Class 4 DRIVER - TSH GAS PTE. LTD - Singapore
(2016-08 - 2025-03)
- Used 28tone mobile bin lorry for disposal of rubbish point to point island wide
- Worked 24 footer long open truck to delivery material to island wide
- Collection of Carton box scrap metal and copper, aluminium etc.
Class 4 DRIVER - FONG SHENG LONG - Singapore
(2015-03 - 2016-06)
- Used 28tone mobile bin lorry for disposal of rubbish point to point island wide
- Worked 24 footer long open truck to delivery material to island wide
- Collection of Carton box scrap metal and copper, aluminium etc.
QA/QC - SK E&C SINGAPORE - Singapore
(2013-01 - 2014-12)
End User: Jurong Aromatics Corporation Pte Ltd. Project: JAC (Jurong Aromatics Complex Project)
- Study and Understand the design Drawings and Specifications for the proper quantity take off standards
- As Built Mark-up drawing and Test pack preparation
- Handle daily reports submissions by subcontractor
- Verification of job installation & completion from relevant related subcontractors and vendors
- Check and verifications of documentation for the work packs and permits for the associated systems by contractors
- Planning & Preparing Electrical Construction Schedules and monitor the work progress. Co-ordinate with Construction Team, Engineers & QA/QC Team
- System Walk down with End User
- Managing all Permitting System
- Each Job Relevant Job Safety Analysis (JSA) & Task Risk Analysis (TRA) & Method of Statement Review and approval
- Implement the safety procedures
- Inspection of Earth Rod, Grid Earth Cable & Earth Rod Testing for Earthling's System
- Inspection of Cathodic Protection - Anode Installation & Anode cables, Cad Welding
- Inspection of all the Cable Trays & Ladder Support Installation
- Inspection of all the Cable Trays & Ladders
- Installation Inspection MV & LV Panels, MV&LV Transformers & MV&LV Ducting
- Installation Inspection for F&G and Lighting System to Building Area
- Handing over to electrical systems & final reports to client
QA/QC TECHNICIAN - ABB PTE LTD, (Singapore) - Singapore
(2012-01 - 2013-12)
Client: SK Engineering & Construction. End User: Jurong Aromatics Corporation Pte. Ltd. Project: JAC (Jurong Aromatics Complex Project). Working as a Electrical QA/QC Technician, Managing all Internal Inspection and Walk down with Main contractor with End User to Ensure the Electrical Equipment is correct as per the Engineering Standard.
- Study and Understand the design Drawings and Specifications for the proper quantity take off as per client standards
- As Built Mark-up drawing and Test pack preparation
- Daily Report Submission to main contractor
- Preparation of documentation for the work packs and permits for the associated systems
- Planning & Preparing Electrical Construction Schedules and monitor the work progress. Co-ordinate with Construction Team, Engineers & Supervisors for work schedule
- System Walk down with main contractors with End User
- Managing all Permitting System
- Each Job Relevant Job Safety Analysis (JSA) & Task Risk Analysis (TRA) & Method of Statement Review and approval
- Involved and worked with turnover team as submitting the dossiers for handover to client
- Implement the safety procedures
- Inspection of Earth Rod, Grid Earth Cable & Earth Rod Testing for Earthlings System
- Inspection of Cathodic Protection - Anode Installation & Anode cables, Cad Welding
- Inspection of all the Cable Trays & Ladder Support Installation
- Inspection of all the Cable Trays & Ladders
- Installation Inspection MV & LV Panels, MV&LV Transformers & MV&LV Ducting
- Installation Inspection for F&G and Lighting System to Building Area
Electrical Foreman - ABB PTE LTD, (Singapore) - Singapore
(2010-01 - 2011-12)
Client: Foster Wheeler Asia Pacific Private Limited. End User: Exxon Mobil, Jurong Island (Singapore). Project: SPT (Singapore Parallel Train Project)
- Study and Understand the design drawings and specifications for the proper quantity take off as per client standards
- QA/QC activities, functional test of the field Instruments & Inspection
- Doing site walk down with main contractor and client to confirm the installation is correct as per engineering standards
- Planning, scheduling and execute the job
- Also My Responsibilities are to close all types of pinch list and proceeding the loop dossiers for the next step of doing loop check
- Monitoring daily progress and report to daily client meeting
- Daily meet and discussion with our direct project manager regarding the queries and improvement of the project
- Involved and worked with turnover team as submitting the dossiers for handover to client
- Implement the safety procedures to the contract employees
- Installation of Cable Tray and Cable Ladders c\w supports and accessories
- HT/LT Cable Pulling
- Control & Instrumentation Cable Pulling
QC Technician - AAL TECH MARINE PTE LTD, (Singapore) - Singapore
(2008-01 - 2010-12)
Client: Project 1: Keppel Fels Ltd, Project 2: Keppel Fels Ltd. Project: Project 1: Deep Drilling Invest (284 & 289), Project 2: SKDP (300, 301 & 306). Working as a QC Technician. Responsibilities is Inspection & Erection of Electrical System & Field Instruments.
- Study and Understand the design drawings and specifications for the proper quantity take off as per client standards
- Inspection of Cable Ladder and Tray Support and cable ladder & Tray Installation Inspection
- Inspection of all the Cable Trays & Ladders
- Installation Inspection MV & LV Panels, MV&LV Transformers & MV&LV Ducting
- Installation Inspection for F&G and Lighting System to Building Area
- Installation Inspection for 690V & 480V Main Switchboard
- Installation Inspection for 240V Main Lighting Switchboard & Emergency Lighting Switchboard
- Installation inspection for all Lighting Panel & JB as per the client Standards
- Installation inspection for Smoke detector system, Fire & Alarm system, & Communication Systems
- Cable Testing
- Trouble shooting at H.T. & L.T Electrical control panels & all Other Electrical equipment's
- Installation of Variable Speed Control Panel, LV Circuit Breaker/ Starter, HV Circuit Breaker and Starter, Neutral Earth Resistor, Trace Heating Circuit, Current Transformer, Navigational Aids, Small Power Circuit, Protection relay, Control/ Indication Interface, Electric Motor, LV Generator, HV Generator, Welding Socket Circuit, Lighting Circuit, HV/LV Transformer, Control Panel, LV Distribution Board, HV Switchboard, LV Switchboard/ MCC, UPS/Charges/Inverter, Battery, Battery Discharge Test, H