Operation and Maintenance ELECTRICAL Engineer at SRACO COMPANY (2024-10 – Present)
Facility Management Engineer at WADI DEGLA At EGYPRO FME (2023-08 – 2024-09)
Operation and Maintenance Engineer at Al Wady Company for Trading and Constructions (2020-04)
- 24/7 responsibility for electrical supplying network [ MV Distributer, Transformers, Generators, ATS, PF correction and UPS panels, LV switchboard, Sewage plant, Motors and Pumps control panels ]
- Handling a team of (e supervisors, 10 technicians and 5 workers) through different challenges in work
- Providing technical sessions to uplift the technicians working approach in maintenance for all electrical hospital network
- Keep up the (annually, monthly and daily) maintenance action plans to insure and increase life time for all equipment's
- Implementing corrective, preventive and predictive maintenance plans for a various hospital electrical supplying equipment
- Providing immediately solutions for any fault or equipment malfunction
Site Engineer at Al Wady Company for Trading and Constructions (2020-04)
- Installation for 3 (500 KVA generators) and 14 panels(4 ATS and 8 MDB) for 5 critical Hospitals
- Installation Pumps and control panels for two Sewage plant
Engineer at Egyption Contracting Office (2016)
- Maintenance of Sandecree Machine for Salt
- Making and Execute a Complete Mechanical Design of Double Jacket Tank (GEL) with boiler With PLC Control Panel
- Fitting Cable Tray in (MARS Egypt) Factory and Coca-Cola
- Extension Of Double Jacket Pipe from 'New Cream Preparation Area' To the Production Line(MARS EGYPT) With Connecting Of all Electrical works belongs to this project