Skip to main content
Mathibele Simon

Mathibele Simon

APPRENTICESHIP BOILERMAKER

Talent
Rustenburg, North-WestMember since August 19, 2026
FABRICATIONWELDINGASSEMBLYPIPE INSTALLATIONMAINTENANCEMINE HEALTH AND SAFETY STANDARD
·

Hire this person

Send a job offer directly to this candidate

FABRICATIONWELDINGASSEMBLYPIPE INSTALLATIONMAINTENANCE

About

CONDUCT FABRICATION, WELDING AND ASSEMBLY REPAIR STRUCTURAL STEELWORK CHUTE CONVERYOR BELT STRUCTURE PIPE DEVELOP AND INSTALLATION

Experience

APPRENTICESHIP BOILERMAKER - DELMAS COAL MINE

(2013-10-15 - 2015-07-22)

  • CONDUCT FABRICATION, WELDING AND ASSEMBLY
  • REPAIR STRUCTURAL STEELWORK CHUTE CONVERYOR BELT STRUCTURE
  • PIPE DEVELOP AND INSTALLATION
  • REPAIR UNDERGROUND TRACKLESS MINING MACHINERY SUCH AS SCOOPE, SUTTEE CARS, FEEDER
  • FABRICATION OF LINER PLATE AND INSTALLATION
  • RESPONSIBLE FOR GENERAL GOODHOUSE KEEPING

PLANT MAINTENANCE - MIP PROJECTS - ANGLO AMERICAN POLOKWANE SMELTER

(2015-01-01 - 2020-12-31)

MINE CLOSED

  • PIPE INSTALLATION AND THICKENS
  • MAINTENANCE
  • REPAIR THICJER BRIGER
  • INSTALLATION GRATING
  • INSTALLATION OF TOP CHUTE
  • REPAIR GUARDS OF THE THICKNER BRIDGE

PLANT MAINTENANCE BOILERMAKER - NEKSOL ENGINEERING - RHOVAN MINING

(2023-05-08 - 2024-08-31)

SHUTDOWN

UNDERGROUND BOILERMAKER - TRIPLE M MINING - IMPALA PLATINUM MINE (1 SHAFT LEVEL 19)

(2024-09-01)

  • SERVICE LOCO
  • SERVICES GUARDS COR
  • SERVICES RAIL

PLANT BOILERMAKER - NEKSOL ENGINEERING - RHOVAN MINING

(2023-04-01 - 2024-08-30)

FIXED TERM

  • REPAIR CRUSHER PLANT
  • FABRICATION OF LINER PLATE AND INSTALLATION
  • CUTTING WORN LINER PLATE INSIDE THE TIP APRON CRUSHER
  • REPAIR CHUTE
  • PIPE DEVELOP AND INSTALLATION
  • FOLLOW THE SAFETY RULE ACCORDING TO MINE HEALTH AND SAFETY STANDARD

Education

GRADE 12(STD 10) - MOKGERETI SECONDARY SCHOOL (1995)

N1-N3 MECHANICAL SUBJECTS - MECHANICAL SUBJECTS - NKANGALA FET COLLEGE (2004 - 2005)

Skills

APPRENTICESHIP BOILERMAKER

Reviews