Skip to main content
Adrian Ramdass

Adrian Ramdass

Electrical/Project Manager

Talent
Brampton, ONMember since August 11, 2026
RSLogix Studio 5000RSLogix 500Electrical Safety
·

Hire this person

Send a job offer directly to this candidate

RSLogix Studio 5000RSLogix 500Electrical Safety

About

Allocating and Controlling department manpower Maintains and carry out work on electrical equipment and components to ensure maximum efficiencies on plant are achieved. Ensures all service procedures, checks and inspections outlined in the PM and other work orders are completed on time and to specifications.

Experience

Electrical/Project Manager - S.M Jaleel & Company Ltd

(2020-05)

  • Allocating and Controlling department manpower
  • Maintains and carry out work on electrical equipment and components to ensure maximum efficiencies on plant are achieved.
  • Ensures all service procedures, checks and inspections outlined in the PM and other work orders are completed on time and to specifications.
  • Identifies and recommends opportunities to minimize the cost of operations.
  • Manage reports to ensure duties are performed in accordance with the highest safety and quality standards.
  • Ensure JOB REPORTS are fully completed by reports for all jobs.
  • Ensures that 100% preventative maintenance work orders are completed
  • Ensures all performance appraisals are completed in a timely manner. KPI > (Carry out performance appraisals for all technicians bi-annually at other intervals as deemed appropriate).
  • Analyzes line performance and provides technical support and solutions to increase line efficiency.
  • Liaise with manufacturers for machine upgrades.
  • Upgrades obsolete equipment and components.
  • Analyzes all supplied data and information from vendors to ensure correct and relevant to company projects and ensures the best electrical components, equipment and services available is provided.
  • Interprets the technical possibilities and parameters of projects to ensure optimal advantages and mitigates negative impact.
  • Manages all assigned electrical projects to ensure design specifications, timelines and costs are adhered too.
  • Facilitates evaluation of vendor documentation to ensure it meets company specifications
  • Works in conjunction with Maintenance Team to analyze equipment failures and quality issues to find root causes to determine the preventative and corrective action to be taken.
  • Ensures that all work is carried out to safety specifications and that the workplace remains in a hygienic state to GMP specifications

Project Manager - S.M Jaleel & Company Ltd

(2020-05)

Directed multi-million-dollar engineering, commercial, and industrial projects, consolidating strategic roadmaps, CAPEX budgets, resource plans, and risk registers into a single governance framework that drove alignment, fiscal discipline, and on-time delivery.

  • Aligned Sales, Finance, Supply Chain, Manufacturing, and IT around shared programme objectives, strengthening cross-functional execution, clarifying dependencies, and accelerating informed decision-making.
  • Led financial oversight across a portfolio of initiatives, improving forecast accuracy, strengthening cost control, and increasing variance transparency from project to programme level.
  • Provided executive leadership with structured reporting on project performance, key risks, and critical decisions through dashboards and executive-ready updates.
  • Directed contractor and OEM relationships, governing scope, contracts, and performance to ensure technical integrity, cost control, and on-schedule execution.
  • Installation of New KHS blow molder – Installation of new CSD blow molder to increase speed, reliability and efficiency of line 4.
  • Extension of new Bottling Hall facility infustructure – Expansion of Bottling Hall building to accommodate optimized line layouts and new equipment.
  • Upgrades to Line 3 -. Removing all old equipment to install new bottle conveyors, labelers, case conveyors and robotic palletizers.
  • Upgrades to line 4 - Removing all old equipment to install new bottle conveyors, labeler, case conveyors and robotic palletizers.
  • Upgrades to Electrical for PET building – Installation of new 2.5MVA transformer and power panels to supply power to new preform injection machine.
  • Installation of New syrup room for Line 5 – Installation of new CIP, pasteurizer, mixing tanks to process hot fill productions.
  • Installation of ABC LP compressor – Installation of new low-pressure compressor to ensure a reliable and constant air supply to factory equipment (120psi)
  • Installation of Tech long blower- Installation of new Hot fill blow molder to produce hot fill and nitro hot fill beverages.
  • New AF HP compressor - – Installation of new High-pressure compressor to ensure a reliable and constant air supply to factory equipment (550psi).
  • Upgrades to Line 5 Installation of new blow molding machine, filler upgrades, sleeve labeller, case and bottle conveyors. Line speed increased to 22bph.
  • Ultra filtration system Installation of ultra filtration system to improve water quality into the factory.
  • Line 3 air conveyors Installation of 330ft of empty bottle air conveyors to transport PET bottles from the PET plant to Bottling Hall plant
  • New utility Transformer Installation of 2.5MVA transformer to supply power to boilers, high pressure and low pressure compressors.

Electrical and Instrumentation Engineer - CARIB Glassworks Limited

(2019-02 - 2020-05)

  • Minimize equipment breakdowns through implementing preventative maintenance procedures
  • Allocating and Controlling department manpower
  • Assist in cost effectively sourcing and acquiring new equipment
  • Planning for modifications/installations and test running of existing/ new equipment
  • Effectively handle industrial relation matters with respect subordinates
  • Participate in the development and implementation of, and perform all duties in accordance with the procedures as ISO 9001 standards and CGL quality manual
  • Conduct annual performance appraisal of subordinates and undertake appropriate follow-up actions to develop the capabilities of employees and maximize the efficiency of the department
  • Developing scope of works and bill of materials for various projects
  • Preparing cost estimates and budgets
  • Meets project budgets by monitoring project expenditures
  • Direct and oversee electrical projects from initiation to completion
  • Direct and oversee contractors to ensure separate phases of projects are completed
  • Planning and executing shut-downs and new installations
  • Maintaining electrical systems and enforcing preventative and on-going maintenance
  • Implementing electrical safety by enforcing standards and procedures complying with codes and legal regulations

Electrical Engineer - S.M Jaleel & Company Ltd

(2017-08 - 2019-02)

  • Designing maintenance strategies and procedures for all factory equipment
  • Carrying out routine schedule maintenance work and responding to equipment faults
  • Diagnosing breakdown problems
  • Carrying out inspection on PM procedures for production line equipment
  • Attending to emergencies, unplanned problems and repairs
  • Working with PLC's (Programmable logic controllers) on factory production line
  • Experience with software such as RSLogix Studio 5000 and RSLogix 500
  • Manage projects within cost and time constrained environments
  • Developing scope of works and bill of materials for various projects
  • Preparing cost estimates and budgets
  • Meets project budgets by monitoring project expenditures
  • Direct and oversee electrical projects from initiation to completion
  • Direct and oversee contractors to ensure separate phases of projects are completed
  • Planning and executing shut-downs and new installations
  • Maintaining electrical systems and enforcing preventative and on-going maintenance
  • Implementing electrical safety by enforcing standards and procedures complying with codes and legal regulations

Electrical Engineer - Projects - S.M Jaleel & Company Ltd

(2017-08 - 2019-02)

  • High Voltage testing and corrective works - October 2017 to June 2018: Assisted in High Potential Test of all 12kV and 480Vcables on transformers and switch gears, di-electric test on 12kv transformers, ratio testing of transformers, oil sampling and testing of transformers. This was done to obtain electrical certificates.
  • Factory lighting – February 2018 to June 2018: Design and installation of lighting/ illumination system to increase energy and cost savings.
  • Line 3 and 4 Electrical Upgrade and Corrective works - November 2017 to June 2018: Simplifying the power distribution while increasing the reliability all equipment of each line. A dedicated 480V power panel for both lines. All power cables, ground cables, and cable trays from equipment and respective panels was sized and installed using NEC code. All equipment was ground using IEE standard. I performed the required engineering.
  • Installation and Commission of Lanfranchi Bottle unscrambler - October 2017 to June 2018: Increasing the efficiency of the line. Responsible for designing and installing electrical requirements to equipment.
  • Installation and Commission of Data Capture system – January 2018 to May 2018: This system monitors the efficiency of production to reduce losses. Responsible for designing system as well as installing control and power wiring for sensors and PLC.
  • Installation and Commission of Capacitor banks - October 2017 to March 2018: Power factor correction of the plant to minimize reactive power for energy and cost savings.
  • Motor Preventative Maintenance - October 2017 to January 2018: This project involved the collection of data of all motors from the Bottling Hall plant in SM Jaleel. The Data collected was Voltage, Full Load Amperage, Horse power, Brand, Model Number, Frame Number, Gearbox number, RPM of motor and gearbox, NEMA Size, Insulation Class and K-factor (for use of frequency drives). A spare Asset Register was done where there was always an appropriate motor replacement in the case a motor failed.
  • Installation and Commission of B&H Labeler 8000s - October 2017 to November 2017: Proper sizing of breaker and cables to isolate power from machine in the event of a fault. Ensuring proper grounding is done to Fuji-seal equipment.
  • Installation and Commission of Fuji seal Labeler - October 2017 to November 2017: Responsible for designing and installing electrical requirements to Equipment.
  • Installation and Commission of Dryer – August 2017 to December 2017: Responsible for designing and installing electrical requirements to equipment.
  • Lucozade Syrup Room - August 2017 to December 2017: Planning, identifying and precuring electrical resources needed. Responsible for Designing and installing Transformers, Power panels, AC and lighting. Supplying power and proper grounding to all equipment ensuring they are done according to international standards.
  • Production Factory Structural grounding - September 2017 to November 2017: All grounding in the factory is done according to NEC and IEE standard to ensure safety, reliability and longevity of equipment.
  • HB2 Warehouse Electrical - December 2017 to January 2018: Responsible for Designing, Precuring and Installing Power panels and Dry Type Transformers to supply power to the warehouse.

Education

MSc - Engineering Management - University of the West Indies (UWI), St Augustine (2021-01)

BSc - Electrical and Computer Engineering - University of the West Indies (UWI), St Augustine (2013-01 - 2017-12)

Diploma - Pre-Science - University of the West Indies (UWI), St Augustine (2012-01 - 2013-12)

Skills

Electrical/Project Manager

Reviews

Related