Superintendent/Safety Manager
(2022-10)
Collaborated with the Superintendent to plan, organize, and manage all aspects of construction projects, ensuring they are completed on time and within budget.
- Conducted regular site inspections to monitor progress, quality, and safety compliance, taking corrective actions when necessary.
- Assisted in the coordination of subcontractors, vendors, and suppliers, ensuring seamless workflow.
- Helped in the preparation of project schedules, including Gantt charts and critical path analyses, to optimize project timelines.
- Implemented and enforced safety protocols, resulting in [X%] reduction in on-site incidents.
- Coordinated with project managers, architects, and engineers to resolve design issues and ensure project specifications are met.
- Managed and maintained project documentation, including plans, permits, and daily logs.
- Conducted regular meetings with on-site teams to communicate project goals, expectations, and address any concerns.
Contractor - Maximus Construction
(2021-01 - 2022-09)
Safety Manager/Quality Control Inspector - Maximus Construction
(2017 - 2020-12)
Assisted the Field Office Engineer in setting up the project job site and coordinated various construction and quality control activities.
- Conducted re-bar inspections
- Concrete Inspections
- Ordering Material
- Daily Safety Inspections
- Toolbox Safety Meetings
- Risk Review with Insurance Carrier
- Assisted with the Site and Safety Signage plan and installation
- Helped coordinate the site fencing location and installation, assisted with the setting up of the construction trailer
- Assisted with the setting up of the project files i.e. RFI Binders/Submittal Log Binders/MSDS Binders/Safety Binders/Assisted with setting up the Project Record Set Contract Drawings and Specifications
- Assisted the Field Office Engineer and Project Manager with logging RFI's and construction submittals
- Update the Field Office Drawings weekly as As-Built documents
- Assisted the Project Engineer and Project Manager in taking meeting minutes for the project
- Assist the Project Superintendent with the Daily Reports
- Performed daily site inspections for the project team
- Placed the subcontractors on Notice if a violation occurred
- Assisted with tracking all field deficiencies and made sure they were corrected
- Assisted the Project Engineer with processing the projects paperwork
- Assisted the Project Manager with updating the project schedule and transmitting that information to the subcontractors, assisted the project team with material deliveries
- Performed daily safety inspections for the project team
- Assisted with tracking quantities
Assistant Quality Control Inspector/Safety Coordinator - H.J. RusselL
(2012 - 2016)
- Safety - Job hazard analysis
- Toolbox Safety Meeting
- Daily Safety Reporting
- Project Site Inspection
- Assisted the Field Office Engineer in setting up the project job site
- Assisted with the Site Logistic Plan
- Assisted with the Site and Safety Signage plan and installation
- Helped coordinate the site fencing location and installation, assisted with the setting up of the construction trailer
- Assisted with the setting up of the project files i.e. RFI Binders/Submittal Log Binders/MSDS Binders/Safety Binders/Assisted with setting up the Project Record Set Contract Drawings and Specifications
- Assisted with setting up the Certificate of Insurance Binder
- Assisted with setting up the QA/QC Checklist in PlanGrid
- Assisted with setting up the Project Management program for the project. (i.e. entering in the subcontractor's information into the system
- Assisted the Field Office Engineer and Project Manager with logging RFI's and construction submittals
- Update the Field Office Drawings weekly as As-Built documents
- Assisted the Project Engineer and Project Manager in taking meeting minutes for the project
- Assist the Project Superintendent with the Daily Reports
- Performed daily site inspections for the project team
- Placed the subcontractors on Notice if a violation occurred
- Assisted with tracking all field deficiencies and made sure they were corrected
- Assisted the Project Engineer with processing the projects paperwork
- Assisted the project manager with updating the project schedule and transmitting that information to the subcontractors, assisted the project team with material deliveries
- Performed daily safety inspections for the project team
- Assisted with tracking concrete quantities during scheduled concrete pours
- Assisted with helping to track unsuitable soil removal and the hauling in of good dirt
- Assisted with creating the project Punch List in PlanGrid
- Performed daily inspection of punch list completion
- Assisted with the collection of the project close out documents
- Assisted with completing the project Record Set of as-built drawing
- Assisted the project team in de-mobilizes from the project site.