Project Manager - MASPRO Energy, Pakistan - Pakistan
(2024-04)
Area of responsibilities included
- Successfully Implemented solar power to power a local business.
- Utilized computer aided design software to create solar panel installation plans.
- Develop a cost-effective solar energy solution to meet the needs of a high-end residential customer.
- Inspected and tested solar installations to ensure they met safety and efficiency standards.
- Analyzed solar energy system performance data to identify area of improvements.
- Taking Care of the whole project from the scratch till completion.
- Worked as a project Coordinator in various projects like NBC Pepsi 2 Megawatt.
- Etihad Club Rahim yaw khan 500 Kilowatt.
- Lahore Falleti's hotel 756 Kilowatt.
- Carrefour fortress Lahore 1 Megawatt. (Operation and Maintenance)
- Many residential solar on grid and off grid systems.
- 2MW NBC (PEPSI) Gujranwala at PEB Shed, using Huawei 330KTL, HT termination.
- Sayyed Engineers 2MW Projects using Huawei 115KTL & Solis 110KW.
- 5.2MW at Allawasaya Textile Mills Multan using Huawei 115KTL.
- 6.5MW at Moiz Textile Mills Raiwind, Using Huawei 125KTL.
- 1MW at Mehmooda Maqbool Oil Mills Multan, Using Huawei 115KTL & 50KTL.
- 2.2MW at Maqbool Textile Mills Toba Tek Singh.
Senior Electrical Engineer operations/Testing/commissioning/PV/HV - NEPCON, Pakistan - Sukkar, Salehpat, Pakistan
(2023-04 - 2024-04)
Area of responsibilities included: At Scatec Solar Plant 150MWp as a Senior Electrical Engineer
- Lead the testing and commissioning of photovoltaic (PV) systems including LV, MV, and HV terminations ensuring compliance with industry standards
- Conduct grid connection and synchronization for a 150MWp solar plant, coordinating with utility companies and regulatory bodies.
- Develop and implement operation and maintenance procedures to enhance plant performance and reliability
- Perform detailed electrical inspections and diagnostic testing to troubleshoot and resolve technical issues during commissioning phases.
- Testing Equipment used details are CPC 100 &CP TD1 (OMICRON)
- Seaward Solar Utility Pro
- CT Analyzer (OMICRON)
- Magnus step-up transformer (BT-12390 Megger)
- Earth Resistance Tester (4105 AH)
- 10 KV Insulation Resistance tester (MIT 1020/2 Megger)
- Oil Test Set (OTS80AF/2)
- Injection System (INGVAR BH72490)
- Contact resistance test set (RMO 600A DV Power)
- Three Phase Transformer Turn Ratio Tester (TRT 03A DV Power) Primary Current
- capacitance and Power factor tester (CB 100)
- Winding Ohm Meter and Tap Changer Analyzer (RMO 60 T IBEKO Power) Low voltage
- Collaborate with multidisciplinary teams to optimize electrical system designs and improve overall project execution efficiency.
- Ensure adherence to safety protocols and regulatory requirements during high voltage (HV) operations and commissioning activities.
- Supervised installation and integration of electrical components for PV, LV, MV, and HV systems ensuring operational readiness and compliance with standards.
- Conducted rigorous performance testing and fault analysis on electrical systems to enhance reliability and troubleshoot potential issues before final commissioning.
Site Manager Punjab (South) - ZONERGY Solar Development Pakistan Limited - Lahore, Punjab, Pakistan
(2021-11 - 2023-04)
Area of responsibilities included
- Oversee daily site operations ensuring adherence to safety, quality, and schedule requirements for solar power projects up to 5MWp.
- Coordinate with multidisciplinary teams including engineers, contractors, and suppliers to optimize project execution and resolve on-site issues promptly.
- Implement and enforce health and safety protocols, reducing site incidents and promoting a culture of safety awareness.
- Manage resource allocation and logistics on-site to maximize productivity while minimizing costs and delays.
- Monitor and report on project milestones, budgets, and risks, utilizing project management tools to maintain control over project delivery.
- Installation and commissioning of QASPL 0.4MWp Mini-Grids Solar Power project (Off Grid) with distribution and transmission line.
- DOPP 1.2MWp On-grid projects commissioner complexes Punjab
- CSR 0.57MWp project in Hospitals (Nishter, Victoria) and colleges of Punjab.
- Design and Installation of PMU 1.72MWp project, 523 primary schools in Mianwali.
- Installation of 1MWp green field project Rab-Nawaz Oil Refinery Multan, HV termination.
Assistant Project Manager - Solar Tech Private Limited
(2018-12 - 2021-10)
- 1MWp UET Lahore, 0.32MWp Khalid bin Waleed Park Peshawar, 0.435MWp
- Mental Hospital Lahore, 0.11MWp Solar Lightning Solution at Allama Iqbal
- International Airport, are some projects those are completed.
- Assisted in planning and scheduling project activities to ensure timely completion of solar energy projects.
- Supported the preparation and review of project documentation, including design specifications and progress reports.
- Contributed to risk management by identifying potential technical and operational issues and proposing mitigation strategies.
- Facilitated procurement and logistics management to ensure the availability of required materials and equipment on site.