Acting Chief Operations Officer at Manufacturing Operations (2025-11 – 2026-03)
- Led three manufacturing plants: two cable manufacturing plants and one conduit pipe manufacturing plant; responsible for 575 employees through 12 direct-report managers.
- Drove alignment across manufacturing, engineering, maintenance, quality and operational performance.
- Supported achievement of a record R300 million plant turnover for the month of October.
- Reason for leaving: Resignation.
General Manager at South Ocean Electrical Wire (2024-01 – 2025-12)
- Created Planning, Scrap/Waste Management and Stores departments, developing SOPs and controls to make each function operational.
- Improved machine run time from 50% to 65% and contributed to the company's first annual turnover of R3 billion.
- Implemented short-interval production controls requiring four-hourly output-versus-target reporting by team leaders and managers.
- Designed practical factory-floor KPIs using real production figures to make performance simple, visible and actionable.
- Used value stream mapping to understand capacity and constraints, redesign layouts, optimise product flow and establish realistic production targets.
Process Engineering Manager at CBI-African Cables (2022-01 – 2024-12)
- Led process engineering, production improvement and major equipment projects.
- Successfully installed and commissioned a Conform line with the engineering team.
- Travelled internationally to identify and purchase manufacturing machinery, then led installation, commissioning and operator training.
Manufacturing Manager / Production Manager (Airdac) / Senior Process Engineer at Aberdare Cables (2008-01 – 2021-12)
- Progressed through senior engineering, production and manufacturing leadership roles; became the youngest and first Black Manufacturing Manager in Aberdare Cables' history.
- Improved machine run time from 50% to 83%.
- Reduced copper scrap from 12% to 3.5%, saving at least R2 million per month.
- Designed, trialled and industrialised solar cables, Saferdac cables and other products.
- Led factory layout design and the relocation, installation and commissioning of 500+ machines during the 2012 factory relocation.
- Redesigned factory layouts using value stream mapping and capacity analysis to improve production flow and optimise manufacturing efficiency.
- Implemented Green Stage Testing and an SOP for early defect detection, reducing customer complaints to almost zero.
Process Engineer / Electronics Technician Trainee at Aberdare Cables (2003-01 – 2008-12)
- Built a strong technical foundation in cable manufacturing equipment, process optimisation, machine settings, breakdown response and electrical systems; progressed into process engineering responsibility.