Site Inspector - FEMA (Federal Emergency Management Agency) - Columbia South Carolina
(2024-11 - 2026-01)
- Conducted site inspections on damages caused by Hurricane Helene of various facilities and utilities ensuring adherence to contract specifications and quality standard in South Carolina
- Drove to sites safely and met with applicants of FEMA's disaster funding and briefly discussed about the damages they have caused by hurricane Helene in the field
- Visually inspected the damages with the applicant's representative present in the field and took photographs with high-quality lens iPhone and measured dimensions with tape measures of the damages
- Filled out SIR (Site Inspection Reports) in the field and populate it on Grants Manager after completing site inspection
- Prepared FIRMETTE (Flood Map), Location Map, and Photo pages ensuring timely and accurate documentation then uploaded them on Grants Manager for access for FEMA staffs and the Applicants
Diagnostic Engineering Support Test Tech - Elbit systems of America - Fort Worth TX
(2020-02 - 2024-09)
- Tested various military aircraft electronic equipments such as IHDUs, DDUs, OPTICs YAMAB TOP ASSEMBLIEs, AMPC TOP ASSEMBELIEs, POWER SUPPLIEs using test procedure called ATP (Acceptance Test Procedure) after the units came out of assembly line
- Performed thermo test in chamber and vibe test in vibe room on all the units that passed ATP test to ensure the units still function properly under various weather conditions and atmospheric levels
- Printed test reports and attached them with test routers upon completion of ATP test. Also saved test log files on test drives to make them accessible to management
- Troubleshot circuit boards to board level when the units failed the 1st ATP test
- Conducted root cause analysis for recurring failures by defining the problems and collecting data and evidences
- Programed electronic circuit boards used to build the units such as CIOs, CPUs, IVMs using Generic loader software, Jig, and Jtag boxes
- Created Test files on FixureMagician based on customer's specifications and tested PCBs. Troubleshot them when they failed
- Measured voltage levels and signals across components using DMM and Oscilloscope
- On downtime, collected all the damaged electronic boards that were to be disposed from MRB department and tried to troubleshoot them by reading and interpreting complex schematics and layouts to reduce the cost of waste
Test Engineer - Siemens - Irving TX
(2019-03 - 2020-01)
- Installed updated software on computers at the beginning project cycle for automation testing
- Performed verification activities by running simple test cases in the labs to ensure that all the modules in the machine such as Lamps, Horns, Switches, Barcode readers, Verifier, Labelers, Sensors, and Cameras in AFSM 100 and DIOSS machines function properly
- Prepared various test decks for different test cases
- Replaced damaged power supplies of computer
- Ran volumes using various test decks and recoded data on quality center database
- Executed Test cases with minimal supervision and modified them while recording the bugs found on the software on Jira
Validation Engineering Support Tech - Texas Instrument - Dallas Texas
(2018-08 - 2019-02)
- Using Lab view, tested electro-static discharge protection devices for proper function
- Performed Transmission Line Measurement to understand the dynamic resistance and Voltage-current characteristics of the ESD protection devices under electro-static Discharge event
- Using industry-standard calibration tools, software, and methodologies, i calibrated oscilloscope, digital multimeter, power supplies, and capacitance meter before using them to test electronic devices such as diodes, amplifiers, and capacitors
- Using capacitance meter, measured the capacitance of the electro-static discharge protection devices at different output pins
- Recorded test and measurement data on spreadsheet