Shawzy Willie
QUALITY CONTROL OFFICER
Hire this person
Send a job offer directly to this candidate
About
I am a dedicated Quality Control Officer at Pinggao Africa with over five years of experience in the energy and construction sectors. My career began at Eskom, where I served as a Senior Construction Officer and later as a Clerk of Works in the Program Management Distribution division. I also held positions as a Project Coordinator and Inspector at Dikgatlo Kopano Services.
Throughout my career, I have demonstrated strong reliability, technical competence, and a results-oriented approach. I have successfully overseen numerous quality control projects, with expertise in the construction of high-voltage (HV) lines and substations, among other related areas. My skill set spans a wide range of quality inspection tasks, ensuring that each project I manage delivers high-quality outcomes tailored to client needs and industry standards.
Experience
QUALITY CONTROL OFFICER at Pinggao Africa (2024-03 – Present)
- Provide an effective site project quality services to support the quality Assurance.
- Manager and Construction Manager in order to ensure that all allocated projects are completed within the time, cost and quality creteria as stipulated within the contractual agreement.
- Check the project quality and progress.
- Make sure for succeful project completion.
- Complaince to Statutory Regulations standards procedures and instructions.
- Adhere to the latest standard,procedures and policies.
- Monitoring contractors overall performances on site in order to achieve excellent results.
- Inspecting work done by contractor to ensure adherence to standards and specifications.
- Notifying contractors on quality programme deficiencies and suggest possible corrective actions.
- Performing follow-up activities to determine the effectiveness of the corrective actions.
- Conducting regular surveillance on contractors quality programme in order to ensure that contractor requirements are met.
- Attending contractors quality control meetings to discuss quality requirements,non-confirmances identified,corrective actions,audits and surveillance schedules.
- Documenting contractors quality programme deficiencies and nonconformances and transmits these to the reevant contractor,construction manager and project management staff.
- Monitoring that contractors adhere to statutory requirements and safety standards.
- Discussing all related problems with the project manager,project coordinators and construction manager relating to procedurerequired.
- Issuing non financial implicated site instructions on behalf of project manager or co-ordinator.
- Assiting in the co-ordination and monitors the delivery and usage of material to site.
- Checking delivery of materials to site together with contractors toensure requirements are met.
CLERK OF WORK (ACTING PROJECT COORDINATOR) at Eskom Program Management Distribution (2011-10 – 2016-02)
- Ensuring documents,in conjuction with the contractor,regarding the state of the project siteproir to beginning of project.
- Maintain a register of any complaints and queries raised by members of the public at the site office.
- Making sure contractors adhere to health and safety measurements.
- Construction activities commencing are drawn up.
- Doing quality inspections on the Project.
- Ordering material reservations for the project.
- Arranging outages for commissioning for the contractor with the Eskom CNC's.
- Making sure that project is completed in time and there are no over roll projects.
- Making payment to contractor and checking if the work claimed on invoice is for the work done on site,correctly billed and compare before signing the invoice and payment certificate.
- Looking over installation of new electrified house holds infills projects and electrification projects.
- Arrange information for kick off meetings with stakeholders and any interested and affected parties about the impending construction activities.
- Inspect contractors working on substation refirbishement projects.
SENIOR CONSTRUCTION OFFICIAL at Eskom Major Engineering Works (2008-05 – 2011-08)
- Conduct all on-siteBuilding of 88-132KV lines input and update results.
- Supervised test engineer teams on multiple projects through out the provice on various high voltage lines.
- Performed wiring duties on transformers marshall and Control Room.
- Submitted daily reports testing update s and progress report.
- Performed several pole replacement duties for integrity inspections for various projects across the province.
- Surveyed potential sites for enviromentally progresive building by developing pilot projects in collaboration with envirometal engineers and reseachers.
- Supply method statements timeously for all activities requiring special attention as specfied.
- Be conversant with the requirements of the project specifications.
- Comply with all applicable legislation.
- Construction of substations and refirbishment of substations.
- Pulling of elecrticl cables for substation apperratus.
- Assembling of steel structure for substation apperratus.
Education
HIGHER NATIONAL CERTIFICATE – Northern Cape College (2008)
DEGREE – William Pescod Primary School