Senior Project Engineer at Barry-Wehmiller Design Group (2022-08 – Present)
- Supported diverse North America regional initiatives in the beverage sector, including safety upgrades, R&D advancements, and construction projects with budgets ranging from $1m to $15m.
- Coordinated and supervised onsite equipment demolitions, installations, CQVs, and startups for a new beverage rollout, managing an $11m project across six plants in the North America region and increasing line efficiency by over 10% on each line.
- Facilitated deployment of new equipment to enhance performance efficiency, spanning depalletizers, blowmolders, fillers, labelers, sterilizers, conveyors, packers, and palletizers.
- Provided project management services for bid processes, including RFQs/RFPs, SOWs, AutoCAD design, project scheduling, bid comparisons, and financial tracking.
- Evaluated equipment reliability and safety compliance through site-specific audits, providing thorough reports, JSAs, and recommendations for improvements ranging from guardings, sensors, and controls.
- Collaborated with engineering teams, OEMs, subcontractors, and plant personnel to drive end-to-end project execution with minimal production downtime while maintaining post-project feedback.
- Supervised work sites for facility and construction projects, managing subcontractors and building client relationships.
Regional North America Project Engineer at Procter & Gamble (2020-06 – 2022-07)
- Coordinated a project solution to recycle scrap raw material by 3% in order to generate $1.3m in cost savings per year and reduce overall environmental waste.
- Launched a new cost savings project to extend the life of equipment while saving the company a combined ~$37k & 40 effort hours per converting line each year (up to 40 lines across NA).
- Managed a $1.5m project to add machines onsite resulting in better dust control and safer health environments, while also enabling the reuse of a plastic waste product and further generating $200k in revenue each year.
- Supported the complete reconstruction of 6 lines, over $10m capital each, to meet production needs by managing various contractors and equipment vendors for site clearance, inspection, and installation throughout the project lifecycles.
- Researched and designed a new North America 'Offline' version management strategy on Siemens TeamCenter (PLM system) for 24 systems across the region.
- Communicated as the global department SPOC for the business unit and managed 3 manufacturing sites across North America (supporting 40 converting lines).
Self-Employed E-Commerce Reseller at eBay (2019-10 – 2021-02)
- Effectively built and managed a consistent 300+ inventory online store, from no prior experience.
- Achieved Top-Rated Seller status within 90 days (requiring over both 100 transactions and $1,000 in sales per month).
- Produced $3k-6k in sales per month, meeting a minimum of 300% ROI with 100% positive customer feedback.
- Established a returning consumer base by ensuring constant customer satisfaction through reviews, direct messaging, and brand marketing.