تخطي إلى المحتوى الرئيسي
Alaa Khalifa

Alaa Khalifa

Project Manager / Technical Manager

كفاءة
Dohaعضو منذ ٢٧ أكتوبر ٢٠٢٦
Interior DesignSite SupervisionAutoCAD
·

وظّف هذا الشخص

أرسل عرض عمل مباشرة لهذا المرشح

Interior DesignSite SupervisionAutoCAD

نبذة

Briefly my objectives concentrate on relocating & having a fair opportunity in an overseas or local firm where I can excel in its field that will provide me with ample growth, developing, building on & contributing my experience, as well as, to compact my future vision of growth, there has to be a clear need to change to be able to inspire my creativity & to make use of my direct experience.

الخبرة

Project Manager at The Arab Architects. Consultant and Management Co.– Qatar (2014-11 – 2025)

  • Lusail Palace H.H Tameem Palace (Royal Family) (November 2020 — Present). Client: Private Engineering Office (PEO). Site Locations: Lusail. Project’s Amount:475 Million QR. Project Description: VIP and V.VIP Palace + ancillary Buildings + Huge Gates.
  • Al Rayyan Palace (Royal Family Palace) (November 2014 — 2017). Client:Private Engineering Office (PEO). Site Locations:Al Rayyan. Project’s Amount:475 Million QR. Project Description:VIP and V.VIP Palace + ancillary Buildings + Huge Gates.
  • Dr. Issa Al Kawari Private Villa (The Pear Areal) (November 2014 — 2020). Client: Dr. Issa Al Kawari. Site Locations: The Pearl - Qatar. Project’s Amount: 115 Million QR. Project Description: V.VIP Private Villa.
  • Fully coordinated with the client to match with his requirements.
  • Full Coordination between the Design Office and Site Technical Team.
  • Involved in the planning, design and construction of buildings.
  • Reviewing all shop drawings and materials + Site Inspections.
  • Compiling data for architectural plans, specifications, cost estimates reports.
  • Preparing preliminary sketches.
  • Writing Reports, Site Visits and small-scale Project Management.
  • Developing & sustaining working relationships with private & public sector partners.
  • Visiting sites and building relationships with site managers.
  • Liaising with sub-contractors to ensure compliance with order documentation.
  • Taking Full Charge for the Private Villa.

Project Manager at Construction Excellence National Valu Engineering (CENVE). Project Management Company– Qatar (2014-04 – 2014-11)

  • JW Marriott WestBay (April 2014 — November 2014). Client:BTC. Site Locations:West Bay. Project’s Amount:… Million QR. Project Description:Five star hotel comprising 3 basement levels, a ground floor, a parking level, a mezzanine floor and 51 additional floors.

Senior Architect at Construction Excellence National Valu Engineering (CENVE). Project Management Company– Qatar (2014-04 – 2014-11)

  • Four Private Villas at Al Gharafa Area (April 2014 — Present). Client: Sheikh Naser Bin Abdullah Al Thani Sons. Site Locations: Al Gharafa Area. Project’s Amount: Under Design Stages. Project Description: Design and Management of Construction work for Four Private Villas at Al Gharafa Area.
  • Fully coordinated with the clients to match his design requirements.
  • Involved in the design and construction of buildings.
  • Compiling data for architectural plans, specifications and tender documents.
  • Preparing layouts, detailed drawings and preliminary sketches.
  • Writing Reports, Site Visits and small-scale Project Management.
  • Visiting sites and building relationships with site managers.
  • Liaising with sub-contractors to ensure compliance with order documentation.

Senior Architect at Engineering Consultants GroupS.A – Qatar. (2011-11 – 2014-02)

  • Six Schools at Different Sites in State of Qatar (Dec. 2013 — Feb. 2014). Client:Public Works Authority ‘Ashghal’ (PWA). Site Locations:Al Selaiyah, Al Shamal. Project’s Amount:56 Million QR. Project Description:Build new Six Schools for boys and Girls in different places of Qatar under PWA manage.
  • Heritage Buildings at Different Sites in State of Qatar (Jan. 2013 — Dec. 2013). Client:Private Engineering Office (PEO). Site Locations: Umm Selal Mohamed, Al Khor & Al Dhakhira and Ras Usharage. Project’s Amount:347.5 Million QR. Project Description: Restoration for all Heritage Buildings and Demolishing for the new buildings, Clean and maintain the wells and how to use the latest technology service with the Heritage and protected area to reach client satisfaction
  • Awqaf Residential Four Buildings (Nov. 2012 — Jan. 2013). Client: Ministry of Awqaf and Islamic Qatar. Site Locations:Bin Mahmud Area. Project’s Amount:54 Million QR. Project Description:Project consists of four Residential Buildings of seven floors and two floors for Car parking for each with two clubs, one for men and the other for women. The project worth QR54million will be executed over a period of 20 months.
  • Package 9- Four Mosques (Nov. 2011 — Dec. 2012). Package 11 - Three Mosques (Nov. 2011 — Dec. 2012). Client: Public Works Authority (PWA). Site Locations:Industrial Area, Al Wakrah, Rawdet Rashed, Jaryan Al Buttna, Um Thumam and Um Uwaynah. Project’s Amount:22 Million QR. Project Description:Projects consists of Seven Mosques, Imam Houses, Ablution area, Toilets and Car Parking Area, two of them is Friday Mosques and the project period were 16 months.
  • Involved in the planning, design and construction of buildings.
  • Compiling data for architectural plans, specifications, cost estimates reports.
  • Preparing layouts, drawings and preliminary sketches.
  • Providing clear and unambiguous direction to members of the project team.
  • Writing Reports, Site Visits and small-scale Project Management.
  • Preparing sub-contractor order documentation.
  • Developing & sustaining working relationships with private & public sector partners.
  • Visiting sites and building relationships with site managers.
  • Liaising with sub-contractors to ensure compliance with order documentation.
  • Advising on planning applications.

Technical Manager at Redco Construction Al Mana– Qatar. (2010-06 – 2011-10)

  • The Business Park “Crown Plaza Hotel” (July 2011 — Oct. 2011). Client: Sh. Mohamed Bin Hamad Al Thani. Site Locations:Airport Road. Project’s Amount:680 Million Q.R. Project Description:Business Park and Hotel Facilities is a construction of three storey’s Basement Parking, 5 Nos. of office building, a Showroom Building, Conference Building and a 8 storey Hotel building. The construction includes Interior designing and installation of Furniture Fixture and Equipments.

Senior Architect at Redco Construction Al Mana– Qatar. (2010-06 – 2011-10)

  • Silhouette Tower“Intercontinental Hotel” (June 2010 — July 2011). Client: H.E. Mohammed Ajjaj Al-Kubaisi. Site Locations:West Bay – Al Dafna. Project’s Amount:522 MillionQ.R. Project Description: The project involves construction of a 208 meter high tower comprising 2 basement parking area, a ground floor and 59 additional floors, amenities in the development will include a business centre.
  • Ability to balance, co-ordinate and translate the needs of multiple stakeholders.
  • Interior Design Co-ordinations.
  • Tenacious attention to detail and quality.
  • Can work on schemes within a variety of sectors.
  • Possess a thorough knowledge of building regulations.
  • Able to lead a project with multiple technical resources involved.
  • Good knowledge in the use of AutoCAD for the preparation of feasibility plans, sketch designs and planning application drawings.

Architect Coordinator at Arabian Construction Company – UAE. (2005-05 – 2010-06)

  • Shams Abu Dhabi “Sky and Sun Towers” (January 2008 — June 2010). Client: SOROUH. Site Locations:Al Reem Island - Abu Dhabi. Project’s Amount:2.6 Billion AED. Project Description: Projects consists of Sun & Sky Towers form part of Shams Abu Dhabi, The 74-storey Sky Tower consists of a mix of residential and commercial units, while the 65-storey Sun Tower is entirely residential, Sun & Sky Towers are joined bythe Podium, The open air leisure deck above the Podium offers three swimming pools, a Jacuzzi, tennis courts, a yoga lawn and children’s playing areas.
  • The PARK PLACE Tower (November2006 — January 2008). Client: ASCOTT. Site Locations:Shikh Zayed Road - Dubai. Project’s Amount:450Million AED. Project Description: Projects consists of 56-floor mixed use tower on Sheikh Zayed Road in Dubai (Residential Apartment and Commercial Floors). The tower has a total structural height of 234.1 m (768 ft), making it currently the 10th tallest building in Dubai.
  • IBN BATTUTA GATE COMPLEX (August 2006 — November 2006). Client: Seven Tides & Asteco. Site Locations:Jebel Ali - Dubai. Project’s Amount:837.55Million AED. Project Description: Projects consists of 200,000 m2 Complex comprises offices, apartments and a five star Mövenpick hotel,The Arch shaped gate building connecting the two main buildings spans across a four lane road, continued maintenance traffic over this road and the proximity of the operational mall.
  • IKEA, Hypermarket, Atrium & Plug Ins (May 2005 — August 2006). Client: Dubai Festival City Real Estate Development LLC. Site Locations:Dubai Festival City - Dubai. Project’s Amount:82.4Million$. Project Description: Projects consists of 35,000 square meter store, and Hypermarket as well as the wedge shaped atriumconnecting the two shops has a big skylight fixed by steel structural system, and finally Plug Ins store.
  • Site Supervision and Co-ordination.
  • Preparing for Architectural Shop Drawings.
  • Technical Office co-ordination.
  • Providing Minuets of Meetings Reports.
  • Able to work under pressure.
  • Co-ordinate with the sub-contractor requirements.
  • Following Specifications and Government regulations.

Architect at SNAP Integrated Technology– Egypt. (2002-07 – 2005-04)

  • High Rise Building at Abbas Elakkad St.
  • Villa at Golf City (Interior Design).
  • Two Villas at Al-Mokattam heights.
  • Two Luxurious Apartments at Naser City.
  • Ebeid Construction Office (Interior Design).
  • Villa at Sheikh Zaied City.
  • Three Different Villas at the Fifth District Zone.
  • Four Luxurious Apartments.
  • High Rise Building at Feisal Street.
  • Al Ain Sokhna Tunnel (80 m length- 22 m depth from surface).
  • Dar Elharb El-Kemaweya (Chemical War’s Building) at Cairo –Suez road.
  • Smooth for concrete slabs like chess for factory belong to Ministry of Electrical at Belbees on high way road.
  • Site Supervision and Co-ordination.
  • Interior Design and Decorations.
  • Preparing Design Drawings.
  • Provide Modeling in 3D (AutoCAD).
  • Able to Furnish all Available Specious.
  • Preparing for Architectural Shop Drawings.
  • Get Client Satisfaction.
  • Able to Pricing and Calculate the Quantities.

التعليم

Bachelor Certificate in Architectural Engineering – Ain Shams University (2002)

المهارات

Project Manager / Technical Manager

التقييمات