Willing to relocate: Anywhere, i’m great working on my feet and I would deal with others as well as communicate great with customers and subcontractors
Send a job offer directly to this candidate
I’m a single man that is hungry to work and experiencing things I believe I can be a great asset to your company. If you give me the chance I’m very good a team player and when it’s time to work, I go to
Lead hand field tech water/sewer pipe rehabilitation at LIQUIFORCE SERVICES (2023-07 – 2026-04)
CNC Machinist at Silent-Aire (2022-01 – 2023-06)
Weekend night shift, from Friday to Sunday, 6pm - 6 am
Ironworker Apprentice at Harris rebar (2021-03 – 2021-12)
Labourer at Altex Industries Inc (2019-10 – 2021-08)
Grinding materials, vessels prep work for welders some fitting and tacking, stick welding other labouring duties, clean up work area rap cables up working on stainless aluminum mild steel, very good with grinder and power tools,over head crane 55 tone, using of zoom boom
Iron Worker/ shop labourer at IMPACT INDUSTRIAL LTD (2018-12 – 2019-09)
Out of town 14 days on 7 days off, Was connector for structural steel Sub contracted off pcl, very familiar installing And rigging up i beams, based out of new west minister fly in fly out In the shop - Grinding materials prepping for welding shipping and receiving and handling materials loading and unloading mild steel stainless steel aluminum plates beams HSS flat bar angle
Swamper/Labourer at Orion Environmental Services Ltd. (2016-06 – 2018-02)
Responsibilities Cut a starting hole to make trench etc. using a 4 foot wand with pressured tip, to cut through the rough ground we use H2o at psi of (1500-3000 psi ) Rig out Boom / Set Pressure an temp Rig out wand an hose, Secure truck Line locates, make trench, sink sheer boxes Directed drilling, cleaning up rig waste, etc. Clean out at the dump, wash truck with Pressure washer when end of of day, clean out truck, sweep shop, labour duties, etc.
Swamper/Labourer Hydro vac Swamper at McCrae's Environmental Services Inc (2015-09 – 2016-04)
Cut a starting hole to make trench etc. using a 4 foot wand with pressured tip, to cut through the rough ground we use H2o at psi of (1500-3000 psi) Rig out Boom / Set Pressure and temp Rig out wand a hose, secure truck Line locates, make trench, and sink sheer boxes Directed drilling, cleaning up rig waste, etc. Clean out at the dump, wash truck with Pressure washer when end of of day, clean out truck, sweep shop, labour duties, etc.
Steamfitter/Pipefitter at ROBWEL CONSTRUCTORS (2014-11 – 2015-03)
Mostly doing deficiency Work up at cenovus energy at foster creek
Landscaper lead hand at G&S landscaping services (2011-04 – 2014-10)
Business management – Academy of learning (2017-12 – 2018-08)