Mechanical/ Piping Supervisor
Send a job offer directly to this candidate
To comply with the client’s requirements for the construction of the process industries by thoroughly utilization of my professional experience for the health and safety practices for the mutual growth and advancement.
(Having 8 years construction works experience in Pakistan for the Oil refineries, Power Plants, Petrochemical, Oil and Gas plants)
201-2011
1.Review of test package per content of test package.
2.Punch listing of test package.
3.Verification of a items cleared & line checking.
4.Release of test package for hydro testing.
5.Hydro testing preparation of test packages.
6.Filling & pressurization.
7.Hydro testing / leak testing of valve body and seat.
8.Installation of shop fabricated pipes on pipe racks.
9.Fit-up of pipes on pipe racks.
10.Installation of supports on racks.
11.Preparation of ambient & dry lay-up systems.
12.Preparation of PZV Calibration
IKan Engineering & Construction Co.
2014-2015
1.Review of test package per content of test package.
2.Punch listing of test package.
3.Verification of a items cleared & line checking.
4.Release of test package for hydro testing.
5.Hydro testing preparation of test packages.
6.Filling & pressurization.
7.Hydro testing / leak testing of valve body and seat.
8.Installation of shop fabricated pipes on pipe racks.
9.Fit-up of pipes on pipe racks.
10.Installation of supports on racks.
11.Preparation of ambient & dry lay-up systems.
12.Preparation of PZV Calibration
Descon Engineering & Construction Co.
2015-2017
1.Review of test package per content of test package.
2.Punch listing of test package.
3.Verification of a items cleared & line checking.
4.Release of test package for hydro testing.
5.Hydro testing preparation of test packages.
6.Filling & pressurization.
7.Hydro testing / leak testing of valve body and seat.
8.Installation of shop fabricated pipes on pipe racks.
9.Fit-up of pipes on pipe racks.
10.Installation of supports on racks.
11.Preparation of ambient & dry lay-up systems.
12.Preparation of PZV Calibration
Century Paper and Board Mills Pvt Ltd.
2017-present
1.Review of test package per content of test package.
2.Punch listing of test package.
3.Verification of a items cleared & line checking.
4.Release of test package for hydro testing.
5.Hydro testing preparation of test packages.
6.Filling & pressurization.
7.Hydro testing / leak testing of valve body and seat.
8.Installation of shop fabricated pipes on pipe racks.
9.Fit-up of pipes on pipe racks.
10.Installation of supports on racks.
11.Preparation of ambient & dry lay-up systems.
12.Preparation of PZV Calibration
DAE MECHANICAL 2011-14
Govt. College Of Technology Sahiwal
SSC(Science Group) 2009-11
Govt.Higher Secondary School Harappa Sahiwal