Chief Surveyor at Kipushi Corporation – Ivanhoe Mines (2025-04 – Present)
- Managing the daily Survey department routines and requirements
- Daily / Monthly total reconciliation of all mining and processing production results (Underground drone with Lidar)
- Liaising with all departments in assisting mining / Engineering
- Planning and forecasting for budget purposes, and monitoring Ore Reserve build up
- Staffing of Survey department as per requirements
- Advising on Planning and Life of mine build up and profile
- Direct interaction with long term planning consultants, with regards to depletions, mining methods and Tonnage deliveries
- Preparing production performance summaries and statistical reports for monthly review meetings
- Yearly Ore reserve depletions and calculations for Competent persons report
Mineral Resource Manager at Bauba Moeijelijk Mine – ASB Batlhabani (2024-02 – 2025-03)
- Managing the daily Technical Services routines and requirements
- Daily / Monthly total reconciliation of all mining and processing production results
- Liaising with all departments in assisting mining / Engineering
- Planning and forecasting for budget purposes, and monitoring Ore Reserve build up
- Pre-Feasibility studies of acquisition of adjacent mining areas
- Staffing of MRM department as per requirements
- Advising on Planning and Life of mine build up and profile
- Direct interaction with Client company, with regards to envisaged recovery, mining methods and Tonnage deliveries
- Establishing office, department and systems (Transition from Start up, Projects – Production)
- Preparing production performance summaries and statistical reports for monthly scrutiny meetings
- Yearly Ore reserve depletions and calculations for Competent persons report
Chief Surveyor at Eland Platinum Mine – Northam Platinum Limited (2023-07 – 2024-01)
- Managing the daily Survey department routines and requirements
- Daily / Monthly total reconciliation of all mining and processing production results
- Liaising with all departments in assisting mining / Engineering
- Planning and forecasting for budget purposes, and monitoring Ore Reserve build up
- Complying with statuary requirements as prescribed by the department of mineral resources
- Weekly, monthly and annual volumetric surveys of ROM stocks by means of aerial survey methodologies (Drone Surveys)
- Engineering Surveys with LIDAR and Multi stations
- Ad-Hoc Setting out work as construction requires
- Implementing full State-of-art systems for survey (Traditional methods, Industry best Practices)
- Establishing office, department and systems (Transition Projects – Production)
- Preparing production performance summaries and statistical reports for monthly scrutiny meetings
- Yearly Ore reserve depletions and calculations for Competent persons report
Survey Superintendent at Marikana K4 Projects – Sibanye Stillwater (2022-02 – 2023-06)
- Managing the daily Survey department routines and requirements
- Daily / Monthly total reconciliation of all mining and processing production results
- Liaising with all departments in assisting mining / Engineering
- Planning and forecasting for budget purposes, and monitoring Ore Reserve build up
- Complying with statuary requirements as prescribed by the department of mineral resources
- Deformation monitoring and volumetric surveys with LIDAR, and reporting thereof (Zeb Horizon)
- Engineering Surveys with LIDAR and Multi stations
- Ad-Hoc Setting out work as construction requires
- Implementing full State-of-art systems for survey (Traditional methods, Industry best Practices)
- Establishing office, department and systems (Transition Projects – Production)
- Advising other operating mines with systems and best practices
- Yearly Ore reserve depletions and calculations for Competent persons report
Survey Manager at Cullinan Diamond Mine – Petra Diamonds (2014-01 – 2021-12)
- Managing the daily Survey department routines and requirements
- Daily / Monthly total reconciliation of all mining and processing production results, including underground, Surface mining and Tailings retreatment
- Liaising with all departments in assisting mining
- Planning and forecasting for budget purposes
- Complying with statuary requirements as prescribed by the department of mineral resources
- Deformation monitoring and volumetric surveys with LIDAR, and reporting thereof (Riegl)
- Engineering Surveys with LIDAR and Multi stations
- Monitoring of retaining slimes dam wall adjacent to mining property
- Ad-Hoc Setting out work as construction requires
- Implemented full Monitoring systems for open pit, underground, residential areas and Vertical shafts (Geo Explore / Hub)
- Relieving for The Technical Services manager
- Yearly Ore reserve depletions and calculations for Competent persons report
- Advising other sister mines with systems and best practices
Chief Surveyor at Impala Platinum 20 shaft project – Implats (2009-03 – 2014-01)
- Establishing and managing the daily Survey department routines and requirements
- Monthly total reconciliation of all mining and processing production results
- Liaising with all departments in assisting mining
- Planning and forecasting for budget purposes
- Complying with statuary requirements as prescribed by the department of mineral resources
- Ad-Hoc setting out work as construction requires
- Engineering Surveys with LIDAR (FARRO)