I&E Inspector - Inspection Associates
(2025-11 - 2026-03)
- Walk down Installation Request with Contractor
- Verify Installations meet NEC
- Walk down Cable Tray Installations per NEMA V2
- Walk Lightning Arrestor Systems
- Verify Heat Trace Installation and locations
- Verify Cat 6, Racks, Network Switches installed per drawings
- Verify BOM on Material Arrivals
- Coordinate with Contractors for Inspection Walks
I&E Quality Control - Northstar Services
(2025-11 - 2026-03)
- Wiring Diagrams / One Lines / Wiring Schematics / P&ID's
- Witness Megg Reels
- Witness Ground Installations and reference Details
- Build Folders ITR's and Installation Forms
- Generate Spreadsheet for Folder Tracking
- Witness and Drawing Review for Duct Bank Installations
- Verify BOM equipment arrival
I&E Inspector - Group One Industrial
(2025-03 - 2025-09)
- Stress Cones installed properly, and Hi-pot tested
- Witness Megg of Power Cables
- Verify Point to Point with Contractor
- Verify Equipment Switchgear Installation Assembly
- Coordination with Subcontractors: Lighting Arrestors, Building, Firewater, Fire Alarm
- Walk down Heat Trace Systems with Contractor
- Walk down P&IDs for Vendor Pump Skids and Area P&IDs
- Coordinate with other craft QC for Building/ Equipment Stub ups
I&E Inspector - Energy Inspection Services
(2022-06 - 2025-03)
- Verify Stress cones installed properly and Hipot tested
- Witness Megg of Power Cables
- Verify Point to Point with Contractor
- Verify Equipment Switchgear Installation Assembly
- Oversee Substation Equipment Installation: Air Switches, Tap Boxes, Manual Operation Bypass alignment
- Attend Meetings Update PM on Contractor Installations/Concerns
- Oversee Fiber Optic Installation, IT Racks
- Walk P&ID with Mechanical QC to Release Lines for Heat Trace Installation
- Coordinate with Cathodic Group for Anode Installations
- Coordinate with Clients Testing Contractors: Such as UPS start up, ATS System, Capacitor Bank, Load Bank, Backup Generator, Hipot testing, MV, HV, Interconnects verification
- Coordinate and assist request for measurement group
- Review Drawings One Lines, Wiring Schematics, Electrical Lay Outs, H- Frame Incoming Pole Services
- Oversee and Assist Contractor with questions and RFI's to be sent to Engineering
I&E Inspector - J Tam Engineering
(2020-09 - 2022-03)
- Drawing review: One Lines, Cable Schedules, Power Panel Schedules, P&ID's
- Oversee Contractor Installations, Grounding, Cable Tray's, Building Control Room
- Warehouse Installations, Duct Banks, Pull Boxes, Tap Boxes
- UPS Installations & Commission
- Generator/ATS Installations and Commission
- Verify Point to Point with Contractor
- Dock loading arm Commissioning
- Review all ITP's and sign offs
- Attending meetings for vendors and scheduling
- Witness Motor Run ins and verify rotation
I&E Inspector - Kestrel Engineering, Inc.
(2018-06 - 2020-09)
- Commission and sell of Motors, transformers, transmitters, flow meters, lighting, grounding, Analyzers, PEC buildings, MCC's, Switchgears, and UPS system
- Oversee Contractor installations per Client Details and Specifications (Reference NEC)
- Document and report contractor's installations, drawings, sign off folders
- Test results, loop checks, motors, high and medium switch gear assembly, VFD's
- Inspect all the above and underground installations for sell of witness Arc Flash Plenum F.A.T's and motor run-ins, Hipot
Electrical Foreman - PLC Construction
(2017-03 - 2018-05)
- Attend Morning and ongoing weekly meetings
- Execute work deadlines
- Oversee foreman and employee's installations, wiring and cable pulls
- Prepare material take off requests
- Install Heat Trace Panels, set points in heat trace Controllers and Transformers
- Pretest heat trace panels
Electrical Foreman - Strike LLC
(2017-10 - 2018-02)
- Oversee installations on conduit, grounding, cable pulls, duct banks, setting of transformers 15kv, 4160kv & 480v
- Assist vendors with wiring configuration
- Goal is to turn over a functional facility
- Fence grounding, cable testing, troubleshooting meg wires, install light poles and ESD stands and mounting J boxes and lighting arrester system
Electrical Foreman - Triad Electric & Controls
(2016-07 - 2017-11)
- Oversee Substation and Transformer yard, Motor, Transformer, Power/Control Terminations
- Assist with trouble shooting termination, Project Walk downs with client and third party
- Plan for Motor Solo runs and PSSR inspection and checkout
- Install aviation lights with controllers and assist with programming, install lighting, convenience outlets, welding outlets
I/E GF - Bilfinger/ Westcon
(2011-11 - 2016-07)
- Attend Morning and ongoing weekly meetings
- Execute work deadlines
- Prepare material take off requests
- Install Heat Trace Panels/Controllers
- Coordinate with plant representatives, plan and schedule vendors, perform project walk thru
- Review Drawings, Send RFI to Engineer, build sign off folders and permit request
- Install Conduit, cable trays, supports, stress cones, buss duct
- Also, Transmitters, build communication racks, and pull wire
- Terminate Field / MCC
- Troubleshoot and verify loops and assist in startup
I/E General Foreman - Williams Industrial
(2011-07 - 2011-11)
- Attend Morning and ongoing weekly meetings
- Execute work deadlines
- Prepare material take off requests
- Install Heat Trace Panels/Controllers
- Coordinate with plant representatives, plan and schedule vendors, perform project walk thru
- Review Drawings, Send RFI to Engineer, build sign off folders and permit request
- Project walk with QC, plan and schedule sell offs
Electrical Foreman - Tracer Construction
(2010-12 - 2011-07)
- Attend Morning and ongoing weekly meetings
- Execute work deadlines
- Prepare material take off requests
- Install Heat Trace Panels, set points in heat trace Controllers and Transformers
- Pretest heat trace panels
- Coordinate with plant representatives, plan and schedule vendors, perform project walk thru
- Review Drawings, Send RFI to Engineer, build sign off folders and permit request
- Project walk through with QC, plan and schedule sell offs