Project/Package Manager in Oil and Gas Industries
Send a job offer directly to this candidate
With Subsea7, EMAS Chiyado/Aker Marine Contractor, Saipem, Global Industries, McDermott & L&T, completed various offshore projects by using 7Champaign/WB300/Castoro8/DLB332/DLB-264/DB-27/DB-26/Lewek Crusader/Lewek Teal/Lewek Toucan/Lewek Falcon/DSV-Eclipse.
FPSO Installation & De-commissioning: Installed 3 x NEW FPSO with external turret mooring system and associated with Mooring chain connection with Piles, Chain hook-up & tensioning, mid water arch, flexible risers, etc, including towing of FPSO. Also performed 3 x FPSO de-commissioning work includes Tri-catenary Mooring system, mooring chain, and anchor recovery etc.
Tender Support for Platform Installation, FPSO, Mooring System, Mid Water Arch, Flexibles Risers and Rigid Pipelaying, Spools, Riser Stalk-on, Crossing Supports and Grouting Operation: Supported 1st LTA SA tender with J Ray McDermott Dubai for MPOT 2006, HASBAH-II Tender Onshore JV Scope with L&T Consortium Partner for EMAS Chiyoda, ONGC-PRP3 Tender, 4 FPSO (Alima FPU, Thang Long Dong Do (TLDD) FPSO, Gendalo/Gehem FPSO) for EMAS AMC, MIP-2 Tender Offshore /Onshore Site Visit for Subsea7.
Offshore Structure (Jacket/Topside) Installation: Over 30 fixed Jackets installation includes Launching/Two block upending/vertical lifting & its auxiliary works (internal/external Skirt piles/Conductor Piles, Boat landing, Riser guards, Drilling Deck, Wireline poles), 20 Topsides/Deck Modules including Scrapper Deck, Production Deck Modules (PDM) & Flare Boom etc.
Subsea Package Fabrication: Package delivery includes Managing onshore fabrication package preparation, fabrication vendor selection and evaluation process and monitor their work scope for 240 spools/54 Risers/J-tubes/Subsea clamps and 450 crossing supports and 700 concrete mattresses delivery/loadout to execute offshore installation.
Subsea Works Associated with Diving Support Vessel: Project Management & offshore execution of around 50+ Risers, 20+ J/I-tubes, 200+ subsea clamps, 20+ PLEMs, 350+ Spools, 10+ Flexible Risers, 5+Mid water Arch, 900+ pipeline free span connection, 200+ post-lay support installation etc including vessel selection.
Master of Science in Offshore Technology
National University of Singapore (NUS)
Bachelor of Engineering (Civil Engineering)
Bharathidasan University, India
Diploma in Civil Engineering First Class with Honours
Seshasayee Institute of Technology, India