Engineering Procedure Writer - AEG - Remote (Palisades Restart Project)
(2025-09 - 2026-02)
Develop and reviewed technical documentation required to safely transition Palisades Nuclear facility from construction to operation.
- Develop and revise technical procedures, including administrative, testing, and operating procedures (SOPs) for startup.
- Interface with Senior Reactor Operators (SRO's) and Test Engineers to gather technical data and ensure procedures are accurate, practical, and safe.
Startup & Commissioning Procedure Writer - APS Solutions - Remote (Compressor Project)
(2024-10 - 2025-02)
Develop and reviewed technical documentation required to safely transition industrial facilities (such as nuclear power plants, oil & gas, or manufacturing facilities) from construction to operation.
- Develop and revise technical procedures, including administrative, testing, and operating procedures (SOPs) for commissioning.
- Interface with Subject Matter Experts (SMEs) engineers, and operators to gather technical data and ensure procedures are accurate, practical, and safe.
- Ensure all documentation adheres to company standards, industry codes, and regulatory requirements.
- Analytical skills to identify potential issues and develop mitigation strategies.
- Prepare and review system turnover packages (TOPs), ensuring all testing documentation is complete.
Electrical Planner/Scheduler - Allied Power - Braidwood- Braceville, IL
(2024-04 - 2024-04)
- Provided electrical maintenance work packages for technical review.
- Analyze time and material requirements for work activity.
- Prepare detailed material takeoffs/specifications for Bill of materials and work activity labor estimates.
- Prepare and/or review efficient and specific instructions for the isolation, containment de-energization of various mechanical, physical, electrical, chemical energy systems or radiological sources according to established procedures.
Electrical Coordinator/Oversight (2A MPR Upgrade) - Day & Zimmermann - Catawba Nuclear
(2024-02 - 2024-04)
- Ensure electricians follow Catawba procedures while lifting and landed electrical wires.
- Ensure electricians follow Catawba procedures for install of electrical components.
- Communicated with various departments to keep everyone on board about any changes to the project plan.
Engineering Procedure Writer – PUP (Ovation) - BCP Engineers - Farley Nuclear
(2023-06 - 2023-09)
Perform I&C/Electrical ovation procedures revisions per 10 CFR 50.59/72.48 standard modification changes process at Farley Nuclear facility for license.
- Incorporated information gained from INPO Significant Operating Experience Reports, NRC Circulars, Bulletins, and Information Notices, plant design changes, plant procedure changes and revisions, and new regulations, and training effectiveness reports into Engineering procedures, as applicable.
- Coordinates with other departments for cross-discipline procedure reviews.
- Engages with industry peers, 3rd party vendors, ASME, NEI, EPRI, INPO and other organizations to find innovative methods & technologies for developing Engineering processes and procedures.
- Develop and maintain knowledge of plant design, plant operations and maintenance, disciplinary skills and techniques, commensurate with the responsibility to develop effective, high-quality procedures.
Project Coordinator/Outage Control Center - Day & Zimmermann - Hatch Nuclear
(2023-01 - 2023-02)
- Reported status of critical & non critical tasks to the Outage Control Center for project tracking.
- Ensure the schedule, budget and details of given tasks are well organized.
- Communicated with various department to keep everyone on board about any changes to the project plan.
SNC Electrical Oversight/Work Control - Thomas-Thor - Vogtle U3 & U4- Waynesboro, GA
(2022-01 - 2023-01)
- Interact frequently and directly with sub-contractors from Area Manager/ General Superintendent / Superintendent levels driving leaders to succeed.
- Interact directly with system completions teams ensuring success in turning over systems to site testing group.
- Utilize ESOMs software to verify Lockout-Tag clearances with other group organization for compliance before entering into the field.
- Provides general, entry-level support to the engineering department.
- Verifies and tests assigned metrics on projects.
- Enters test results into quality control database.
Procedure Writer - BHI Energy - Canada National Lab (Contract)
(2022-05 - 2023-02)
Perform procedure revisions per Canada national lab review for nuclear license at different facilities.
- Develop electrical, and mechanical procedures to ensure safety for contractors, equipment and site personnel.
- Develop and maintain knowledge of plant design, plant operations and maintenance, disciplinary skills and techniques, commensurate with the responsibility to develop effective, high-quality procedures.
- Engages with industry peers, 3rd party vendors, ASME, NEI, EPRI, INPO and other organizations to find innovative methods & technologies for developing Engineering processes and procedures.
- Coordinated with other departments for cross-discipline procedure reviews.
Electrical Owner/Procedure Writer - Jacobs Engineering - Swift water, PA
(2021-07 - 2022-01)
- Develop electrical procedures to ensure safety for electrical workers, equipment and site personnel.
- Coordinated with other departments for cross-discipline procedure reviews.
- Worked with site management to develop lockout-tagout procedures.
Electrical Planner/Work Control - Williams Group - Vogtle U3 & U4- Waynesboro, GA
(2021-03 - 2021-05)
- Collaborated with engineers, and subcontractors to determine project needs.
- Monitor and reported project progress on a daily basis.
- Supervise subcontractors, sign timesheets and provided constructive feedback.
Construction Manager - International Paper - Savannah, GA
(2021-01 - 2021-03)
- Collaborated with engineers, and subcontractors to determine project needs.
- Monitor and reported project progress on a daily basis.
- Obtain construction permits from local authorities.
- Ensure job site remains safe, clean and orderly.
- Supervise subcontractors, sign time sheets and provided constructive feedback.
Electrical Planner/Work Control– Nuclear (7300 Project) - Allied Power - Dresden – Morris, IL
(2020-10 - 2020-11)
- Prepared field walk-downs on the Turbine Driven Feed Water pump to prepare work packages.
- Utilized electrical drawings to identify electrical wiring & components before removal.
- Utilized ESOMs software to verify lockout tagout clearances with other organizations for compliance before entering into the field.
Electrical Planner/Work Control– Nuclear - Allied Power - Byron Nuclear – Byron, IL
(2020-09 - 2020-09)
Electrical Planner/Work Control– Nuclear - Allied Power - Braidwood – Braceville, IL
(2020-04 - 2020-04)
Engineering Procedure Writer - Remote II (Reactor Maintenance) - Nine Mile Nuclear
(2019-12 - 2020-03)