مساح - حاسب كميات وترسام GIS
أرسل عرض عمل مباشرة لهذا المرشح
أخصائي مساحة وحساب كميات ورسام GIS بخبرة تمتد لأكثر من 17 عام في المملكة العربية السعودية. أملك شهادة في إدارة المشاريع الإنشائية مع خبرة عميقة في الرفوعات المساحية وتحليل البيانات المكانية باستخدام تقنيات متطورة مثل AUTOCAD و CIVIL 3D و ARCGIS. متخصص بالدقة العالية في حساب الكميات والقدرة على تقديم استشارات هندسية تدعم اتخاذ القرار وتحسن كفاءة التنفيذ الميداني.
Oct 2024 – Dec 2025
Worked on the Engineering Supervision project for Property Expropriation (Acquisition) projects in Qatif Municipality.
SEP 2014 to OCT 2024
Engineering and Technical Supervision of Ras Tanura Municipality Projects (2014-2016) - (2019-2022)
Ras Tanura Corniche: Management of the final phase of the Cultural Center project and development of the waterfront designs, including surveying and quantity surveying.
Rahima Walkway and Recreational Parks: Supervision of the creation of public parks and pedestrian walkways to enhance the quality of urban life.
Al-Khadri Company (666): Strategic supervision of the development of a plan that includes road and infrastructure works in Al-Khobar and lighting works (Al-Aziziyah District).
Sumou Real Estate Company (Plan 1466): Technical supervision of a private plan that includes road works and infrastructure such as stormwater drainage, sewage, water network and lighting works.
Al-Shuwair Project (1478): Technical supervision of a private plan that includes road works and infrastructure such as stormwater drainage, sewage, water network and lighting works.
Jul 2013 to SEP 2014
executed surveying works for the "Improvement and Beautification of Ras Tanura Entrance" project.
Worked on the Stormwater Drainage project in Ras Tanura.
Implemented Traffic Safety means construction in Jubail and Ras Tanura governorates.
Mar 2011 – Jul 2013
Performed surveying for the construction of Security Patrol Launch Centers in Dhahran and Al-Khobar (Aziziya).
Worked on Civil Defense Buildings in Jubail and Dammam (Al-Mazrouiya district).
Surveyed for the construction of the Ras Tanura Governorate Building and Dammam Prison Building.
Executed surveying works for the construction of the Water Treatment Plant in Al-Aflaj.
Executed surveying works for the Water Treatment Plant in Al-Dawadmi.
دبلوم - مساحة (2003 - 2005)