New Pyae Sone Group Co.,Ltd. (Myanmar) Sept 2020 – Until Now
Duties & Responsibilities
- Make report to HPBC (High-Rise and Public Building Projects Committee).
- Inspect as representative and registered of HPBC all electrical installation (high/low voltage. ELV, lightning, earthing system) as per approved drawing and HPBC Guide Line.
- Monitor and coordinate with main construction company to meet Guide Line, time schedule.
- Conduct with test & commissioning and internal QC team of construction for finishing systems, collect government authority inspection approval documents to make report.
- Keep in discuss for progress, drawing updating, material specification and installation status.
- Provided technical support and assist contractors to comply with installation guide line.
KTK Electrical Engineering Co.,Ltd. (Myanmar) Mar 2014 – Aug 2020
Duties & Responsibilities
- Managed assembling section of panel production and cooperate with other sections of design, procurement, control wiring, painting, machining for production process.
- Managed installation and servicing for customer panels and devices on site.
- Made operation & maintenance manual documents for product panels.
- Carried out FAT, SAT testing with client, government supply team, gen set team.
- Coordinated with production process and installation teams for customer onsite requirements.
- Served as the main point of engineering technical challenge and product quality for customer.
EDARAN ASIA PTE., LTD. (Singapore) May 2010 – Feb 2014
Duties & Responsibilities
- Cooperated with design & draft section to make new drawings, modify and update drawings.
- Installed compulsory systems for accommodation crane barge (living rooms, crane, helideck, firefighting (including sprinkler, CO2, foam), gen-set, AHU, ballast tank, sewage, etc.
- Installed pressurized fan, detectors (gas, smoke, heat), pressure differential meter, air pressure control damper, beacon alarm, PLC control panel, etc, for pressurize container.
- Managed labors, materials and time controlling of unnecessary wastes for a specific project.
- Discussed with site supervisors to accept client inspection and to complete at the target date.
- Conducted with testing & commissioning team to be acceptable to marine class requirements.
OCEAN MARINE & OFFSHORE PTE.,LTD. (Singapore) May 2007 – April 2010
Duties & Responsibilities
- Supervised installation of mechanical & electrical instruments at FPSO ship, supplier ship, semi-submersible rig construction projects.
- Prepared detailed schedule of works and got approval of Senior Engineer for further action.
- Attended site internal meetings to discuss the problems that related status of the projects.
- Learned and studied the working process in site conditions.
- Worked within project deadlines and prioritizing task from time to time as scheduled.
- Checked the electrical devices and fixtures (cable laying and termination, panel, DB board, smoke detector, heat detector, speaker, switch, lighting, etc) installation finishing works.
- Reported to Senior Engineer finishing and maintained checking day-to-day installations.
Peace Myanmar Electric Co., Ltd. (Myanmar) July 2004 – Jan 2007
Duties & Responsibilities
- Installed cable ladder & tray, wiring, air-con, fixtures, etc. for resident and generator, panel, motor starter etc. for industry.
- Discussed with supervisor, leader for progress, drawing, materials status to meet schedule.
- Supervised to the general workers in all process of manufacturing.
- Cooperated for drawing making, material purchasing and solving engineering problems.
- Checked all finishing conditions and tested running operation.