
Kris Pierozek
Maintenance & Automation Technician | PLC | Hydraulic & Electric Systems
Hire this person
Send a job offer directly to this candidate
About
Results-driven Maintenance/Automation Technician with 25+ years diagnosing and repairing hydraulic, electrical, and electronic systems including PLCs, Arburg injection molding machines, and Fanuc/Sepro robots. Proven track record improving production flow, quality, and equipment uptime in high-volume manufacturing environments.
Experience
Maintenance/automation technician - Thermo Fisher Scientific - Petaluma, CA
(2015-03 - 2022-06)
- Diagnosed and resolved complex faults on Arburg hydraulic and electric injection molding machines, minimizing unplanned downtime
- Monitored Fanuc robot performance and programmed teach positions to maintain precise, consistent production cycles
- Executed equipment calibrations and authored detailed SOPs to ensure compliance with blueprint and quality standards
Industrial Maintenance Technician - Scientific Specialties - Lodi, CA
(2005-05 - 2013-05)
Maintenance / Projects
- Troubleshot Arburg injection molding machines and Sepro robots, maintaining high OEE across multi-shift production
- Performed quarterly calibrations and maintained detailed written procedures aligned with engineering specifications
- Collaborated with international engineering teams to resolve quality issues and ensure purchase order and blueprint compliance
Technician - Synagro - Elk Grove, CA
(2004 - 2005)
Set up, maintain, troubleshoot and repair complex mechanical and electrical equipment.
- Maintained and monitored industrial equipment, performing preventive and corrective maintenance to sustain operational continuity
Technician - Pechiney Cork and Seal - American Canyon, CA
(2002 - 2004)
Set up, maintain, diagnose, and repair complex mechanical, electrical equipment to ensure uninterrupted production.
- Supervised 4 production technicians, monitored equipment health, managed client interfacing, and oversaw screen printing and color matching operations
Packaging Department Technician - JVC Disc America Company - Elk Grove, CA
(1997 - 2002)
Independently set up, maintain, diagnose, and repair complex mechanical, electrical, and electronic equipment to ensure uninterrupted factory production.
- Maintained, set up, and repaired packaging machinery; coordinated with departments and contractors to maximize equipment uptime and accurate recordkeeping
High Speed Machine Technician - Stuart Hall - Woodland, CA
(1993 - 1998)
Set up new equipment and made adjustments as required.
- Diagnosed faults and performed proactive monitoring on high-speed production machines to prevent unplanned stoppages
Group Lead Technician - Westvaco - Emeryville, CA
(1994 - 1996)
Set up new equipment and made adjustments as required. Analyzed and diagnosed problems.
- Led technician group overseeing equipment maintenance, cross-departmental coordination, and adherence to detailed service procedures
High Speed Machine Technician - International Billing System - El Dorado Hills, CA
(1993 - 1994)
- Analyzed and diagnosed high-speed machine faults, taking corrective action to sustain production performance
Machine Technician - Quality Parks Products - Sacramento, CA
(1983 - 1989)
- Set up and maintained production machinery, diagnosing issues and performing adjustments to ensure consistent equipment operation
Education
Associate's degree - Mechanical Engineering - Liceum Mechaniczne (1977-05 - 1981-06)

