Parthiban Kamaraj
Telecom Engineer
وظّف هذا الشخص
أرسل عرض عمل مباشرة لهذا المرشح
نبذة
This is parthiban Kamaraj, bachelor's degree in electronics and Communication Engineering, having 4 years of work experience in RAN domaing.
الخبرة
Mar 2022-23 – Current Communication Engineer
@Saudi ARAMCO EWPD, Riyadh
Mohammed M Alarji trading and contracting co - Dammam,
Saudi Arabia
Installation commissioning report support safety maintenance for WRMU's.
Nov 19- Mar 21 Senior IT Executive
SAK securities services, Doha
Project coordinator for Ezdan holding and realestate
Follow up Supervisor
Network Security
Maintenance
June 18- Sep 19 Fault Management Applications Like Alarm Monitor
Evolve Technologies & services pvt ltd
Worked as a Vodafone 2G/3G/4G (BSS NMS support)
NOKIA & HUAWEI EQUIPMENT KNOWLEDGE
- Handling the smooth commissioning to Nokia also Huawei 3G & 4G BTS.
- Good Knowledge in handling Fault Management applications like alarm Monitor, Alarm history and Managed object upload. REFLECTION X-MML Software based on DX 200 platform used for BSC, of Nokia systems.
- CITRIX Program Neighborhood based on NETACT- It is a Nokia tool used for O&M purpose-GUI
- Knowing to create connections from remote terminal to cell sites for maintenance.
- Responsible for TRX addition, VSWR Clearance, BTS hardware issues and TRX Blocking Alarms.
- Resolving site down, Transmission Issues and TRX blocking Alarms.
- Implementation of GSM Networks, Integration of BTS and Software up gradation after Integration.
- Checking the GSM and CDMA antenna for proper angles and its alignments. E1 provisioning for sites during integration, Expansion, Swapping of RBS
- E1 Routing
- Have worked On Indoor and Outdoor BTS.
- Have worked on Traffic node and Huawei RTN.
- Troubleshooting, Replacing & Configuration.
- Having Experience in operation and maintenance of 3G and 4G BTS.
VODAFONE NETWORK EQUIPMENT KNOWLEDGE
- 2G BTS Equipment: NOKIA
ULTRA, MINI ULTRA, FLEXI, METRO, MR BTS, SRAN EXPANTION
- 3G BTS Equipment: NOKIA
FSMD, FSMF, FSIA, FSIB, FRGP, FRGT, FRGG, FRGQ
- 2G &3G&4G BTS Equipment: NOKIA
FSMF, FXEF, FRGY, FRGU, FYGB, FBBC1, FBBC2
- Regular cyclic check-up site deletion and creation
- Checking the TRX Quality and TCH
- Regular check up PCM failure and then take action soft loop and hard loop
- Co-ordinate with field engineer rerouting service and trail
- Regular check TCH drop, TCH block, KPI issue, SD drop, SD block
- BTS software upgrade and degrade
- Checking TCH, signaling, EDAP both bts and bsc end
- Regular check BSC wise alarms, site down • planned activity Site migration
- Regular check overall sites ET fluctuations
- Regular check all hop down for daily basis
Jan 17 – Mar 17 Site Engineer
Jio Telecom (off Roll)
Samsung equipment in installation and commissioning project
Team organizer- deep south Tamilnadu India
Mar 15 – Nov 15 Operations and Maintenance Engineer
TRIADSS TECH SOLUTIONS PVT LTD, Chennai
التعليم
Bachelor's of Electronics and Communication Engineering
