Sobia Awan
Electrical Engineer
Talent
Jersey City, City of Jersey City, HudsonMember since August 5, 2023
·
Hire this person
Send a job offer directly to this candidate
About
I am a meticulous, innovative, self-driven electrical engineer with 19+ years of experience as a Project Manager, Control and Electrical Engineer, Scrum Master and Laboratory Instructor. Worked with teams onsite and remotely. Skilled professional, currently seeking further challenges in large-scale projects.
Being a self-motivated, analytical, detail-oriented professional, my eagerness to develop new skills in line with industry best practices with in-depth knowledge of Electrical Engineering is honed from a strong academic foundation and progressive experience. My abilities are well-calibrated for developing and implementing systems for the improvement of operational processes.
Experience
Assistant Project Manager at BMTECH Group, Remote
September 2019 — May 2023- Managed projects, including budgeting, planning, implementation, maintenance, administration, staffing and logistics.
- Provided overall program leadership and support for concurrent agile projects across multiple disciplines to implement operational processes and teamwork instructions.
- Team development by work optimisation, assisting at various levels of the project, and task analysis.
- Evaluating the data collected by the project development team and preparing requirement specifications, interfacing between the clients, development and support teams.
- Meeting customer and project objectives by developing and leading project execution within the Agile program.
- Excellent risk assessment and cross-cultural team management skills.
Project Lead at McCormick & Company Inc – Irving, TX
July 2014 — January 2017- Led the successful execution of the new Pack and Half and centralize palletizer project, overseeing multiple production lines and managing project budgets exceeding $5M, resulting in increased efficiency and production cost savings of 15%.
- Project Champion for automated drain valve on extract line to meet compliance with environment and health for county.
- Played pivotal role in the procurement process by leading vendor evaluation, contract negotiation and timely delivery of equipment, contributing to a 20% reduction in procurement lead time.
- Resolved conflicts by collaborating closely with the team/stakeholders by various team-building activities, building trust, encouraging constructive feedback and problem solving.
- Provided management support for all production lines and controlled & manage resources for requested jobs within allocated budgets.
- Implemented data collection systems (TrakSys/ParSec) for all lines to drive future projects, as well as providing data to process engineers to drive continuous improvement projects.
CONTROL ENGINEER at McCormick & Company Inc – Irving, TX
January 2010 — June 2014- Responsible for the engineering, design, integration, programming and troubleshooting of programmable logic/automation controller [PLC/PAC], logic programming, human-machine interfaces [HMIs], wiring schematics, power systems, instrumentation, motor-control systems, servo systems, robotics, and industrial networks to support productivity and quality improvements for process and packaging equipment.
- Supported packaging and facilities engineers as well as individually lead capital projects, ensuring accuracy and completeness of associated technical documentation and support technician training and development processes.
- Executed project plans and schedules, evaluated project status and resource utilisation and implemented changes to improve the team’s effectiveness.
- Created training guides one-point lessons (OPL) for electricians and for operators.
- Attended Daily Direction Meetings (DDS) to align work/priority to the plant needs.
ELECTRICAL ENGINEER at Kimberly Clark Corporation – Paris, TX
June 2008 — July 2009- Led efforts to define overall objectives and provided technical, analytical, and engineering support to plant process.
- Administered the design and implementation of efficient work systems and provided first-rate assistance in improving existing manufacturing processes.
- Developed and optimised manufacturing processes in a manner that met safety, quality, and operational performance expectations, effectively interfaced with a broad range of team members.
- Worked closely with the maintenance and production departments to implement appropriate project installation schedules, thus diminishing shortcomings, and maximising productivity and use of manpower.
- Introduced new innovative software for Paris plant assets to upgrade splice diameter with machine speed and to reduce the other waste costs by 20% equivalent to $364K monthly savings.
AUTOMATIC CONTROL SYSTEMS LAB INSTRUCTOR at Louisiana Tech University – Ruston, LA
September 2007 — December 2007WEB DESIGNER/CTECH CLERICAL STAFF at Louisiana Tech University - Ruston, LA
September 2004 — May 2006- Program inventory updates for civil and chemical engineering departments, maintenance, processing and filling vehicle log sheets for COES, updating, designed and maintained web pages.