Construction Manager, Chief Inspector, Utility and Welding Inspector
Send a job offer directly to this candidate
Excellent communication and leadership skills for safety, environmental and all aspects of the construction from start to finish. I have personally started at the bottom and worked my way to the top. No accidents under my leadership in 35 years due to my vast knowledge of construction.
Construction Manager Rig up Inspection - Detroit, Michigan
Construction Manager on a new booster pump piping install in an existing rack overhead for butane and propane supply for Plains All American in Detroit Michigan.
Self Employed Owner - Down to Earth Excavation and Utilities LLC
(2020-01 - 2025-01)
Commercial and residential projects doing demos, excavations and utilities. Projects included townhomes, apartments, daycares, fast food, parts stores, subdivisions.
Construction Manager - Gulf Interstate Inspection - Burleson, Texas / North Dakota
(2019-01 - 2020-01)
Construction manager on new amine units from conception to delivery for Enable Midstream. Contractor built the units in a shop in Burleson Tx then we shipped them to North Dakota and done install and turnovers.
Chief Inspector - Tulsa Inspection - South Texas
(2018-01 - 2019-01)
Chief Inspector on a new 100 mile 30-inch pipeline in south Tx for Phillips 66 Grey Oak Line. I had 100 inspectors working under me 175 contractor employees.
Chief Inspector - Avery Inspection - Union town, Pennsylvania
(2017-01 - 2018-01)
Chief Inspector for Tenaska Energy on a new 10 mile 20-inch gas pipeline supplying a nuclear power plant in Union town PA I had 3 inspectors and 100 contract employees.
Pipeline Superintendent - WHC Pipeline - Rankin, Texas
(2019-01 - 2020-01)
Constructed 120 miles of oil gathering system and 50 well connects in Rankin Tx for EnLink Midstream had around 135 employees on that project.
Chief Inspector - Tulsa Inspection
(2019-01 - 2019-01)
Chief Inspector for El Dorado Chemical on 10 miles of new 20 – inch pipeline tying into a 30-inch Trans Union line with a hot tap and two-meter stations. I had 8 inspectors and 80 contractor employees.
Chief Inspector - Avery Inspection - Ishpeming, Michigan
(2018-01 - 2018-01)
Chief Inspector on a new 10-mile Northern Natural Gas pipeline supplying the largest iron ore mine in north America in Ishpeming Michigan I had 8 inspectors and 150 contract employees.
Chief inspector - Avery Inspection - Lincoln, Nebraska
(2017-01 - 2017-01)
Chief Inspector on a Northern Natural Gas line rehabbing 50 miles of gas pipeline while still in use in Lincoln Nebraska using stopples, I had 7 inspectors and 125 contractor employees.
Welding Inspector - Tulsa Inspection - Oakley, Kansas
(2016-01 - 2017-01)
Welding Inspector on bore sections and tie ins for Magellan Midstream on a 20-inch 100-mile Saddle Horn Project in Oakley Kansas.
Right of Way Consultant - EMS Inspection - Williston, North Dakota to Canada
(2015-01 - 2015-01)
Duties were to find the best route for 240 miles of new 20- inch pipeline construction from Williston North Dakota to Canada I had 4 survey crews under me.
Pipeline Superintendent - Two Rivers Pipeline - Southern Oklahoma to Wichita Falls, Texas
(2014-01 - 2015-01)
Pipeline Superintendent on 100 miles of new 16 – inch for One Oak from southern Ok to Wichita Falls Tx, had around 200 employees under me.
Chief Inspector - Tulsa Inspection - Eastern Oklahoma
(2014-01 - 2014-01)
Chief Inspector over 50 miles of integrity digs for Explorer Pipeline installing clock springs and weld on sleeves depending on the metal loss on a 28 -inch in service line in Eastern Ok. I had 4 inspectors and 30 contract employees.
Chief Inspector - Furmanite Inspection - Abilene, Texas to Goldthwaite, Texas
(2013-01 - 2014-01)
Chief Inspector on a new 100 miles of 20 – inch pipeline for Magellan Midstream on the Bridge Tex Pipeline from Abilene Tx to Goldthwaite Tx had 90 inspectors and 180 contract employees.
Pipeline Superintendent - Dimension Energy - Panhandle, Texas
(2013-01 - 2013-01)
Pipeline Superintendent over all the foreman and crews installing pipelines for Jones Energy Midstream in the Pan handle of Tx.
Chief Inspector - Tulsa Inspection - Kingfisher, Oklahoma to Baytown, Texas
(2012-01 - 2013-01)
Chief Inspector on 100 miles of new 16 -inch pipeline for DCP Midstream from Kingfisher Ok to Shawnee Ok finished that then done rehab on 600 miles of various size pipes from Shawnee Ok to Baytown Tx converting an existing system from oil to LNG.Entire line was cleaned and rehydroed then filled with nitrogen. I had a total of 100 inspectors all together and 300 contract employees.
General Superintendent - Barrilleaux Inc. - Texas
(2010-01 - 2012-01)
General Superintendent over all the Superintendents and work all over Texas on new and old pipelines. Had around 10 Superintendents and around 450 employees. We installed carbon steel lines, poly lines, fiber spar for over 20 different gas companies. We also built compressor stations and pump stations.
Pipeline Superintendent - Select Energy
(2010-01 - 2010-01)
Pipeline Superintendent on a reconstruction of a 42 launcher and receiver that was installed in the wrong place. We cut it a apart and put it back together in the right place had 30 employees.
Utility Inspector - McDaniels Consultants - Louisiana to Maypearl, Texas
(2009-01 - 2010-01)
Utility Inspector for Energy transfer on the Texas Independent Project 174 miles of new 42 – inch pipeline from western Louisiana to Maypearl Tx I inspected over all of the row cutting clearing backfill and cleanup.
Utility Inspector - Applied Consultants - Louisiana
(2008-01 - 2008-01)
Utility Inspector for Cheasapeake Energy all over Louisiana I inspected over clearing row ditching bending stringing lowering in backfill ditching bolt up cleanup done a little bit of everything.
Operator / Foreman / Supervisor - Multiple contractors
(1995-01 - 2008-01)
I worked for several contractors as an operator moving from job to job then moving to foreman and then to a supervisor. During this time I learned every aspect of the jobs from start to finish once I became a supervisor.
Labor hand / Operator / Equipment operator - Lone Star Gas
(1990-01 - 1995-01)
Started out as a labor hand installing steel and poly lines to rural communities and commercial businesses. I done everything as a laborer from putting poly together to spacing, bores, doping and tapping pipe to testing, stringing bolt up lowering in tie ins bending etc than moved up to an operator digging ditch digging live lines lowering in pipe tie ins etc .After that I learned how to run a dozer. Blade, backhoe, side boom etc doing clearing ,row ,cleanup.