Skip to main content
Hx Mudayat

Hx Mudayat

Senior Piping Engineer

Talent
Rivers, NGMember since June 26, 2026
Piping DesignANSI B31.1ASTMNFPAIntergraph SP3DBechtel 3DMPDMSCaesar IIAutoCADMicroStationDocumentumProjectWiseMSOfficeMSProjectPiping Routing DesignCost EstimationOil and Gas ProductionPetrochemical PlantOil Refinery
·

Hire this person

Send a job offer directly to this candidate

Piping DesignANSI B31.1ASTMNFPAIntergraph SP3D

About

Experience as piping design engineer on Engineering, Construction, Maintenance for new construction projects and revamping of existing facilities.

Experience includes in Processing Plant, Oil and Gas production facilities both onshore and offshore, Oil Refinery, Petrochemical plant, Power plant and Pipeline. Familiar with American code and standard for piping design such as ANSI B31.1, B31.3, ASTM and NFPA.

Experience in leading staff and liaise with contractor / consultants. Significant in designing, planning, cost estimation and contractual aspects.

Experience

Sr. Piping Design Engineer at APRIL Group (2019-03 – 2025-10)

Several Power Plant projects

  • Turbine Generator #10 - 350 MW Steam Turbine Project (Siemens)
  • Turbine Generator #9 - 100 MW Steam Turbine Project (Dong Fang)
  • Turbine Generator #8 - Back Pressure Steam Turbine Project (MHI)
  • Preparation of woodchips conveyor design

Sr. Piping & Plant Engineer at Bechtel - PGESCo (2007-03 – 2017-01)

Several Power Plant projects

  • 250 MW New West Damietta Combined Cycle Add-On Power Plant, a Brownfield project with 4 HRSG and 1 unit of Steam Turbine with Air Cooled Condenser
  • 2x250 MW New Assiut Combined Cycle Add-On Power Plant with 2 modules, each ones have 4 HRSG and 1 unit of Steam Turbine with Air Cooled Condenser
  • 650 MW Suez Thermal Power Plant with 1 Boiler and 1 Steam Turbine
  • 2 x 650 MW El Ain El Sohkna Super Critical Thermal Power Plant with 2-unit Super Critical Boilers and 2 Steam Turbines
  • 2 x 350 MW Cairo West Thermal Power Plant, a Brownfield project with 2-unit Boilers and 2-unit Steam Turbines
  • 750 MW Nubaria III Combined Cycle Power Plant, a Brownfield project with 2-unit of Gas Turbines, 2-unit HRSG and 1-unit Steam Turbine

Sr. Piping Design Engineer at Pec-Tech (2004-05 – 2007-02)

LNG Train and Power Plant projects

  • FEED Bontang LNG Train
  • Sumatra Well Pad, Gas Processing Plant and Pipeline

Piping Engineer at Pec-Tech (2003-02 – 2004-05)

LNG Receiving Terminal and Power Plant projects

Project Engineer at Chulei Engineering Co (1999-01 – 1999-10)

Petrochemical project

Project Engineer at PT. Hamparan Rejeki (1991-01 – 1998-12)

Petrochemical project

  • 40.000 MTA Acrylic Fiber plant with Du-Pont technology

Senior Piping Engineer at PT. Rekayasa Industri (1990-01 – 1991-12)

Fertilizer project

Piping Designer at PT. Purna Bina Indonesia (1990-01 – 1990-12)

Petrochemical project

Sr. Piping Designer at Total Indonesie (1985-01 – 1989-12)

Oil and gas facilities projects

Education

Bachelor Degree in Mechanical Engineering – University of Balikpapan (1987-01)

Skills

Senior Piping Engineer

Reviews