Lead Electrical Engineer
اطلب عرض سعر بدون التزام
PMP® & SEC/ID: AEE006/Aramco Projects
CRCC (CHINA RAILWAY CONSTRUCTION CORP. LTD)
PROJECT: KING SALMAN ENERGY PARK (SPARK CITY)
ELECTRICAL SUBSTATIONS, INFRASTRUCTURE
PROJECTS, INSTALLATION AND TESTING
SCOPE OF WORK: Utilities are including two small lift stations with wet wells and SCADA control, as well as
Medium- and Low-voltage, Solar Street light system,
Telecom and SCADA systems.
Working Experience
14 Years record of success in propelling improvements and enhancing the productivity for directives of all electrical processfields Specifically in Power Substations and Mega infrastructure Projects.
and other materials suitable for procurement and construction purposes
, utilizing CAE/CAD as applicable.
estimates, surveys, and designs.
Designers, and lower-level Engineers working on the same project.
and low voltage power, indoor lighting, outdoor and road lighting.
for sizingmajor equipment and circuits.
Medium voltage power distribution substation one-line diagram and layout of major equipment Protective relaying schemes for medium voltage bus, transformer, cable and switchgear control,
monitoring and metering SCADA.
ELECTRICAL SUBSTATIONS, INFRASTRUCTURE
PROJECTS, INSTALLATION AND TESTING
SCOPE OF WORK: Utilities are including two small lift stations with wet wells and SCADA control, as well as
Medium- and Low-voltage, Solar Street light system,
Telecom and SCADA systems.
Working Experience
14 Years record of success in propelling improvements and enhancing the productivity for directives of all electrical processfields Specifically in Power Substations and Mega infrastructure Projects.
B.Sc. In Electrical &Power
Thesis: Designing digital relay for increasing current
Coursefor Operation &
CAD course, Control power system. (July toDecember
2009).