov’10~Mar’12 as
"DPM\ Planning Engineer" at FFC Head Office Building (2 Basements+ground+11 Stories) Project-Rawalpindi. My responsibilities are as follows:
- Updating the Baseline with the actual site progress
- Preparing the weekly program
- Updating maintaining daily progress reports through worksheet & graphs.
- Others site and office activities like meeting with client, procurement follow up etc
- Bin Jarallah Group – Saudi Arabia
A. Worked at Head Office (Road Section) from Oct’04 to Oct’10 as
"Planning Engineer/ Office Engineer" controlling: