Process Engineer - Industrial Wastewater & RO Recycled Water at Jazirrah Environmental Co. (JECO) – Miahona Holding Co. (2017-11 – Present)
Jeddah Industrial Area-1 Wastewater Treatment Plant (MODON) - Jeddah
- Monitor and optimize industrial wastewater treatment processes.
- Supervise RO plant operations and membrane performance.
- Troubleshoot process issues and improve system efficiency.
- Analyze water quality data to ensure treatment compliance.
- Implement control strategies for stable plant operations.
- Prepare and update SOPs and process documentation.
- Coordinate preventive and corrective maintenance activities.
- Propose and implement process improvements or upgrades.
- Support compliance reporting and performance tracking.
- Manage vendor coordination for items and services.
- Train and support operators and junior staff.
- Ensure compliance with HSE standards and procedure.
Process Engineer at Aqualia & Alkhorayef Consortium (2015-11 – 2017-10)
ARANA Wastewater Treatment Plant (NWC) – Makkah
- Prepare and maintain a variety of complex technical records and reports.
- Track and review progress through meetings and evaluate contractual commissioning statistics and instruction guidelines in accordance with the needs of the project.
- Fault Finding and process optimization.
- Prepare & follow Start-up plan, Action Plans, QA/QC Plan, and SOP.
- Process adjustments to achieve requirements & optimize the process.
- Insure plant operation by SCADA system.
- Training the plant workers on best practice operation of wastewater treatment plant equipment.
- Preparing preventive maintenance plan and generating performance report.
Water & Wastewater treatment Plants Process & Quality Supervisor at AQS Pepsi Co. (2012-11 – 2015-10)
- Evaluating plant operations assures proper adjustment of plant processes; coordinates sampling operations to assure proper balance of treatment steps and meeting effluent requirements.
- Maintained site compliance by implementing statutory and legal requirements, including fire, health and safety, and hygiene.
- Adapting the industrial Wastewater treatment Process as per biological method (MBBR).
- Adapting the RO water treatment Process for Aquafina Drinking water & CSD water.
- Controlling the process variables and maintaining overall mass balance to ensure good water productivity with minimum cost.
- Preparation of Daily and weekly submission of work progress report with attached copy of analysis against production and utilized resources.
- Preparation of recovery plan for delayed work and review of schedule.