ESTIMATION ENGINEER (12 Years Experience)
أرسل عرض عمل مباشرة لهذا المرشح
I am Siva kumar. I have 12 years experience in Project execution , Estimating and Planning in EPC of GIS 115/13.8KV substation & 115KV U/G Cable Installation and Electrical maintenance.
I am looking for an Project Estimation Engineer position where I can help facilitate daily missions, execute various tasks, and act as a link between assigned senior manager and peers, partners, employees and subordinates.
Right Now I am working as a Project Estimation Engineer in Saudi Arabia.
Current Organization:-
Organization : Hadi Hamad Al-Hammam Contracting Co.(KSA).
Duration : From January 2017 to till now.
Project estimation, Bidding, Bid Management, Bid Evaluation, Tendering, Tender
Management, Preparation of Commercial and Technical Proposals.
Estimation calculation of Man hours, Labor cost, Materials cost, Equipment Cost,
Indirect Cost. (EPC & Maintenance Projects - Short Term, Mid Term & Long Term contracts)
Responsible for producing competitive prices through evaluation of instructions,
specifications, drawings, bill of quantities and discussions with technical and production departments.
Prepares the tender analysis sheet, IFP bidding contract list presents it to the
Estimation Dept. Manager, Operational Manager & General Manager.
To study and understand the scope of work, contract, schedule, project execution,
local conditions, construction execution of a specific project/proposal.
Responsible for submitting the tender on time and attending the pre-bid meetings and site visits.
Monitors and stores the costs to improve the accuracy of future pricing.
Delegates the inquiries to other estimator’s.
Checks the estimates or worksheets made by other estimators.
Maintain the estimating data bank to ensure data is updated.
Proactive in analyzing and interpreting engineering drawings to determine the estimation, strategy. Receives and evaluates tenders and enquiries.
Preparation of prime cost estimates, tenders in accordance with client requirements and risk analysis for justification of contingency if any for submission to management to apply mark up and arrive at tender submission prices.
Prepares cost comparison sheets for all supply’s & Sub-contractor items.
Do pricing for the complete project as per company’s pricing formats.
Attends to Internal Kick-Off Meetings & hand over all the contract documents to the Project team & clarifies all doubts, as and when required.
M.SIVA KUMAR
Designation : Electrical Estimation Engineer
: 12 Years
Previous Org. : HADI HAIDER CONTRACTING COMPANY, KSA.
Designation : Sr.
Engineer.
Duration : From July 2014 to August 2016.
Project : EPC of Jubail Commercial Port 115/13.8KV substation - 2
Client : Royal commission for Jubail & Yanbu.
Consultant : Saudi Electrical Company (SEC, Dammam).
I am Certified Electrical Competent Person & Work Permit Receiver From National Grid (SEC).
4.
Daily & Monthly Progress Reports of project related activities and submitted to Construction
Manager & Project Manager.
parallel activities etc.
S.S’s Layout & General Equipments Layout.
Grounding System Layout and Details.
Shielding/Lightening system Layout & Details.
Cable Ladders/Trays system Layout & Details
Power TR’s, Buildings, Indoor, and Outdoor Equipments Layout& Details
Civil Guide Drawings Layout (Cable Trenches, Tunnels / Duct Banks, Electrical Man Halls & Hand Halls,
Building Openings, Indoor & Outdoor Equipments Civil Details.etc.).
7.
Rules in Lay down area & Site area to meet client requirement for substation construction project.
Royal commission and SECO electrical safety standards.
Previous Org. : ABHEDYA INDUSTRIES LIMITED.
Product : BI-AXIALLY ORIENTED POLYPROPYLENE FILMS. (Plastic films)
Designation : Electrical Maintenance Engineer.
Duration : From JANUARY 2010 to JUNE 2014.
b) SF6 Circuit Breakers,
c) 33KV / 415 V Distribution Transformers d) 33KV CT’s and PT’s
b) 3 phase 415V AC motors and 440V DC motors
(Temperature controllers and RTD’s etc.,)
8.
AC/DC Drives Programming: Vector Control, Motion Control.
9.
PLC Programming: S-7 200/300/400.
10.
HMI/SCADA Configuration: Win CC, Win CC Flexible, Protools.
Rejection.
M.Tech : Power electronics and Electrical drives
Academic year : 2009 -2012
Percentage : 81.56%
College : Vardhaman College of Engineering
University : J.N.T.U
B.Tech : Electrical and Electronics Engineering
Academic year : 2005 -2009
Percentage : 60.78%
College : Sri Kottam Tulasi Reddy Memorial College of Engineering
University : J.N.T.U
Intermediate : MPC
Academic year : 2003-2005
Percentage : 70.20%
College : Sri Manik Junior College.
SSC
Academic year : 2002-2003
Percentage : 73.00%
School : Govt.high School