Project electrician at Neksol engineering Pty (2025-08 – Present)
- Project at whimms plant, install vibration screen, whimms panels and commission install soft starters panel
- Install safety device on conveyor belts
- Install PLC level indicator
- Install density meters
- Install pumps
- Install VSD panels and commission
- Working on milling and DMS section
- Install feeder breaker, jaw crusher
- Install cone crusher and do calibration and maintenance
- Do maintenance at wet plant to all the pump
- Do weekly inspection on conveyor belts
- Check all safety device on belt
- Install plant camera's
- Do cable suspension
- Install magnetic separator
- Pressure washer panels
- Load balancing on lights
- Install emergency lights
- Maintenance on change over generator
- Report to foreman
- Do monthly log books on all electrical equipment
- MCC maintenance and inspection
Chrome plant electrician at Chromtech Holdings pty (2018-02 – 2025-07)
- Maintenance at recovery chrome plant to all electrical equipment such as pumps, 3phase motors, single phase motors
- Install VSD panels and commission
- Install soft starters panel and maintain
- Install level indicator, density meters working in hand with instrumentations
- Install flocculant plant panels and maintain
- Maintenance at lab electrical equipment such as pulverized machine
- Load balancing equipment
- Extraction force fan's
- Compressor maintenance
- ICP chemical machine
- Weight bridge scale
- Install robots
- Working on SCADA system monitoring
- Magnetic separator maintain and do monthly log books for all electrical equipment
Coal plants electrician at Joe Singh coal plants wash (2015-06 – 2017-06)
- Maintenance on coal processing plant
- Install vibration screen
- Install conveyor belts with all electrical safety devices
- Install feeder breaker
- Install magnetic coal separator
- Wiring of DOL starter panels
- Sequence started
- Forward/reverse starter panels
- Star/Delta panels and do monthly log books and standby
Electrician Artisan at Impala platinum mine (2007-01 – 2014-06)
- Maintenance on all electrical equipment underground such as locomotives
- Installation of winches
- Maintenance on flameproof panels
- Rewiring of DOL starter
- Sequence started
- Star Delta panels
- Install extraction force fan's
- Maintain substation
- Do load balancing on lights
- Install refuse bay intercoms and do monthly log books on all electrical equipment