Makunyane Monate
SEMI-SKILLED WELDER
Hire this person
Send a job offer directly to this candidate
About
P.T.O(PLANNED TASK OBSEVATION COMPLETE DAILY RISK ASSESSMENT WORK ORDERS COMPLETE
Experience
SEMI-SKILLED WELDER - KROONDAL PLATINUM MINE
(2000 - 2005)
- P.T.O(PLANNED TASK OBSEVATION
- COMPLETE DAILY RISK ASSESSMENT
- WORK ORDERS COMPLETE
- FABRICATION OF PIPES
- FABRICATION AND REPAIR LINERS ON SHUTES
- WELD BERNOX AND MELT STEEL WITH CO2 OR ARK WELDING
- CUTT STEELS WITH GAS BOTTLES
- HOUSEKEEPING
SEMI-SKILLED WELDER - OIL TECHNOLOGY SYSTEM(GLENCOR PHASE 1 PROJECT)
(2006 - 2006)
ONE YEAR
- P.T.O(PLANNED TASK OBSEVATION)
- COMPLETE DAILY RISK ASSESSMENT
- COMPLETE WORK ORDER
- FABRICATION OF HYDRAULIC BRACKETS
- FABRICATION OF POWER PACK STAN
- CUTT WITH GAS BOTTLES
- WELD CAST IRON WITH ARK WELDING
- HOUSEKEEPING
PLANT MILLWRIGHT ARTISAN - EASTPLATS(CROCODILE RIVER PLATINUM MINE)
(2010 - 2013)
- P.T.O(PLANNED TASK OBSEVATION)
- COMPLETE DAILY RISK ASSESSMENT
- COMPLETE WORK ORDER ON SAP SYSTEM
- FAULD FINDING ON ELECTRICAL PANEL
- LIGHTS INSTALLATION
- MEDIUM CABLE JOINT
- READING ELECTRICAL DRAWING
- FAULT FINDING ON HYDRAULIC SYSTEM
- READ HYDRAULIC SCHEMATIC DIAGRAM
- V-BELTS REPLACEMENT
- COUPLING REPLACEMENT(SPIDER COUPLING, DISC COUPLING, RUBBER COUPLING etc)
- MAINTENANCE ON CONVEYOR BELTS
- MAITENANCE ON SLURRY PUMPS AND CENTRIFUGAL PUMPS
- MULTISTAGE PUMPS
- POSITIVE DISPLACEMENT PUMP
- REPLACEMENT OF BEARING
- CONVEYOR BELT SPLICING WITH CLIPS (MECHANICAL BELT FASTENING)
- CONVEYOR BEL COLD SPLICING
- MAITENANCE ON JAW CRUSHER
- MAINTENANCE ON CONE CRUSHER
- MAINTANANCE ON DOUBLE ROLLER CRUSHER
- MAINTENANCE ON HEAVY DUTY VABRATING SCREEN
- HOUSEKEEPING
ELECTRICIAN - SAN CONTRACTING(GLENCOR PHASE 2 PROJECT)
(2014 - 2014)
SIX MONTHS
- P.T.O(PLANNED TASK OBSEVATION)
- COMPLETE DAILY RISK ASSESSMENT
- COMPLETE WORK ORDER
- NEW CONVEYOR WIRING
- CONNETION ON MEDIUM CABLE
- NEW LIGHTS INTALLATION
- WIRING PUMPS PANEL
- HOUSEKEEPING
ENGINEERING SUPERVISOR WITH 2.9.2 MHSA APPOINTMENT - HALCYDOX MINING CONSTRACTION(ATOK MINE)
(2014-07 - 2015-04)
- P.T.O(PLANNED TASK OBSEVATION)
- COMPLETE DAILY RISK ASSESSMENT
- COPLETE WORK ORDER
- NEW CONVEYOER BELT INSTALLATION
- NEW CONNETION ON ELECTRICAL PANEL
- BUILD AND CONECT ELECTRICAL PANEL
- INSTALLATION OF HEAD AND TAIL DRIVES PULLEY
- IN-LINE FEEDER INSTALLATION
- INSTALLATION OF HEAVY DUTY VABRATING SCREEN
- DUAL STATER BOX PANEL WIRING AND INSTALLATION
- H YDRAULIC POWER PACK CONNECTION ON THE SYSTEM
- BOX FRONT SHUTES FABRICATION AND INSTALLATION
- ROCK BREAKER INSTALLATION AND CONNECTION
- HOUSEKEEPING
MILLWRIGHT (SHIFTS); TECHNICIAN - HMH (SAW MILL PLANT)
(2015-05 - 2021-11)
KEY PERFOMANCE/DAILY TASK AND PREVENTETIVE MAINTANACE
- P.T.O(PLANNED TASK OBSEVATION)
- COMPLETE DAILY RISK ASSESSMENT
- COMPLETE WORK ORDER WITH AUX 2012 ERP
- MAINTANANCE ON LINKEN AND MORHINGER FRAME SAW
- ADJUST SLIDES AND REPLACE ON FRAME SAW
- WEEKLY INSPECTION ON THOMPSON BOILER
- PREVENTETIVE MAINTANANCE ON BOILER
- FAULT FINDING INSTALLATION PROGRAMMING ON PLC SYSTEM S7 (VSD’s, FSD’s, SEMO CODES e.t.c)
- INSTALLATION AND PROGRAM OF SOFT SARTER (WEG SOFT STARTER)
- INSPECTION AND FAULT FINDING ON SENSOR AND RESPONTED SENSOR
- CALIBRATION OF LAISOR ON THE MACHINES
- FAULT FINDING ON HYDRAULIC SYSTEM
- ALIGNING SLICES ON FRAMES SAW MONTHLY
- TENSION LINER BLATE FRAMES SAW ON MONTHLY
- PREVENTETIVE MANTANANCE ON FINGER JOIN MACHINE
- PREVENTETIVE MAINTANANCE ON CONTI PRESS MACHINE
- PREVENTETIVE MAINTANANCE ON THICKNESS PLANER
- PREVENTETIVE MAINTANANCE ON SPEED TRIP
- PREVENTETIVE MAINTANANCE ON SCRAPER CONVEYOR
- PREVENTETIVE MAINTANANCE ON SEQUENCE CONVEYOR
- PREVENTETIVE MANTANANCE ON CHAINES DRIVES AND SPROCKETS
- CONVEYOR BELTS SPLICING COLD SPLICING ANS MECH FASTENING
- PREVENTETIVE MANTANANCE ON TFD(WOOD DRYING SYSTEM)
- CHANGING BLOWN FUSES ON 22KW POWER OVER HEAD LINE
- INSPETION ON OVER HEAD LINE WEEKLY
- WEEKLY INSPESTION ON STANBY GENERATOR
- WEEKLY INSPECTION ON CHOP OVER PANELS
- WEEKLY INSPECTION ON COMPRESOR
- HOSEKEEPING
MILLWRIGHT (SHIFTS) - MINOPEX MINERAL PROCESSING - PLANT MAINTENANCE
(2021-12)
KEY PERFORMANCE/DAILY TASK PREVENTETIVES MAINTENANCE
- MAINTENANCE ON CONVEYOR BELTS
- MAINTENANCE ON PUMPS(FILTRATE, MULTI STAGE, SLURRY PUMPS, SPINDLE SPILLAGE PUMPS e.t.c)
- REPLACE WORN V-BELTS AND COUPLINGS
- REPLACE WORN PACKINGS ON THE PUMPS AND AGITATORS
- MAINTENANCE ON VACUUM PUMPS AND RECEIVER TANKS
- MAINTENANCE ON DISC FILTERS
- MAINTENANCE ON BALL MILL
- CONTACT BALL MILL BARING
- MAINTENANCE ON AGITATORS
- MAINTENANCE ON THICKNER RAKE
- FAULT FINDING AND INSTALLATION PROGRAMMING ON PLC S7 (SOFT STARTER, SEMO CODES, VSD's, FSD’s, LIMIT TRANSMITERS, PROXIMITERS)
- DAILY, WEEKLY AND MONTHLY INSPECTION AT MCC SUBSTATIONS
- DAILY, WEEKLY AND MONTHLY INSPECTION AT MEDIUM VOLTAGE SUBSTATION
- MAINTENANCE ON LIGHTS AND ELECTRICAL DB’s
- MAINTENANCE ON CYCLONE
- MAINTENANCE ON FIVE DECK SCREENS AND VIBRATION MOTORS
- MAINTENANCE ON EMS(ELECTRO MAGNETIC SEPARATOR)
- MAINTENANCE AND REPLACE VALVE’s
- MAINTENANCE ON GEARBOX LUB SYSTEM AND HEAT EXCHANGER
- MAINTENANCE ON COOLING TOWER
- HOUSEKEEPING
ACTING GENERAL ENGINEERING SUPERVISOR - MINOPEX MINERAL PROCESSING - PLANT MAINTENANCE
(2023-01 - 2025-01)
KEY PERFORMANCE/DAILY TASK PREVENTETIVES MAINTENANCE
- TEAM LEADERSHIP AND MANAGEMENT
- ASSIGN TASK. MONITOR DAILY WORKFLOW
- PROVITE BREAKDOWN FEEDBAK
Education
GRADE 11 - N.SOTHO, ENGLISH, BIOLOGY, PHYSICAL SCIENCE, AGRICALTURE, MATHEMATICS - KGAHLANONG HIGH SCHOOL (1999)
ELECTRICAL TRADE THEORY [N1] - ELECTRICAL TRADETHEORY, INDUSTRIAL ELECTRONICS, MATHEMATICS, ENGINEERING SCIENCE - WITBANK FET COLLEGE (2004)
ELECTRICAL TRADE THEORY [N2] - ELECTRICAL TRADETHEORY, INDUSTRIAL ELECTRONICS, MATHEMATICS, ENGINEERING SCIENCE - WITBANK FET COLLEGE (2005)
ELECTRICAL TRADE THEORY [N3] - ELECTRICAL TRADETHEORY, INDUSTRIAL ELECTRONICS, MATHEMATICS, ENGINEERING SCIENCE - STRAUSBERG TVET COLLEGE (2024)
ELECTRICAL TRADE THEORY [N4] - ELECTROTECHNICS, INDUSTRIAL ELECTRONICS, MATHEMATICS, ENGINEERING SCIENCE - BEST PERFOMANCE TVET COLLEGE (2024)
