Chandrasekharan Roy
Structural steel estimation Engineer
كفاءة
Riyadh, منطقة الرياضعضو منذ ١٢ نوفمبر ٢٠٢٢
·
وظّف هذا الشخص
أرسل عرض عمل مباشرة لهذا المرشح
نبذة
- Steel structure Estimation (Metro rail & Industrial Steel Plant, Chemical Plant, Pipe rack, Platform, Roof Structures, Roof Dome, Commercial Steel Building, Architectural steel Canopy, Solar structures & Other Steel Miscellaneous items).
- Cable Tray System Estimation (Cable Tray, Cable Ladder & Cable Trunk)
- Monopole Estimation (Lighting Pole, Camera Pole, Pole for Telecommunication etc.)
- Material Submittal for Client Approval.
- Steel material property (Chemical & Mechanical) including grade as per ASTM, BS, JIS DIN etc.
- Paint selection and its application method including special functions (Fireproof, Heat insulation, climatic withstand)
- Familiar Hot dip Galvanized as per international standards ASTMA123, ASTM A78, ASTM A153/A153M.
- Time Study in Production Area or Plant.
- Support sales and marketing by developing automated system for costing.
الخبرة
- Steel structure
- Communication Tower
- Fixed Cost & Variable Cost Analysis
- Cable Tray
- Break Even Point Analysis
- Manpower costing
- Monopole
- Time Study
- Overhead Calculation
- Estimation & Costing Head – From December 2012 – Present (10 Years)
- Estimation & Costing Engineer - June 1999 to 2012 (12 Years)
Main Achievement
- 200 million Job handled in Riyadh Metro project Line-3. (Viaduct Steel Structure, Cable Tray, Fire Fighting Support)
Roles and Responsibilities
- Materials take off by manual or by using X-steel software based on Design Drawing
- Calculate the material Wt. & Surface area of the profile as per the BOM.
- Estimate of the material Cost as per the grade including Connection Bolt, Anchor Bolt, Leftover & Scrap based on client technical documents.
- Estimate the production Man Hours / Ton, Production period & production Cost based on structure.
- Calculate the Paint Price & Paint labor cost or hot dip galvanizing cost.
- Estimate Indirect Expenses, Administrative Overhead.
- Calculate the packing & Transportation expenses.
- Provide Unit Cost.
- Put Profit Margin and Calculate Total amount based on the Qty.
- Arrange the Remarks & Exclusion list of the Project.
التعليم
QualificationInstitutionHigher SecondaryKerala University, IndiaDiploma in Mechanical Engineering (3 years) Board of Technical Education, India.