Sr. Surveyor - Al-Rashid Trading & Contracting Co (RTCC) - Riyadh
(2023-01)
Sr. Surveyor - Al-Rashid Trading & Contracting Co (RTCC) - Al Shuqaiq
(2018-01 - 2023-12)
Sr. Surveyor - Al-Rashid Trading & Contracting Co (RTCC) - Jizan
(2016-01 - 2018-12)
Surveyor - Al-Rashid Trading & Contracting Co (RTCC) - Riyadh
(2013-01 - 2016-12)
Surveyor - Al-Rashid Trading & Contracting Co (RTCC) - Abha
(2011-01 - 2013-12)
Surveyor - Consolidated Contractors International Company (CCIC) - Ras Lafan Industrial City, QATAR
(2001-01 - 2007-12)
- For safety, follow the Project Safety Plan (PSP).
- Taking the required approvals form QATAR GAS and Municipality of QATAR
- Shift the control points around the RAS GAS all areas on plot / off plot and port area (loading arms) and prepared the traverse report of control points
- started the topographic survey for all areas on plot / off plot and port area (on plot Gas plant /infrastructure) off plot (pipe rakes / pipe lines and LNG storage tanks) port area (sea water intake / loading arms and) and Transfer and downloading and converting the topographic survey data from GPS and total stations to personal laptop in Auto Cad format,
- Coordinate with site engineers project Engineer consultants, client, and concerning work standards and safety department to ensure timely program of activities to Start the layout for location of plant equipment / structure foundations, pipeline routes, and All type of excavation / piling works Monitoring the hard rock areas blasting excavation / normal excavation,
- at sea port area piling, and sheet piling, offshore flares foundation piling work by barge for piling / excluding Berth 1 and their associated structures before concrete pouring Perform initial and final survey inspection of all civil works establish survey control over a large working area and carry out these tasks very efficiently and attend the Meetings with Client.
- Establishing main pipe rack foundation formation work for pre-cast concrete structure / steel structure pipe rakes, heavy equipment foundation, pits, gas pipe lines, sewerage networks, drainage and plant control buildings, substations, plant internal roads, heavy pipe lines, out falls.
- preparing proper survey reports for each job Monitored the day to day activities and prepared the project diary Conduct survey inspection with the consultants, client prepared the as built results are analyzed and then presented in digital 3D format / conventional drawings according to clients preferences The data can also be exported to any user defined format to suit the various needs of clients.