Electrical & Instrument Construction Supervisor - Mpact Mkhondo Operations
(2024-08 - 2025-07)
- Installation of cable racks, Junction boxes, instrument stands and instruments
- Attend daily progress meetings
- Manage materials used to complete all E&I tasks
- Daily progress updates to Site Manager
- Materials management
- Updates daily tracker
Electrical & Instrument Supervisor - Pro Go
(2024-07 - 2024-08)
- Manage team for Annual maintenance shutdown at NCP
- Attend daily progress meetings
- Manage materials used to complete all E&I tasks
- Daily progress updates to Site Manager
- Materials management
- Updates client's daily tracker
Site Construction Supervisor - Industrial Control & Automation
(2024-01 - 2024-06)
- Installation of cable racks, Junction boxes, instrument stands and instruments
- Attend daily progress meetings
- Manage materials used to complete all E&I tasks
- Daily progress updates to Site Manager
- Materials management
- Updates client's daily tracker
Supervisor - Electrician - Aurex Constructors
(2023-07 - 2023-08)
Workshop Manager - Unilecsa
(2019-11 - 2022-04)
- Ensure minimum quantity stock is available for Panel Layout
- Attend weekly progress meetings
- Ensure all Drawings/Schematics are correct and liaise with Drawings Department
- Follow up on materials for Projects
- Ensure artisans (Electrical & Mechanical) understand the job at hand
- Issue job cards to artisans
- Ensure the highest of quality on all workmanship
- Ensure FACTORY ACCEPTANCE TEST (FAT) is carried out on all Panels before it leaves the workshop
- Plan all works to achieve milestones
Instrumentation Supervisor - ICA – Industrial Control & Automation (HOSAF Fibres Expansion Project)
(2017-07 - 2017-11)
- Installation of cable racks and junction boxes
- Assist with planning of resources for specific tasks during construction
- Job preparation and pre-checks to ensure all materials are available and all required tools and equipment are available for both subcontracted and Self Performance erection works
- Ensure that all tasks as per milestone are accomplished within schedule
- Organize site/places of work, so that work is carried out to the required standards with minimum risk to employees, equipment, and materials
- Ensure that all work which requires completion is recorded on interface schedules or punch lists
- Prepare inspection completion report, drawings and red mark
- Ensure that Design Change on the plant are maintained
- Completes punch list walk downs, identify punch list items and monitor punch list status
- Updates punch list work database with punch list item information as necessary
- Supervise modification/repairs arising during commissioning activities
- Hold daily progress meeting to ensure milestones are met
- Report and compile daily updates to Management
- Create spreadsheets for scope of work
Erection Supervisor - Alstom / General Electric (Medupi Power Station)
(2015-11 - 2017-04)
- Provide in detail support and understanding with regards to drawings and cable schedules for cable erection
- Pre-commissioning tests as per relevant standard specifications
- Assist with planning of resources for specific task during construction
- Job preparation and pre-checks to ensure all materials are available and all required tools and equipment are available for both subcontracted and Self Performance erection works
- Ensure that all task as per milestone are accomplished within schedule
- Reviews with contractor's inspection and test plans for construction activities
- Performs necessary inspection for hold points of construction issue
- Organize site/places of work, so that work is carried out to the required standards with minimum risk to employees, equipment and materials
- Monitor daily activities and work sequences of Sub-contractor to ensure compliance with specification, standards
- Confirms construction progress quantities, control effective compliance with the daily routine scheduled and the equipment's are properly mounted as per requirements
- Analyze and confirms the results of control subjected by the subcontractors
- Prepare non-conformance documents and reports of identified quality problems
- Ensure that all work which requires completion is recorded on interface schedules or punch lists
- Prepare inspection completion report, drawings and red mark
- Ensure that Design Change on the plant are maintained
- Completes punch list walk downs, identify punch list items and monitor punch list status
- Updates punch list work database with punch list item information as necessary
- Supervise modification/repairs arising during commissioning activities
Electrical Foreman / QC Inspector - Dynamic Instruments (Matla Power Station)
(2015-05 - 2015-10)
- Oversee installation of E&I equipment, cable racking/junction boxes/cabling, together with the Quality inspection and sign off
Electrical Foreman - Kentz (Engen Refinery)
(2014-06 - 2014-09)
Electrician - Phakisa Technical Services (Sasol Wax Plant)
(2013-03 - 2013-09)
Electrician - Group Five (Engen Refinery)
(2012-12 - 2013-01)