تخطي إلى المحتوى الرئيسي
Mahmoud ELbalasy

Mahmoud ELbalasy

Senior MEP Project Manager | Mechanical Engineering Professional

كفاءة
Riyadhعضو منذ ١٤ نوفمبر ٢٠٢٦
Variation Orders (VOs)Value Engineering (VE)Testing & Commissioning
·

وظّف هذا الشخص

أرسل عرض عمل مباشرة لهذا المرشح

Variation Orders (VOs)Value Engineering (VE)Testing & Commissioning

نبذة

Results-driven and highly accomplished Senior MEP Project Manager and Mechanical Engineering Professional with over 17 years of robust experience directing large-scale electromechanical property and building developments across Saudi Arabia and Egypt. Proven expertise orchestrating multi-billion-riyal portfolios, high-rise luxury towers, mixed-use commercial centers, and specialized complexes. Exceptional leadership in steering cross-functional design and site execution teams, optimizing project delivery timelines, conducting value engineering, and securing compliance with international codes (ASHRAE, NFPA, NPC, NEC) as well as the Saudi Building Code (SBC).

الخبرة

Senior MEP Project Manager at HEYAZAH REAL ESTATE DEVELOPMENT (2021-10 – Present)

  • ParkSide Project (Mega-Scale Property & Residential Development) | Value: SAR 5.46B
  • Directed the comprehensive electromechanical lifecycle and building package execution for a landmark real estate portfolio.
  • Engineered and executed a strategic Value Engineering (VE) program across major mechanical, electrical grids, and life safety systems, significantly optimizing capital expenditures.
  • Secured technical approvals from Saudi Civil Defense and municipal authorities, ensuring 100% compliance with SBC, NFPA, and ASHRAE codes.
  • Maintained strict contract oversight over MEP subcontractors, successfully mitigating critical-path delays through detailed risk assessments.
  • Kayanat Project (Iconic Mixed-Use Regional Development) | Value: SAR 4.5B
  • Managed full electromechanical scope delivery for a premium commercial development, enforcing strict adherence to FIDIC contract conditions.
  • Evaluated, negotiated, and processed complex Variation Orders (VOs) and Extension-of-Time (EoT) claims, minimizing contractual disputes.
  • Governed electromechanical package budgets by verifying subcontractor interim payment applications and managing procurement for long-lead equipment.
  • Supervised testing, commissioning, and final handover strategies for advanced BMS, central cooling plants, and main electrical substations.
  • Skyline Building (High-Rise Landmark & Corporate Destination) | Value: SAR 950M
  • Oversaw engineering design validation and installation of a Centralized HVAC Chilled Water Plant and High-Velocity Air Distribution across a 34-floor layout with 10 basements.
  • Chaired cross-functional coordination meetings to ensure conflict-free zone fire suppression layouts (NFPA compliant) across high-density corporate floors.
  • Controlled high-volume basement drainage and plumbing systems installation, managing technical submittals and site inspections.
  • S Tower Building (Premium High-Rise Tower) | Value: SAR 580M
  • Led the execution and integration of high-efficiency VRF air conditioning systems across a 22-floor premium layout with 6 basements.
  • Validated engineering designs for high-rise water pressure management booster plants, drainage networks, and smoke extraction configurations.
  • Other Key Projects Managed:
  • Prime Square Project (SAR 460M): Managed VAV climate systems, IT infrastructure containment, FM200/NOVEC fire suppression, and BMS integration.
  • Lex Building (SAR 400M): Directed commercial HVAC configurations with intelligent zone control and high-efficiency plumbing.
  • Amd Center (SAR 380M): Orchestrated installation of industrial-grade packaged AC roof units and thermal-load management systems.
  • Sigma Commercial Building (SAR 365M): Coordinated advanced VRF/ducted split integration fully compliant with Saudi Civil Defense regulations.
  • Business Yard Project (SAR 350M): Managed high-efficiency VRF layouts, building drainage networks, and synchronized fire alarm systems.
  • THE GATE (SAR 250M): Supervised procurement and installation of pumping infrastructure, power distribution, and vertical transportation.

Executive Director – Electromechanical Department at AHMED ALSAIF CO. (2018-01 – 2021-09)

  • THE ROOF Building (High-End Mixed-Use Development) | Value: SAR 125M
  • Directed the comprehensive electromechanical planning and execution strategy for a landmark commercial and entertainment property.
  • Oversaw engineering configuration of centralized climate control systems, high-capacity drainage, main switchgears, and power distribution.
  • Managed contract compliance, processed engineering VOs, and secured strict adherence to Saudi Building Code (SBC) standards.
  • Tkamul Building (Premium Commercial Complex) | Value: SAR 96M
  • Exercised full executive oversight over MEP design validation, value engineering, and high-precision shop drawing production.
  • Spearheaded strategic commercial procurement for central HVAC packaging and integrated Civil Defense-compliant firefighting infrastructure.
  • Other Key Projects Managed:
  • Alwaha Gate Building (SAR 90M): Led HVAC/VRF deployment and basement smoke extraction configurations for rapid Civil Defense approvals.
  • Alwaha Waves Building (SAR 83M): Orchestrated design validation, procurement, and site integration of complete MEP systems while optimizing via VE.
  • Ahmed bin Saleh AlSaif Project (SAR 13.8M): Managed end-to-end electromechanical lifecycle, ensuring precise budget and schedule control.
  • Hittin & Al-Taawen Luxury Villas (SAR 4.6M): Governed premium MEP fit-outs, smart-home automation readiness, and water booster plants.

Project Engineer at WATCOM FOR ELECTRO MECHANIC CONTRACTING (2015-05 – 2017-12)

  • Supervised site installation workflows for HVAC networks, central plumbing, drainage, low voltage cabling, and electrical containment systems.
  • Prepared material take-offs (MTO), technical submittals, and RFIs, bridging communication between main contractors and client consultants.
  • Key Projects Executed:
  • Yanbu Municipality Building (SAR 45M): Coordinated complete MEP installations, ducted climate systems, and medium-voltage containment.
  • Yanbu Commercial Port Tower(SAR 55M): Coordinated complete MEP installations, ducted climate systems, and medium-voltage containment.
  • Alzzahim Hotel, Makkah (SAR 42M): Directed installation of high-capacity chilled water lines, booster plants, and high-velocity air distribution.
  • Madinah Tunnel (SAR 22M): Oversaw testing of heavy-duty tunnel ventilation, jet fans, drainage pumping, and emergency backup systems.
  • Islamic University of Madinah (SAR 16M): Controlled electromechanical fit-outs and infrastructure upgrades for educational facilities.

Project Engineer at SETCO COMPANY FOR TRADING & CONTRACTING (2013-12 – 2015-03)

  • Managed on-site MEP execution, material procurement coordination, and tactical workforce allocation for governmental developments.
  • Key Projects Executed:
  • Imam Muhammad bin Saud Islamic University Institutes, Rafha (SAR 18M): Monitored ducted split units, plumbing, and fire alarm configurations.
  • Regional laboratory in Arar – Ministry of Health (SAR 55M): Supervised specialized HVAC temperature-control and cold-room refrigeration setups.

Project Engineer at EL BORACK CO. FOR ELECTRO MECHANICAL CONTRACTING (2010-11 – 2013-12)

  • Executed comprehensive MEP installations, testing, and commissioning activities across landmark commercial and hospitality developments in Cairo.
  • Key Projects Delivered:
  • Marriott Hotel, Cairo (15M EGB): Supervised hospitality-grade plumbing, centralized hot water, and high-occupancy ventilation.
  • Hassan Rateb Palace, Cairo (25M EGB): Supervising fire protection and plumbing works in accordance with hospitality sector specifications, as well as central hot water systems, air conditioning systems, and ventilation systems designed for palaces.
  • The Middle East News Agency, Cairo (14M EGB ): Coordinated data-center cooling, main power distribution boards, and clean-agent fire suppression.
  • Union of Radio and Television, Cairo (EGB 9M): Handled broadcast studio infrastructure upgrades, including acoustic-treated HVAC ducting.
  • Hospital Elrwad for Ophthalmology (EGB 4M): Enforced ultra-clean medical ventilation standards (HEPA), medical gases, and backup generators.

التعليم

Bachelor of Science in Mechanical Engineering – Al-Azhar University

المهارات

Senior MEP Project ManagerMechanical Engineering Professional

التقييمات