RIGGER at ZONKE ENGINEERING (2024-02 – 2024-04)
- Removing and Installing Vessel's components such as Trays, Full-moons & Half Moons and Bubble Caps.
- Installing Rubber-Shooters, Rope Ladders and Retractable Life-Lines.
- (Shutdown End of Contract)
RIGGER at STEFFANUTE & STOCKS (2024-08 – 2024-09)
- Machinary moving, Assemble Hydraulic Lifting Jacks and steering set guidance Hydraulic Jacking system for shell tank strikes.
- Lifting and Installing Structure, Steer-Cases, Cat-Ladders, Cable Racks, Piping, Flairs, Crettings, Spool Pieces, Carbon Steel Tank-Plates, Vapourizer, Rafftoughs, Nozzels, Steffena-Rings, Mono-Rails and Channel Support Beams Using Mobile Cranes and Tower Crane.
- (Shutdown End of Contract)
RIGGER at PRO-RIG (2024-10 – 2024-12)
- Working through out Confined Space inside the Boiler. Using Floating Technique of Chainblocks and Come-Alongs to Remove and Install Splitter Box's, Butterfly Valve's, PF-Piping, Banners, Small Boew Piping, Structure, Elements, Threads Rods Supports, Beam Supports and PF-Pipe Clamps.
- (Mini-Project End of Contract)
RIGGER at C&F Rigging (2025-01 – 2025-03)
- Removing Damaged/Disfunction plant equipment for Repairs and Collaborating Transporting equipments to Workshop and Wash-Bay.
- Installing and Removing Scrubbers, Motors, Conveyor Belts, Valves, Pumps, Re-Boilers, Flairs, Tube-Bundles & Tube Components, Piping, Structure and Compressor Ring Components.
- (Shutdown End of Contract)
RIGGER at PRO-RIG (2025-03 – 2025-04)
- Removing and Installing various kind of Valve's such as XV, RV, PSV, Instrument, Butterfly and Gate Valve's, Pumps, Accumulators, Steek, Motors, Spool Pieces, Compressor Ring Components and Tube Bundles & Tube Components using Mobile Cranes and Chainblocks to Float plant equipment where Mobile Cranes don't have Access or can't reach.
- (Shutdown End of Contract)
RIGGER at PROMMAC (2025-09 – 2025-09)
- Removing and installing Piping, Motors, Bello, Spool Pieces, Flanges, Figure 8, Cartridge, Doughnut, Tube-Bundles & Tube-Components such as Doome's, Doome Covers, Tube Shell, Water-Box's, Heat-Exchange and Various kind of Valve's such as XV, RV, PSV, Instrument, Butterfly and Gate Valve's.
- Using Tandem Lifting Technique to lift and turn Heavy loads From Horrizontal to Vertical Position with Two Cranes To Remove and Install Silo's, Vessel's, Flairs and Re-Boilers.
- (Shutdown End of Contract)
RIGGER at PROMMAC (2026-04 – 2026-05)
- Securing Outlet and Pipe-Line with Chainblocks, Come-Alongs and Slings.
- Removing and Installing Doughnut, Piping, Blanks, Valve's, Reactor Components, Tube-Bundles and Tube Components using Overhead-Crane/Hoist
- Lifting and Filling Catalyst inside the Reactor/Vessel using Mobile Crane.
- (Breakdown End of Contract)
RIGGER at DNX CONSTRUCTION & GENERAL TRADING (2026-05 – 2026-06)
- Removing and Installing Piping, Structure and Piping Support using Hand Powered tool devices and Overhead Cranes.
- (Shutdown End of Contract)
Project - Nitrogen Gas Tank Storage at Steffanute Stocks (2022-11 – 2024-06)
The project Entailed the Construction of a new 8 800m³ ( 6 000Ton) for Ammonia and all associated balance of plant.
- The Tank Construction method via a hook and grab Jacking system, in-house Custom Designed Transportation System Allowed the plates for both the outer and inner tank shell to be slide into position horizontal, Roof Tank Weight it was approximately 374Ton we used 750Ton Crawler Crane to Lift and Install Tank Roof.
- Lifting and Installing Structure, Piping, Electrical Plant Equipment, Tank Plates, Valve's, Flairs, Vapourizer, Silos, Nozzles and other various construction components Using Tower Crane, Mobile Cranes and Floating Technique of Hand Powered tool device to Install Plant Components.