Millwright General Superintendent at CL Construction LLC (2023-01 – Present)
- Lead nine millwright crews on firm-fixed and time-and-material projects, ensuring on-time and on-budget completion.
- Travel to multiple job sites to oversee execution while maintaining strict safety and quality standards.
- Develop project plans, track progress, and report performance to senior leadership.
- Prepare change orders and review mechanical, electrical, and piping scopes for turbine and industrial projects.
- Oversee billing, submittals, and client reporting.
- Support fabrication, installation, and mechanical troubleshooting during outages and overhauls.
Millwright Journeyman Foreman at RCI (2021-01 – 2023-12)
- Supervised industrial machinery installation, maintenance, and major repairs.
- Installed and serviced wind turbine components including pitch cylinders, gearboxes, generators, and drives.
- Supported turbine construction, major component replacements, and GE rotor battery-to-capacitor upgrades.
- Diagnosed and repaired low-voltage electrical systems per GE standards.
- Performed preventive maintenance including lubrication, fluid changes, brush replacement, and alignment.
- Operated and installed mobile lifts inside towers, hoisted drives to nacelle and installed ladder lift systems.
- Repaired climb assist ropes using poly cable splicing, measured and repaired blade cracks with blade technicians.
- Maintained Siemens turbines including yaw drives and lubricated components; welded yaw gear teeth in-tower.
- Enforced safety and quality compliance across all crews.
Millwright Journeyman at Blattner Energy (2019-01 – 2021-12)
- Performed turbine inspections, troubleshooting, and repairs.
- Identified root causes of mechanical failures and supported corrective actions.
- Assisted with startup procedures for new wind facilities.
Millwright General Foreman at Chicago Bridge & Iron (2014-01 – 2019-12)
- Supervised GE Frame 7 gas turbine and turbine deck system installations.
- Coordinated multiple trades to meet aggressive project schedules.
- Planned manpower, material staging, and daily execution.
- Performed precision alignment and leveling to prevent premature equipment failure.
- Developed labor and material estimates for budgeting and project controls.
Millwright Technician at Mortenson Construction (2010-01 – 2014-12)
- Performed layout and assembly of rotor components and blades for ground-up turbine construction.
- Completed base, mid-section, and top-out stacking of GE turbine components.
- Reviewed punch lists and secured materials and hardware.
- Measured and reported blade cracks; tracked cranes and equipment between towers.