Skip to main content
Deivanayagam Nagaraj

Deivanayagam Nagaraj

Mechanical & Electrical Technician

Talent
SingaporeMember since August 19, 2026
Electrical ConstructionHT/LT Cable PullingControl & Instrumentation Cable PullingCable TestingEarth Rod TestingJob Safety Analysis (JSA)Task Risk Analysis (TRA)Site Walk downAs Built Mark-up DrawingTest Pack PreparationQA/QC ActivitiesMethod of Statement Review
·

Hire this person

Send a job offer directly to this candidate

Electrical ConstructionHT/LT Cable PullingControl & Instrumentation Cable PullingCable TestingEarth Rod Testing

About

To be Excellent Mechanical & Electrical Technician in a result oriented company that seeks an ambitious and career conscious person, where acquired skills and education will utilized towards continuous growth and advancement.

Experience

Class 4 DRIVER - TSH GAS PTE. LTD - Singapore

(2016-08 - 2025-03)

  • Used 28tone mobile bin lorry for disposal of rubbish point to point island wide
  • Worked 24 footer long open truck to delivery material to island wide
  • Collection of Carton box scrap metal and copper, aluminium etc.

Class 4 DRIVER - FONG SHENG LONG - Singapore

(2015-03 - 2016-06)

  • Used 28tone mobile bin lorry for disposal of rubbish point to point island wide
  • Worked 24 footer long open truck to delivery material to island wide
  • Collection of Carton box scrap metal and copper, aluminium etc.

QA/QC - SK E&C SINGAPORE - Singapore

(2013-01 - 2014-12)

End User: Jurong Aromatics Corporation Pte Ltd. Project: JAC (Jurong Aromatics Complex Project)

  • Study and Understand the design Drawings and Specifications for the proper quantity take off standards
  • As Built Mark-up drawing and Test pack preparation
  • Handle daily reports submissions by subcontractor
  • Verification of job installation & completion from relevant related subcontractors and vendors
  • Check and verifications of documentation for the work packs and permits for the associated systems by contractors
  • Planning & Preparing Electrical Construction Schedules and monitor the work progress. Co-ordinate with Construction Team, Engineers & QA/QC Team
  • System Walk down with End User
  • Managing all Permitting System
  • Each Job Relevant Job Safety Analysis (JSA) & Task Risk Analysis (TRA) & Method of Statement Review and approval
  • Implement the safety procedures
  • Inspection of Earth Rod, Grid Earth Cable & Earth Rod Testing for Earthling's System
  • Inspection of Cathodic Protection - Anode Installation & Anode cables, Cad Welding
  • Inspection of all the Cable Trays & Ladder Support Installation
  • Inspection of all the Cable Trays & Ladders
  • Installation Inspection MV & LV Panels, MV&LV Transformers & MV&LV Ducting
  • Installation Inspection for F&G and Lighting System to Building Area
  • Handing over to electrical systems & final reports to client

QA/QC TECHNICIAN - ABB PTE LTD, (Singapore) - Singapore

(2012-01 - 2013-12)

Client: SK Engineering & Construction. End User: Jurong Aromatics Corporation Pte. Ltd. Project: JAC (Jurong Aromatics Complex Project). Working as a Electrical QA/QC Technician, Managing all Internal Inspection and Walk down with Main contractor with End User to Ensure the Electrical Equipment is correct as per the Engineering Standard.

  • Study and Understand the design Drawings and Specifications for the proper quantity take off as per client standards
  • As Built Mark-up drawing and Test pack preparation
  • Daily Report Submission to main contractor
  • Preparation of documentation for the work packs and permits for the associated systems
  • Planning & Preparing Electrical Construction Schedules and monitor the work progress. Co-ordinate with Construction Team, Engineers & Supervisors for work schedule
  • System Walk down with main contractors with End User
  • Managing all Permitting System
  • Each Job Relevant Job Safety Analysis (JSA) & Task Risk Analysis (TRA) & Method of Statement Review and approval
  • Involved and worked with turnover team as submitting the dossiers for handover to client
  • Implement the safety procedures
  • Inspection of Earth Rod, Grid Earth Cable & Earth Rod Testing for Earthlings System
  • Inspection of Cathodic Protection - Anode Installation & Anode cables, Cad Welding
  • Inspection of all the Cable Trays & Ladder Support Installation
  • Inspection of all the Cable Trays & Ladders
  • Installation Inspection MV & LV Panels, MV&LV Transformers & MV&LV Ducting
  • Installation Inspection for F&G and Lighting System to Building Area

Electrical Foreman - ABB PTE LTD, (Singapore) - Singapore

(2010-01 - 2011-12)

Client: Foster Wheeler Asia Pacific Private Limited. End User: Exxon Mobil, Jurong Island (Singapore). Project: SPT (Singapore Parallel Train Project)

  • Study and Understand the design drawings and specifications for the proper quantity take off as per client standards
  • QA/QC activities, functional test of the field Instruments & Inspection
  • Doing site walk down with main contractor and client to confirm the installation is correct as per engineering standards
  • Planning, scheduling and execute the job
  • Also My Responsibilities are to close all types of pinch list and proceeding the loop dossiers for the next step of doing loop check
  • Monitoring daily progress and report to daily client meeting
  • Daily meet and discussion with our direct project manager regarding the queries and improvement of the project
  • Involved and worked with turnover team as submitting the dossiers for handover to client
  • Implement the safety procedures to the contract employees
  • Installation of Cable Tray and Cable Ladders c\w supports and accessories
  • HT/LT Cable Pulling
  • Control & Instrumentation Cable Pulling

QC Technician - AAL TECH MARINE PTE LTD, (Singapore) - Singapore

(2008-01 - 2010-12)

Client: Project 1: Keppel Fels Ltd, Project 2: Keppel Fels Ltd. Project: Project 1: Deep Drilling Invest (284 & 289), Project 2: SKDP (300, 301 & 306). Working as a QC Technician. Responsibilities is Inspection & Erection of Electrical System & Field Instruments.

  • Study and Understand the design drawings and specifications for the proper quantity take off as per client standards
  • Inspection of Cable Ladder and Tray Support and cable ladder & Tray Installation Inspection
  • Inspection of all the Cable Trays & Ladders
  • Installation Inspection MV & LV Panels, MV&LV Transformers & MV&LV Ducting
  • Installation Inspection for F&G and Lighting System to Building Area
  • Installation Inspection for 690V & 480V Main Switchboard
  • Installation Inspection for 240V Main Lighting Switchboard & Emergency Lighting Switchboard
  • Installation inspection for all Lighting Panel & JB as per the client Standards
  • Installation inspection for Smoke detector system, Fire & Alarm system, & Communication Systems
  • Cable Testing
  • Trouble shooting at H.T. & L.T Electrical control panels & all Other Electrical equipment's
  • Installation of Variable Speed Control Panel, LV Circuit Breaker/ Starter, HV Circuit Breaker and Starter, Neutral Earth Resistor, Trace Heating Circuit, Current Transformer, Navigational Aids, Small Power Circuit, Protection relay, Control/ Indication Interface, Electric Motor, LV Generator, HV Generator, Welding Socket Circuit, Lighting Circuit, HV/LV Transformer, Control Panel, LV Distribution Board, HV Switchboard, LV Switchboard/ MCC, UPS/Charges/Inverter, Battery, Battery Discharge Test, H

Education

National Apprenticeship - Indian Railway - Integral Coach Factory (2006-01 - 2007-12)

Industrial Training Institute - Mechanic Motor Vehicle NTC - Industrial Training Institute (2003-01 - 2005-12)

Higher Secondary School - Higher Secondary School (2001-01 - 2003-12)

S.S.L.C - School (2000-01 - 2001-12)

Diploma in Computer Application - Computer Application - Institute of Technical Education (2008-01 - 2008-03)

Skills

Mechanical & Electrical Technician

Reviews

Related