About

I have been working with Land Transport Authority(LTA) for the past 10 years. I have completed 7 different MRT & LRT projects. Currently involved in BPLRT enhancement project and targeted to complete the milestone by 2016.

I am seeking more challenging opportunities in a different industry. I would like to use my vast experience and skillset for my next future employer. I am highly motivated individual and not afraid to test my capability in a new environment.

Experience

  • Responsible in ensuring that project meet the required milestone.
  • Perform site supervision during installation works at MRT & LRT Depot and Mainline stations.
  • Ensure Installation works meet the approved design drawings & documents.
  • Perform testing and commissioning works for newly installed equipment and train system.
  • Perform troubleshooting works and ensure critical systems are rectified before handing over to the operators for revenue service.
  • Perform site investigation works during an incident and accident occurred at work site.
  • Conduct site inspection & quality works and ensure equipment meet the standard specifications.
  • Conduct precondition site surveys for contractors and LTA.
  • Trained in handling railway traction power isolation at SBST and SMRT facilities.
  • Involved in high risk lifting of new equipment & LRT/MRT train via viaduct.
  • Involved in road diversion during the delivery of new Transformer & Traction power breakers at SBST LRT stations & Depot.
  • Review risk assessments for new and existing project implementation at SBST & SMRT facilities.
  • Review design submission documents for new and existing projects.
  • Involved in new train testing & commissioning at SBST & SMRT.
  • Involved in the introduction of BIM into new LTA Circle Line 6 project.
  • Involved in the developing of new tender documentation.
  • Perform site coordination works between System Wide Contractors (SWC) and respective stakeholders within SMRT & LTA agency.
  • Responsible in ensuring contractors adhere to site and system safety prior to work commencement.
  • Main role as a document controller and ensure required documentation are approved within stated timeline.
  • Perform minutes writer for project weekly and monthly meeting.
  • Chaired weekly progress meeting with contractors.
  • Main coordinator for LTA/SMRT Trainings.
  • Conduct internal orientation trainings for new LTA staff.

Education

  • Year 2014 - 2016
NANYANG TECHNOLOGICAL UNIVERSITY

BACHELOR IN ELECTRICAL & ELECTRONIC ENGINEERING

Status: Incomplete

  • Year 2007 - 2010
SINGAPORE POLYTECHNIC

DIPLOMA IN ELECTRICAL & ELECTRONIC ENGINEERING

Specialised in Power & Control Engineering