Seasoned Construction Manager with 35+ years in pipeline and heavy earthmoving across the US. Embedded with SDG&E's PSEP, GTTS, and GTSR programs, delivering projects on-time, on-budget with zero-compromise safety standards.
Experience
Construction Manager - E/2 Consulting Engineers, Inc. - Los Angeles, CA
(2019-10)
SDG&E / PSEP- GTSR - GTTS Construction Manager, L-1600, L-3012, L-3010, Rainbow PLS, OPM installation San Diego, CA – SDG&E
- Manage contractors across all pipeline construction phases for SDG&E's PSEP, GTTS, and GTSR programs since 2019
- Drive milestone completion on-schedule and on-budget while maintaining rigorous safety compliance on every project
- Control overtime costs and field resources across multiple concurrent scopes as contracted Construction Manager
Superintendent - PG&E Michels Pipeline, Inc. - Elk Grove, CA
(2019-06 - 2019-10)
6 miles 12" L-109 Union City, CA – PG&E
- Supervised pipeline construction crews for PG&E program work, ensuring compliance with safety and quality standards
- Coordinated subcontractors, equipment, and materials to meet aggressive project schedules with minimal overtime
- Delivered scope on-time during short-term critical assignment supporting Michels Pipeline operations
Superintendent - Henkels & McCoy, Inc. - Chino, CA
(2017-06 - 2019-06)
SoCal Gas / SDG&E - PSEP
- Led installation of 6 miles of 24" pipeline (L 8123, Bakersfield, CA) for So Cal Gas as Superintendent
- Superintended 6.5 miles of 16" pipeline (49-17, San Diego, CA) for SDG&E, meeting all key milestones
- Managed multi-crew field operations across two major utility clients, controlling costs and enforcing safety protocols
Assistant Superintendent - Henkels & McCoy, Inc. - Chino, CA
(2017-06 - 2019-06)
SoCal Gas / SDG&E - PSEP
- Supported construction of 100-mile 30" L 3000 pipeline (Essex, CA) for So Cal Gas as Assistant Superintendent
Assistant Superintendent - Snelson Companies, Inc. - Sedro-Woolley, WA
(2012-11 - 2017-06)
PSEP SoCal Gas / PG&E
- Assisted superintendent on five SoCal Gas and PG&E pipeline projects (10"–34", Hanford to Bakersfield, CA)
Foreman - Snelson Companies, Inc. - Sedro-Woolley, WA
(2012-11 - 2017-06)
PSEP SoCal Gas / PG&E
- Foreman on four PG&E and SoCal Gas pipeline projects totaling 23+ miles of 10"–24" pipe across Central CA
Foreman - Redwood City, CA
(2015-01 - 2015-02)
PG&E 300A Line Replacement Underground Pipeline – 6 miles 24" Pipeline Replacement
- Short-term Foreman assignment supporting pipeline field operations
Assistant Superintendent - Rockford Corporation - Lakeview, OR
(2010-06 - 2010-12)
Ruby Line – 100 Mile 42" Pipe
- Assisted superintendent on pipeline and heavy civil scopes for Rockford Corporation
Construction Manager - Ascot Flowlines LTD - Port Harcourt, Nigeria
(2009-03 - 2010-03)
Domestic Gas Supply Project – EGP3A, Agip 6" Flow Line Project, MPN, CNL, NAOC, Supervision onshore construction activities, Marine and Dredging Operation
- Managed pipeline construction operations for Ascot Flowlines LTD as Construction Manager
Operator - Rockford Corporation - Buckeye, AZ
(2008-06 - 2009-02)
TransWestern Phoenix Expansion – Road Bore & Tie-ins, Clean-up. Operated equipment on a 144-mile, 36-inch pipeline project.
- Operated heavy equipment on pipeline projects for Rockford Corporation
Operator - Associated Pipeline Contractors, Inc. - Rayville, LA
(2008-06 - 2009-02)
Gulf South, Texas to Mississippi Expansion - Spread 3 – Road Bore & Clean-up. Operated equipment on a 58-mile, 42-inch pipeline project.
- Operated heavy equipment supporting pipeline construction for Associated Pipeline Contractors, Inc.
Operator - Associated Pipeline Contractors, Inc. - Richland, MS
(2008-06 - 2009-02)
Gulf South, Southeast Expansion - Spread 1 – Right-of-way & Road Bore. Operated equipment on a 38-mile, 42-inch pipeline project.
- Operated heavy equipment supporting pipeline construction for Associated Pipeline Contractors, Inc.
Operator - Associated Pipeline Contractors, Inc. - Sydney, NE
(2008-06 - 2009-02)
Rockies Express West Pipeline - Spread 1 – Right-of-way & Road Bore. Operated equipment on a 120-mile, 42-inch pipeline project.
- Operated heavy equipment supporting pipeline construction for Associated Pipeline Contractors, Inc.
Operator - H.C. Price Co. - Byron Center, MI
(2008-06 - 2009-02)
Michigan PG&E Expansion – Right-of-way & Clean-up. Operated equipment on an 11-mile, 24-inch pipeline project.
- Operated heavy equipment on pipeline projects for H.C. Price Co.
Operator - MasTec Services Co., Inc. - Coos County, OR
(2008-06 - 2009-02)
Oregon PG&E, Coos Bay - Roseburg Expansion – Right-of-way & Tie-ins. Operated equipment on a 60-mile, 12-inch pipeline.
- Operated heavy equipment on pipeline and utility projects for MasTec Services Co., Inc.
Operator - Associated Pipeline Contractors, Inc. - St. George, UT
(2008-06 - 2009-02)
Kern River Gas Transmission Company – Spread 6, 8 and 9 – Main Line Ditch & Clean-up. Operated equipment on a 64-mile 36-inch pipeline.
- Operated heavy equipment supporting pipeline construction for Associated Pipeline Contractors, Inc.
Operator - Kiewit Pacific Co.
(2008-06 - 2009-02)
Pine Tree Wind Project – Mass Excavation & Embankment. Operated equipment on a 23-mile, 1.6-million-yard project consisting of pre-job road improvements, site location of an electrical substation, pads for 80 wind turbines, and earth moving for access roads.
- Operated heavy equipment on civil and pipeline projects for Kiewit Pacific Co.
Operator - West Coast Rail Constructors
(2008-06 - 2009-02)
Sprinter Rail – New Installation of Commuter Rail
- Operated heavy equipment supporting rail and civil construction for West Coast Rail Constructors
Foreman - Coffman Specialties
(2008-06 - 2009-02)
California State Route 7 Build – Grade and Embankment
- Led field crews as Foreman on construction projects for Coffman Specialties
Foreman - Kiewit Pacific Co.
(2008-06 - 2009-02)
Level 3 Project, San Diego to Yuma, and Victorville to Primm – Fiber Optic Conduit Installation
- Led field crews as Foreman on heavy civil and pipeline projects for Kiewit Pacific Co.
Foreman - Errecca's, Inc.
(2008-06 - 2009-02)
State Route 125 – Grade and Embankment
- Led field crews as Foreman on pipeline and excavation projects for Errecca's, Inc.