Jose Mari Camacho
PLANNING MANAGER / MAINTENANCE PROGRAM ENGINEER
Hire this person
Send a job offer directly to this candidate
About
My employment experience has provided me with invaluable exposure to commercial as well as corporate operations in international and regional environments. These, coupled with the competent knowledge in the field of aviation has not only honed my technical abilities, but has also developed my analytical reasoning, the capability to problem solve effectively and my ability to adapt to dynamic circumstances.
Experience
BOMBARDIER AEROSPACE SERVICES (SINGAPORE)
Customer Project Manager
Aircraft Type Handled: Global, Challenger, Lear Jet
System Handled: SAP
April 24, 2023 – Present
March 21, 2022 – April 14, 2023 (Under Randstad Agency)
BOEING SINGAPORE (SINGAPORE) -
BOEING ASIA PACIFIC AVIATION SERVICES
Aircraft Type Handled: B747-400, B787, B777 System Handled: SAP
May 1, 2015 – Aug 27, 2020 (Planning Manager)
October 1, 2013 – April 30, 2015 (L4 Maintenance Planner)
January 3, 2012 – September 30, 2013 (L3 Maintenance Planner)
HAWKER PACIFIC ASIA (SINGAPORE)
Project Manager
Aircraft Type Handled: Embraer 600, Phenom 100 F,alcon 7X, 2000, 900s, King Air 300, Hawker 400, 4000
System Handled: IFS
February 1, 2011 – December 30, 2011
PANASONIC AVIONICS CORPORATION
Maintenance Planner
Aircraft Type Handled: B747’s, B777’s, A330, A340-500, A380-800
System Handled: Oracle
December 3, 2007 – January 31, 2011
SINGAPORE HAECO Pte. Ltd.
Maintenance Planning Engineer
Aircraft Type Handled: B747’s and B757
System Handled: RAL
May 21, 2007 – November 30, 2007
SINGAPORE AIRLINES ENGINEERING CO. (SIAEC)
Materials / Production Planner ( Fleet Management Programme ) Aircraft Type Handled: B747’s, A310’s, A319’s and A320’s
System Handled: SAP, SAMEIS
June 15, 2005 – May 19, 2007 (SIAEC) April 15, 2004 – June 14, 2005 (Aviation Jobs Int’l)
EAGLES SERVICES ASIA
Production Planner
Engine Handled: PW4000 42in, 100in and JT9D
System Handled: SAP
January 15, 2002 – July 4, 2003
CEBU PACIFIC AIR
Maintenance Planner Aircraft Handled: DC-9 and B-757
System Handled: SAP and AIMS
October 15, 2001 – January 14, 2002
CEBU PACIFIC AIR
Production Controller Aircraft Handled: DC-9 and B-757
System Handled: SAP and AIMS
March 14, 2001 – October 14, 2001
Education
Airlink International Aviation School (College / Degree)
- B.S. Aerospace Engineering
- March 1997
- Magna Cum Laude
Aquinas School (Secondary School)
- March 1992
- Third Honor
Aquinas School (Primary School)
- March 1988