Skip to main content
Peter Coleman

Peter Coleman

Project Manager

Talent
Johannesburg, City of Johannesburg Metropolitan MunicipalityMember since June 6, 2023
·

Hire this person

Send a job offer directly to this candidate

About

I was RM MS for OTT in GAU JHB. I am very good at Managing any type of Project even Multiple Projects that can run simultaneously. I am in GAU JHB and avilable immedaitely if required.

Experience

Skills & Abilities: 

PROJECT MANAGEMENT FTTS & FTTH RAN & IPRAN TRANSMISSION BTS

Experience:

TELKOM ELECTRICAIN | TELKOM SOUTH AFRICA| 1988-1996 

· M A I N T E N A N C E ELETRO MECHANICAL EXCHANGES

· S W I T C H I N G ACCEPTANCE

· S P E C I A L INVESTIGATIONS

· A U T O CONSTRUCTION

· C A R R I E R S CONSTRUCTION

· Q U L A I T Y CONTROL

· C P 2 4 CONSTRUCTION, MAITENANCE AND COMMISSIONING

PROJECTS COMMISSIONING TECHNICIAN | NZ TELECOM| 1997-1998 

· I N S T A L L E D AND COMMISSIONED MADORI CARD PHONES

· I N S T A L L E D AND COMMISSIONED EXICOM RAIOS AND REPEATERS

· P R O G R A M M I N G MOTOROLLA GP300 AND GM 300 RADIOS

· I N S T A L L E D AND COMISSIONED SPECTRUM II RADIOS

· I N S T A L L E D AND COMISSIONED DXR 100 AND DXR 200 RADIOS

· I N S T A L L E D AND COMMISSIONED SPECTRUM II RADIOS

· M A I N T E N A N C E REPEATER HIGH SITES AND LEVEL CROSSING WITH TRACK BOXES TEAM LEADER AND SITE SUPERVISOR | ACE TELECOM | 1999-2004

· A V I A T N E T W O R K S E C L I P S E R A D I O NEW SITE INSTALLATION AND COMMISSIONING

· A V I A T N E T W O R K S E C L I P S E R A D I O UPGRADE LINKS INSTALLATION AND COMMISSIONING

· A V I A T N E T W O R K S E C L I P S E R A D I O P D H L I N K S 4 E 1 - 3 2 E 1 S D H L I N K S S T M 1 & S T M 2 S P A C E D I V E R S I T Y

· A N T E N A E S I Z E S F O R A V I A T N E T W O R K S P D H L I N K S 0 . 3 m - 1 . 8 m S D H L i n k s 1 . 2 m - 2 . 4 m

· F A U L T FINDING AND CLEARING FAULTS · SIGNED ACCEPTANCE DOCUMENT

REFERENCE: ROBIN FLETCHER:

NATIONAL ROLLOUT MANAGER | MC NAIR NIGERIA | 2005-2012 

· A V I A T N E T W O R K S E C L I P S E & E R I C S S O N T R A F F I C N O D E NEW SITE INSTALLATION AND COMMISSIONING

· A V I A T N E T W O R K S E C L I P S E & E R I C S S O N T R A F F I C N O D E UPGRADE LINKS INSTALLATION & COMMISSIONING

· A V I A T N E T W O R K S E C L I P S E R A D I O P D H L I N K S 4 E 1 - 3 2 E 1 S D H L I N K S S T M 1 & S T M 2 S P A C E D I V E R S I T Y

· A N T E N A E S I Z E S F O R A V I A T N E T W O R K S P D H L i n k s 0 . 3 m - 1 . 8 m S D H L i n k s 1 . 2 m - 2 . 4 m

· E R I C S S O N T R A F F I C N O D E P D H L I N K S 4 E 1 - 3 2 E 1 A N D S D H L I N K S S T M 1

· A N T E N A E S I Z E S F O R E R I C S S O N L I N K S P D H 0 . 3 m - 1 . 8 m S D H 1 . 2 m - 1 . 8 m

· R B S 6 0 0 0 I N S T A L L A T I O N A N D C O M M I S S I O N I N G

· W A R E H O U S I N G S E N D E Q U I P M E N T T O A L L R E G I O N S F O R M O N T H L Y P L A N N E D R O L L O U T .

· F A U L T FINDING AND CLEARING FAULTS

· SIGNED ACCEPTANCE DOCUMENTS

· P R E P A R E PURCHASE ORDERS

· P A Y M E N T RELEASE TO CONTRACTORS

REFERENCE: MARK HIBBERT: 

IMPLEMENTATION MANAGER | ERICSSON RSSA | 2014-2016 

· I P R A N PROJECT 1800 SITES – SIU INSTALLATION & COMMISSIONING

· A S S E T VERIFICATION 3000 SITES – ALL REGIONS

· F L L D B A C K L O G C L E A R E D – A L L R E G I O N S

REFERENCE: JACQUES HOLL: REFERENCE: VISHAL JEK MOHAN: 

PROJECT MANAGER | CONFIANCE TOWERS RSSA | 2016-2017 

· VODACOM BEP 1.0 PROJECT

· HUAWEI FTTS PROJECT

REFERENCE: JULIUS NDYETABULA: 

SPECILAIST FIBRE HARDWARE TESTING CONSULTANT | VENTURA NEXT SE | 2018 

· TESTING SFP

· TESTING CPE

· TESTING HUAWEI SITCHES

· GOING TO SITE TO CHECK THE TEAMS QUALITY OF THE INSTALLATION AND IF THE EQUIPMENT IS INSTALLED CORRECTLY AND ACCORDING TO SPECIFICATIONS.

SEND DAILY SUMMARY OF ALL TESTING DONE AT THE WAREHOUSE AND GIVE TEST RESPORTS AND RECOMMENDATIONS.LIASE WITH THE CLIENT TO TEST ALL FAULT EQUIPMENT.

REFERENCE: OLLE RISBERG:

 

 

 

ILO HULUMENDE GROUP 2019 UNTIL PRESENT / BASED IN CENTRAL REGION BLOEMFONTEIN 

 

· LONG HAUL AUDITS ON THE LINKS HUAWEI HAVE INSTALLED IN CENTRAL REGION · PTP AUDITS ON THE LINKS ERICSSON HAVE INSTALLED IN CENTRAL REGION · PMP AUDITS ON THE LINKS HUAWEI HAVE INSTALLED IN CENTRAL REGION.

· GOING TO SITE TO CHECK THE TEAMS QUALITY OF THE INSTALLATION AND IF THE EQUIPMENT IS INSTALLED CORRECTLY AND ACCORDING TO THE MTN SPECIFICATIONS.

SEND WEEKLY AUDIT REPORTS TO MTN OF ALL THE SITES AUDITED THE PREVIOUS WEEK AND GIVE RECOMMENDATIONS.

LIASE WITH THE MTN AND HUAWEI ON ALL THE SITES WHERE THE AUDITS HAVE BEEN COMPLETED.

REFERENCE: CAREL KRIEL: 

SITE ENGINEER DV8 TECHNOLGY GROUP 2021 UNTIL PRESENT

INSTALL PTP LINKS

INSTALL PMP LINKS

DO QC ON ALL INSTALLTIONS AE PER MTN SPECIFICATION

DO CMOD’S FOR ALL LINKS INSTALLED

REFERENCE: STEPHEN FOUCHE

RM for MS GAU JHB for OTT ( 11th November 2021 until 12th May 2023)

Allocate FME’s for PM AND Site Battery Audits.

Manage MS FME’s and Refuelers in the Field (Total FME’s and Refuelers 39)

Arrange Access as per the Access Tracker for Telkom, Eskom and other LL as per the requirement on the Access Tracker.)

Send Fuel Request as required to Fleet for any FME or Refueler that requires Fuel.

Daily Reporting on Efficiency of the Teams.

Weekly Governance for Tagging compliance, SLA Non- compliance and Productivity of the Teams.

Any other Task as requested by the Client will attend and update Daily.

Reference: Bongani Buthelezi

Reason for Leaving: Contract was not renewed.

Education

Education:

PORT ELIZABETH TECHNICAL HIGH SCHOOL

Courses Completed:

PROJECT MANAGEMENT DEMYSTIFIED

MS PROJECT COURSE

ANDREWS TERRESTRIAL MICROWAVE SYSTEMS

AVIAT NETWORKS ECLIPSE INSTALLATION COURSE

ERICSSON RBS 6201 6202 BBS INSTALLATION

ERICSSON TRAFFIC NODE INSTALLATION COURSE

ERICSSON MINI-LH INSTALLATION COURSE

CAMBRIDGE VST-ENG COURSE

ALCATEL-NOKIA SAR UNITS NODE INSTALLATION AND COMMISSIONING

Reviews

Related