Carpentry - Robertson & Caine
(2008-01 - 2021-12)
- Final assembly consisted of; saloon installation of settees, galley lockers, saloon table, cielings, floors and saloon galley door.
- Primary assembly consist of; hull leveling, installation of coalition bulkhead and main bulkhead.
- Installing of cabin liners, saloon liner, owner cabin study liner, cabin cielings.
- Bonding of deck to hull, bonding of fly bridge.
- Riggging - hull, deck, fly bridge , cabin liners , bulkheads , cieling liners .
- Knowledge of laminating and finishing ( fibre glass )
Carpentry - Phoenix Marine
(2021-01 - 2022-12)
- Built in cabins, hillside panels, cieling installation, bunk draw fronts, cupboards, installation of hatches and hatch trims.
- Heads consist of ; shower panels, basin cupboard, installation of corient top, installation of cabin floors.
Boat building and camper trailer - Mavericks Yacht
(2022-01 - 2023-12)
- Build trailers
- Composite resin infused bulkhead
- Bonding of side bulkhead
- Cut foam panels to size and install foam panels
- As well as do the layout of a camper
Carpentry - Two Ocean Marine
(2023-01 - 2026-12)
- Built in cabins, hillside panels, ceiling installation, bunk draw fronts, cupboards, installation of hatches and hatch trims.
- Heads consist of ; shower panels, basin cupboard, installation of corient top, installation of cabin floors.