Skip to main content
Dakota Graham

Dakota Graham

Coating Inspection

Talent
Leduc, AlbertaMember since May 30, 2024
·

Hire this person

Send a job offer directly to this candidate

About

Coatings Inspector Lvl 2 – API 1169 Inspector, with over a decade of experience in leading quality assurance, and multi-process inspection for activities within the oil and natural gas facility, tank storage, pipeline integrity, architectural and water products projects. Demonstrate proficiency in defining the scope of work, planning, and executing all inspection / supervision ensuring adherence to the specification, HSE guidelines, professional engineering practices while respecting concerned parties and Indigenous relations. Effective in developing relationships and communicating on all levels from management, trades, and third-party contractors having in-depth knowledge of core crafts processes.

Dedicated to the development and implementation of quality improvement / management processes and maintaining a safe working environment. Finding that technical knowledge along with hands-on real-world experience and diplomacy are always required. Committed to providing cutting-edge competencies in:

 Coating Inspections Programs  Project Planning & Management  Quality Assurance

 Failure Investigation  Codes, Standards, & Interpretation  Risk Management

 Indigenous relationship awareness  Team Building / Leadership  Coaching and Mentoring

Experience

Recent Project List For more details on other shop / field projects & tasks completed please contact me for additional Info.

•

2023 – TCE Manitoba / Ontario Riser Assessment Program – Above/Below Ground Piping.

•

2020 /2022 - CGL / TCE Wilde Lake Triple Compressor Station – 1”- 48” Above/Below Ground Piping and Structural.

•

2020 – TC Energy Wolf Lake Compressor Station – A3 Unit Addition – 2”- 48” Above & Below Ground Piping – Fusion Bonded & Liquid Epoxy.

•

2019 – Primoris Willbros Canada Major Projects- CNRL BP Projects- 42’ Water Line Construction Below Ground – Fusion Bonded & Liquid Epoxy

•

2019 – OCL Group – Syncrude – ISWL (Water pipeline Install) Pipeline Construction 30” Below Ground – Fusion Bonded & Liquid Epoxy.

•

2018/2019 – TransCanada – Elko C/S piping, Burton Creek C/S piping, Various Integrity Dig, Shop and Field Inspections c/w facility structural, above / below ground Piping and Tie-Ins throughout Saskatchewan, Alberta and British Columbia.

•

2018 – OCL Group – CNRL – Horizon – MFT (Mature Fine Tailings) Pipeline Construction 11 Km – 28” Below Ground – Fusion Bonded & Liquid Epoxy.

•

2016/2017 – Barrier Coatings / Trans Canada Integrity Dig and Tether programs c/w facility structural, above / below ground Piping and Tie-Ins.

•

2012/2016 – Gibson Energy - Hardisty East Terminal Expansion – 3 x 211’ and 1 x 238’ Tanks (Internal / External) c/w facility structural, above / below ground Piping and Tie-Ins.– Gibson Energy - Hardisty West Terminal –(Suncor) 4 x 192’ Tanks (Internal and External) c/w facility structural, above / below ground piping and Tie-Ins.

Education

AMPP Certified Coatings Inspector Level 2

API 1169 Pipeline Construction Inspector

Ground Disturbance II

CWB Level 1 Welding Inspector - CSA 178.1, CSA W59, CSA W47.1

Safety Auditor Training

N.C.S.O Certification - National Construction Safety Officer

Defensive Driving – Collision Avoidance

Standard First Aid – C.P.R / A.E.D LEVEL – C

Principles of Health & Safety Management

Transportation of Dangerous Goods (TDG)

Gas Detection & Spill Response

H2S Alive

Common Safety Orientation (CSO)

Confined Space Entry - Monitor

WHMIS 2015 / CSTS 2020

OH&S Legislation Awareness

Bear / Wildlife Awareness

Reviews