تخطي إلى المحتوى الرئيسي
Sabbahur Rahman

Sabbahur Rahman

Manager Facade Works

كفاءة
Doha, بَلَدِيَّة اَلدَّوْحَة0عضو منذ ٢ نوفمبر ٢٠٢٢
·

وظّف هذا الشخص

أرسل عرض عمل مباشرة لهذا المرشح

نبذة

Over 22 years’ experience in Facade Works including Estimation, Fabrication & installation of Architectural metal works, Structural Glazing, Stick Curtain Wall/ Unitized Curtain Wall system, Frameless Glazing and ACP Cladding.

الخبرة

  • Over 25 years’ experience in facade works including Estimation, Fabrication & installation of Architectural metal works, Structural Glazing, Stick Curtain Wall/ Unitized Curtain Wall system, Frameless Glazing and ACP Cladding.
  • Managing multiple projects at a time. 
  • Able to handle large Façade from Conception to Completion.
  • Familiar with standard operating procedure including design, fabrication and installation of Architectural Envelop.
  • Study job specification to determine appropriate construction method.
  • Coordinate on-site activities according to project’s plan while ensuring compliance with safety regulation/laws. 
  • Strong leadership and team management skills.
  • Participate in preparation of BD submission/review process.
  • Performance test at laboratory and field test.
  • Provide technical advice to designer.
  • Review design intent and specification –implement changes
  • Identify variances, implement corrective actions and being proactive to ensure project are completed accurately maximizing efficiencies and meeting deadlines.
  • Meet expected profitability whilst maintaining customer satisfaction.
  • Strategic Management and planning to provide necessary leadership, direction, organization and control to meet the operations and profit goals of the company.
  • Proficient in computer applications like Auto Cad, MS Word, Excel and MS Project.
SYSTEM WORKED: GUTMAN, TECHNAL, SCHUCO, RAYNERS, HUECK 

EXPERIENCE DETAILS

March 2021 to Present:

Position: Lead Façade Engineer 

M/s Dar Al Handasah Consultant Doha Qatar

Project – New Doha International Airport (New Central Concourse Building)

Scope- UCW, SCW, Doors & ACP

System- Schuco Germany

Façade Value- Qr. 410 million

Project Value- Qr. 4 billion

Responsibilities

  •  Accountable for all facade works from conception to completion.
  • Review contractor submissions; System drawings, PMU/ VMU drawings MAR/SMP, shop drawings, RFIs.
  • Review and approval of Visual Mock-ups, Performance mock-ups and benchmarks.
  • Resolve the design/site related issue 
  • Coordinate with Contractor and monitor their procurement, fabrication, delivery and installation as per agreed program. 
  • Coordinate with Contractor to stablish proper sequence of work and ensure proper interface with façade element.
  • Monitor day to day site activities with all required manpower, material and equipment at construction site.
  • Monitor site daily progress, weekly progress and monthly progress based on agreed schedule.
  • Coordinate Contractor and make sure that façade works are executed at site based on approved Quality Plan.
  • Attend inspections during construction, installation and fabrication as required
  • Communicate with design team as well as work autonomously
  • Liaise with peers and other disciplines within the Group as required
  • Build and maintain relationships with clients on projects and develop contacts within the facade industry
Dec. 2018 to March 2021:

Position: Lead Façade Engineer 

M/s HBK Contracting Co. W.L.L, Doha Qatar

Project - KATARA TWIN TOWER –HOTEL PROJECT

Scope- UCW, SCW, Doors/ Windows, ACP

System- Schuco Germany

Façade Value- Qr. 464 million.

Project Value- Qr. 6.5 billion

Responsibilities

  • Review engineering submission and ensure to compliance to project specification and design requirement.
  • Engage with Subcontractor and ensure that all designs are compliant with building bulletin and other statutory regulation. 
  • Liaison with Consultant and Façade Subcontractor to resolve the design/site related issue.
  • Liaison with Consultant/Façade Subcontractor and make sure that Visual Mock-ups and Performance mock-ups are approved prior to proceed with mass production and installation.
  • Coordinate with Façade Subcontractor/ other trade to stablish proper sequence of work and ensure proper interface with façade element.
  • Coordinate with Façade Subcontractor and monitor their procurement, fabrication, delivery and installation as per agreed program. 
  • Monitor day to day site activities with all required manpower, material and equipment at construction site for Façade Subcontractor.
  • Monitor site daily progress, weekly progress and monthly progress based on agreed schedule while ensuring compliance with safety regulation/laws.
  • Coordinate with Façade Subcontractor and make sure that façade works are executed at site based on approved Quality Plan.
Jan. 2015 – Nov. 2018:

Position: Project Manager 

M/s Alu-NASA Doha, Qatar (Leading Aluminum /Glazing Company in Middle East)

Completed Project - HOD 1C Mushrieb, Doha Qatar

Scope- UCW, SCW, Doors/ Windows, ACP

 System- Hueck Germany

Project Value- Qr. 100 million.

Yacht Marina Club Building, Qatar

Scope- Bespoke Curtain Wall Glazing, Doors, ACP cladding.

Project Value- Qr. 40 million.

Responsibilities

  • Overall, in charge of projects from Conception to Completion.
  • Responsibilities includes Site Managements, Material Procurements, Design, Submittal, Approvals, Installation, Quality plan, Site meeting etc.
  • Program, Plan, Review and Report from receipt to final hand over to customer including Design, Procurement, Delivery, Installation and Commissioning aiming always to deliver the project within time and budget.
Sept. 2011 – Dec 14:

Position: Senior Project Manager 

STAR ALUBUILD PVT. LTD, Gurgaon (Delhi NCR) INDIA

Completed Projects - ASF (2013-2014) G + 25 commercial Building, Gurgaon

Scope- UCW, SCW, Cladding, Doors & Windows

Project Value- INR 500 million

DLF Magnolias Residential Complex (2012-2013) G +25Tower -19 towers. Gurgaon

Scope- Conventional Curtain Wall, Doors & Windows, Glazing & Claddings on Canopy

Project Value- INR 500 million

NSCB AIRPORT, KOLKATA (2011-2012)

Scope- Unitized Glazing, Conventional Curtain Wall, Internal Partition, Skylights, ACP Cladding.

Project Value- INR 1000 million

Responsibilities

  • Overall, in charge of projects from Conception to Completion.
  • Responsibilities includes Site Managements, Material Procurements, Design, Submittal, Approvals, Installation, Quality plan, Site meeting etc.
  • Program, Plan, Review and Report from receipt to final hand over to customer including Design, Procurement, Delivery, Installation and Commissioning aiming always to deliver the project within time and budget.
Aug.2009 – Feb.2011

Position: Project Manager 

QATAR TECHNOLOGY FOR ALUM. & STEEL CO, Doha Qatar

Completed Projects - G+14 QREIC Building- ACP Claddings

G+4 Commercial Building with M/s MSK

Al-Khore housing Complex with M/s Aljaber

Civil Defense Head Quarter (Technal System)

Responsibilities

  • Overall, in charge of projects from Conception to Completion.
  • Responsibilities includes Site Managements, Material Procurements, Design, Submittal, Approvals, Installation, Quality plan, Site meeting etc.
  • Program, Plan, Review and Report from receipt to final hand over to customer including Design, Procurement, Delivery, Installation and Commissioning aiming always to deliver the project within time and budget.
July 2007 – Feb 2009:

Position: Project Manager  E T A WINDOWS W.L.L DUBAI (Leading Alu. Glazing and Cladding Company in UAE)

Product- Curtain Wall, Conventional/Structural Glazing, Unitized, Semi Unitized, Doors and Windows, Spider Glazing, Sun Shad louver, Skylights and Patch fittings, ACP Claddings and SS claddings.

Responsibilities

  • Overall, in charge of projects from Conception to Completion.
  • Responsibilities includes Site Managements, Material Procurements, Design, Submittal, Approvals, Installation, Quality plan, Site meeting etc.
  • Program, Plan, Review and Report from receipt to final hand over to customer including Design, Procurement, Delivery, Installation and Commissioning aiming always to deliver the project within time and budget.
March 2004 – April 2007: 

Position: Project Engineer 

KARAM INDUSTRIES LLC Sharjah

Architectural metal works, Alu. Doors, Windows, Partition, Glass Balustrade, ACP Cladding, UCW, SUCW, Skylight .

Responsibility

  • To clarify and ambiguously define Customer requirement, 
  • Coordination with factory and site, 
  • Site installation.
 Nov. 1995 – Feb. 2004: 

Position: Engineer -Fabrication

ICM ENGINEERING PVT. LTD. Gurgaon (India)

Product- All type of Steel Fabrication like Storage Tank, Steel Structure, Sugar Plant Equipment, Cement, Plant Equipment, Material Handling Equipment.

Responsibilities

  • Preparation of quotation and quality documents
  • To Estimate and organize the procurement of raw material for production.
  • Shop floor and site supervision.

التعليم

Mechanical Engineering

التقييمات